GA20260007
rev 0Residential
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0026-001 | $34.21 | $23.92 | $58.13 |
| CARPENTER, Includes Form Work Building SUGA2012-004 | $19.75 | $1.95 | $21.70 |
| CARPENTER, Including Drywall Hanging Residential SUGA2008-063 | $10.00 | 0.00 | $10.00 |
| CEMENT MASON/CONCRETE FINISHER Residential SUGA2008-063 | $8.00 | 0.00 | $8.00 |
| CEMENT MASON/CONCRETE FINISHER Building SUGA2012-004 | $11.75 | 0.00 | $11.75 |
| ELECTRICIAN Residential SUGA2008-063 | $12.14 | 0.00 | $12.14 |
| ELECTRICIAN Building ELEC0508-004 (Including Alarm Installation and Low Voltage Wiring) | $33.35 | $13.40 | $46.75 |
| ELEVATOR MECHANIC Building SUGA2012-004 | $19.38 | $14.42 | $33.80 |
| GLAZIER Building SUGA2012-004 | $13.19 | 0.00 | $13.19 |
| IRONWORKER, REINFORCING Building SUGA2012-004 | $17.72 | 0.00 | $17.72 |
| IRONWORKER, STRUCTURAL Building SUGA2012-004 | $16.75 | 0.00 | $16.75 |
| LABORER: Common or General Residential SUGA2008-063 | $7.25 | 0.00 | $7.25 |
| LABORER: Common or General Building SUGA2012-004 | $12.06 | $0.44 | $12.50 |
| LABORER: Pipelayer Building SUGA2012-004 | $13.33 | 0.00 | $13.33 |
| OPERATOR: Backhoe/Excavator Residential SUGA2008-063 | $11.89 | 0.00 | $11.89 |
| OPERATOR: Backhoe/Excavator Building SUGA2012-004 | $15.00 | $0.75 | $15.75 |
| OPERATOR: Oiler Building SUGA2012-004 | $12.00 | 0.00 | $12.00 |
| PAINTER: Brush Only Residential SUGA2008-063 | $10.47 | 0.00 | $10.47 |
| PAINTER: Brush, Roller and Spray Building SUGA2012-004 | $16.00 | $1.62 | $17.62 |
| PIPEFITTER Building PLUM0177-006 (Including HVAC Unit and HVAC Electrical Temperature Control Installation; Excluding HVAC Pipe Installation) | $34.00 | $16.35 | $50.35 |
| PIPEFITTER Building SUGA2012-004 (HVAC Pipe Installation Only) | $16.38 | $4.56 | $20.94 |
| PLUMBER Residential SUGA2008-063 | $12.93 | 0.00 | $12.93 |
| PLUMBER, Excludes Installation of HVAC Pipe, HVAC Unit, and HVAC Electrical/Temperature Controls Building SUGA2012-004 | $18.55 | $3.35 | $21.90 |
| POWER EQUIPMENT OPERATOR: Crane (over 10 tons) Building ENGI0474-031 | $32.00 | $17.70 | $49.70 |
| POWER EQUIPMENT OPERATOR: Crane (over 120 tons) Building ENGI0474-031 | $33.00 | $17.70 | $50.70 |
| POWER EQUIPMENT OPERATOR: Crane (over 250 tons) Building ENGI0474-031 | $34.00 | $17.70 | $51.70 |
| ROOFER Building SUGA2012-004 | $13.62 | 0.00 | $13.62 |
| SHEET METAL WORKER Building SHEE0435-008 (Excluding HVAC Duct Installation) | $31.64 | $15.98 | $47.62 |
| SHEET METAL WORKER Building SUGA2012-004 (HVAC Duct Installation Only) | $15.09 | $3.53 | $18.62 |
| SHEET METAL WORKER, Includes HVAC Duct Installation Residential SUGA2008-063 | $9.31 | 0.00 | $9.31 |
| SPRINKLER FITTER Building SUGA2012-004 (Fire Sprinklers) | $19.25 | $2.54 | $21.79 |
No trade rates match your search and filter selection.
Residential
Building