DE20260006
rev 0Highway
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0013-009 | $55.00 | $35.48 | $90.48 |
| Bricklayer Building BRDE0001-001 | $34.19 | $27.98 | $62.17 |
| BRICKLAYER Brick Refractory/Brick Placement Worker Building BRDE0001-001 | $35.00 | $24.57 | $59.57 |
| CARPENTER Highway SUDE2022-003 | $39.67 | $5.08 | $44.75 |
| CARPENTER Building CARP0173-011 (Includes Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation, Scaffold Building, Excludes Masonry/Brick, and Excludes Soft Floor Layer) | $32.87 | $18.98 | $51.85 |
| CARPENTER (Includes Form Work) Heavy CARP0173-010 | $38.27 | $25.34 | $63.61 |
| CEMENT MASON/CONCRETE FINISHER Highway SUDE2022-003 | $30.41 | $3.28 | $33.69 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0592-009 | $41.69 | $27.28 | $68.97 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUDE2014-009 | $25.78 | $0.58 | $26.36 |
| Drill Highway ENGI0542-006 | $43.76 | $30.77 | $74.53 |
| ELECTRICIAN Highway SUDE2022-003 | $65.86 | 0.00 | $65.86 |
| ELECTRICIAN Building ELEC0313-002 (Includes Low Voltage Wiring and Installation of Alarms, HVAC/Temperature Controls and Sound and Communication Systems) | $47.50 | $35.93 | $83.43 |
| ELECTRICIAN Heavy SUDE2014-009 | $34.96 | $23.87 | $58.83 |
| ELEVATOR MECHANIC Building ELEV0005-003 | $71.85 | $38.44 | $110.28 |
| FORM WORKER Highway SUDE2022-003 | $38.65 | $5.45 | $44.10 |
| GLAZIER Building PAIN0252-002 | $49.96 | $37.56 | $87.52 |
| IRONWORKER Building IRON0451-003 (Ornamental and Reinforcing) | $41.10 | $38.23 | $79.33 |
| IRONWORKER, REINFORCING Highway SUDE2022-003 | $49.64 | 0.00 | $49.64 |
| IRONWORKER, STRUCTURAL Building SUDE2014-006 | $43.59 | $7.41 | $51.00 |
| LABORER Highway LABO0199-001 (Asphalt, Includes Raker, Shoveler, Spreader and Distributor) | $31.15 | $16.50 | $47.65 |
| LABORER Backfiller and Tamper Heavy LABO0199-009 (Hand Held) | $31.45 | $25.70 | $57.15 |
| LABORER Backfiller, Jack Hammer, Mason Tender - Brick, Pipelayer, Scaffold Builder Building LABO0199-006 (Brick and Masonry), Tamper (Hand Held) | $29.45 | $25.70 | $55.15 |
| LABORER: Common or General Highway SUDE2022-003 | $34.94 | $5.91 | $40.85 |
| LABORER: Common or General Building SUDE2014-006 | $24.45 | $8.65 | $33.10 |
| LABORER: Common or General Heavy SUDE2014-009 | $16.42 | $4.06 | $20.48 |
| LABORER: Mason Tender - Cement/Concrete Highway SUDE2022-003 | $43.30 | $2.06 | $45.36 |
| LABORER: Pipelayer Heavy SUDE2014-009 | $18.63 | $2.68 | $21.31 |
| LINE CONSTRUCTION (Lineman) Heavy ELEC0126-003 | $65.10 | $11.50 | $76.60 |
| Mason Tender - Cement/Concrete Building LABO0199-006 | $31.45 | $25.70 | $57.15 |
| MILLWRIGHT Building CARP1906-003 | $51.54 | $39.26 | $90.80 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUDE2022-003 | $30.52 | $13.47 | $43.99 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUDE2014-006 | $36.08 | $12.02 | $48.10 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUDE2014-009 | $20.62 | $7.56 | $28.18 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUDE2022-003 | $34.34 | $14.93 | $49.27 |
| OPERATOR: OPERATOR: Bulldozer Highway SUDE2022-003 | $35.18 | $14.27 | $49.45 |
| OPERATOR: OPERATOR: Bulldozer Building SUDE2014-006 | $25.89 | 0.00 | $25.89 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUDE2014-009 | $26.46 | $7.56 | $34.02 |
| OPERATOR: OPERATOR: Crane Building SUDE2014-006 | $31.59 | $16.83 | $48.42 |
| OPERATOR: OPERATOR: Loader Highway SUDE2022-003 | $38.36 | $4.31 | $42.67 |
| OPERATOR: OPERATOR: Loader Heavy SUDE2014-009 | $25.55 | $7.56 | $33.11 |
| OPERATOR: OPERATOR: Mechanic Highway SUDE2022-003 | $28.11 | $11.18 | $39.29 |
| OPERATOR: OPERATOR: Milling Machine Highway SUDE2022-003 | $34.01 | $12.25 | $46.26 |
| OPERATOR: OPERATOR: Paver Highway SUDE2022-003 (Asphalt, Aggregate, and Concrete) | $35.07 | $17.17 | $52.24 |
| OPERATOR: PAINTER (Brush and Roller) Building SUDE2014-006 | $40.57 | $0.94 | $41.51 |
| OPERATOR: PLUMBER Building SUDE2014-006 | $45.40 | $16.23 | $61.63 |
| OPERATOR: ROOFER Building SUDE2014-006 (Installation of Metal Roofs Only) | $39.09 | $30.77 | $69.86 |
| OPERATOR: ROOFER, Excludes Installation of Metal Roofs Building SUDE2014-006 | $27.98 | $27.90 | $55.88 |
| OPERATOR: TILE FINISHER Building SUDE2014-006 | $35.40 | $4.31 | $39.71 |
| OPERATOR: TILE SETTER Building SUDE2014-006 | $57.98 | $1.11 | $59.09 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUDE2022-003 | $40.33 | 0.00 | $40.33 |
| OPERATOR: TRUCK DRIVER: Dump Truck Highway SUDE2022-003 | $28.07 | $7.38 | $35.45 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUDE2014-009 | $22.32 | $7.56 | $29.88 |
| PIPEFITTER Building PLUM0486-001 (Includes HVAC Pipe Installation and Excludes Industrial Work) | $42.62 | $22.77 | $65.39 |
| PIPEFITTER (INDUSTRIAL) Building PLUM0074-003 | $56.43 | $43.35 | $99.78 |
| PLASTERER (Fireproofer) Building PLAS0008-006 | $38.37 | $31.64 | $70.01 |
| Pounder Highway ENGI0542-006 | $43.76 | $30.77 | $74.53 |
| POWER EQUIPMENT OPERATOR Building ENGI0542-003 (Forklift) | $48.73 | $32.23 | $80.96 |
| POWER EQUIPMENT OPERATOR Heavy ENGI0542-009 (Crane, Forklift, and Scraper) | $48.73 | $32.23 | $80.96 |
| POWER EQUIPMENT OPERATOR Crane Highway ENGI0542-006 | $45.81 | $31.38 | $77.19 |
| Roller Highway ENGI0542-006 | $43.40 | $30.66 | $74.06 |
| SHEET METAL WORKER Building SHEE0019-021 (Includes HVAC Duct Installation) | $33.63 | $40.60 | $74.23 |
| SOFT FLOOR LAYER Building CARP0251-008 | $38.02 | $25.39 | $63.41 |
| SPRINKLER FITTER Building SFDE0669-002 (Fire Sprinklers) | $46.47 | $29.56 | $76.03 |
| Trencher Hand Guided Heavy LABO0199-009 | $29.45 | $25.70 | $55.15 |
No trade rates match your search and filter selection.
Highway
Building