Georgia

96 wage determinations · 159 counties · 1,482 trade rates

Track Georgia wage updates

Get an email when wage determinations covering Georgia are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Popular Trades In Georgia

Counties

Wage Determinations

GA20260001 rev 0

Fulton · Highway

Trade Rate Fringe Total
TRUCK DRIVER: LOWBOY TRUCK 26.18 3.73 29.91
TRUCK DRIVER: DUMP TRUCK 22.21 3.58 25.79
TRAFFIC CONTROL: FLAGGER 14.80 2.76 17.56
OPERATOR: SCREED 21.00 4.22 25.22
OPERATOR: ROLLER 19.93 3.14 23.07
OPERATOR: PAVER 25.58 4.21 29.79
OPERATOR: MILLING MACHINE 29.67 6.29 35.96
OPERATOR: LOADER 22.37 1.40 23.77
OPERATOR: GRADER/BLADE 27.95 4.42 32.37
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 24.68 2.59 27.27
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 25.54 4.50 30.04
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 20.99 0.00 20.99
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 17.23 2.23 19.46

GA20260002 rev 0

Hall · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.75 3.58 25.33
TRAFFIC CONTROL: FLAGGER 14.80 2.76 17.56
OPERATOR: ROLLER 18.64 3.99 22.63
OPERATOR: PAVER 23.62 4.10 27.72
OPERATOR: LOADER 22.37 1.40 23.77
OPERATOR: GRADER/BLADE 26.18 4.28 30.46
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 24.68 2.59 27.27
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.53 3.63 27.16
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 18.66 0.00 18.66
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.83 2.23 19.06
CEMENT MASON/CONCRETE FINISHER 29.99 0.00 29.99
CARPENTER 32.68 0.00 32.68

GA20260003 rev 0

Barrow, Bartow, Butts, Carroll, Cherokee, Clayton, Cobb, Coweta, Dawson, Dekalb, Douglas, Fayette, Forsyth, Greene, Gwinnett, Haralson, Heard, Henry, Jasper, Lamar, Meriwether, Morgan, Newton, Paulding, Pickens, Pike, Rockdale, Spalding, Walton · Highway

Trade Rate Fringe Total
TRUCK DRIVER: LOWBOY TRUCK 25.43 4.00 29.43
TRUCK DRIVER: DUMP TRUCK 22.21 3.58 25.79
TRAFFIC CONTROL: FLAGGER 14.80 2.76 17.56
OPERATOR: SCREED 21.00 4.22 25.22
OPERATOR: ROLLER 18.89 3.99 22.88
OPERATOR: PAVER 23.62 4.10 27.72
OPERATOR: MILLING MACHINE 29.67 6.29 35.96
OPERATOR: LOADER 22.37 1.40 23.77
OPERATOR: GRADER/BLADE 26.18 4.28 30.46
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 24.68 2.59 27.27
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.53 3.63 27.16
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 18.70 0.00 18.70
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 17.23 2.23 19.46

GA20260004 rev 0

Bibb, Crawford, Jones, Monroe, Twiggs · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 14.00 2.45 16.45
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260005 rev 0

Banks · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATIO… 10.07 0.00 10.07
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.88 0.00 7.88
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.66 0.00 10.66

GA20260006 rev 1

Ben Hill · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATIO… 9.31 0.00 9.31
PLUMBER 12.93 0.00 12.93
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
ELECTRICIAN 12.14 0.00 12.14
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, INCLUDING DRYWALL HANGING 11.95 0.00 11.95

GA20260007 rev 1

Camden · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATIO… 9.31 0.00 9.31
PLUMBER 12.93 0.00 12.93
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
ELECTRICIAN 12.14 0.00 12.14
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, INCLUDING DRYWALL HANGING 10.00 0.00 10.00

GA20260008 rev 1

Chattooga · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 9.73 0.00 9.73
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.75 0.00 7.75
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 10.51 0.00 10.51
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.40 0.00 10.40

GA20260009 rev 1

Colquitt · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATIO… 9.31 0.00 9.31
PLUMBER 12.93 0.00 12.93
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.47 0.00 7.47
ELECTRICIAN 12.14 0.00 12.14
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, INCLUDING DRYWALL HANGING 11.95 0.00 11.95

GA20260010 rev 1

Franklin · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 9.73 0.00 9.73
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 10.51 0.00 10.51
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.66 0.00 10.66

GA20260011 rev 1

Habersham · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 9.73 0.00 9.73
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 9.63 0.00 9.63
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 10.51 0.00 10.51
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.66 0.00 10.66

GA20260012 rev 1

Stephens · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 9.73 0.00 9.73
PLUMBER 15.00 0.00 15.00
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 9.00 0.00 9.00
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 10.51 0.00 10.51
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 12.60 0.00 12.60

GA20260013 rev 1

Thomas · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATIO… 9.31 0.00 9.31
PLUMBER 12.93 0.00 12.93
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.47 0.00 7.47
ELECTRICIAN 12.14 0.00 12.14
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, INCLUDING DRYWALL HANGING 11.95 0.00 11.95

GA20260014 rev 1

Tift · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATIO… 9.31 0.00 9.31
PLUMBER 12.93 0.00 12.93
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
ELECTRICIAN 12.14 0.00 12.14
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, INCLUDING DRYWALL HANGING 11.95 0.00 11.95

GA20260015 rev 1

Upson · Residential

Trade Rate Fringe Total
SHEET METAL WORKER 9.73 0.00 9.73
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 12.72 0.00 12.72
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.55 0.00 11.55
ELECTRICIAN 11.44 0.00 11.44
DRYWALL HANGER 8.78 0.00 8.78
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, EXCLUDES DRYWALL HANGING 9.25 0.00 9.25

GA20260016 rev 1

White · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 9.73 0.00 9.73
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.88 0.00 7.88
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 10.51 0.00 10.51
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.00 0.00 10.00

GA20260017 rev 1

Appling, Coffee · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATIO… 9.31 0.00 9.31
PLUMBER 12.93 0.00 12.93
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.47 0.00 7.47
ELECTRICIAN 12.14 0.00 12.14
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, INCLUDING DRYWALL HANGING 11.95 0.00 11.95

GA20260018 rev 1

Atkinson, Bacon, Berrien, Calhoun, Charlton, Clay, Clinch, Cook, Decatur, Early, Grady, Irwin, Jeff Davis, Miller, Mitchell, Pierce, Quitman, Randolph, Seminole, Telfair, Turner, Ware, Wayne · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATIO… 9.31 0.00 9.31
PLUMBER 12.93 0.00 12.93
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.47 0.00 7.47
ELECTRICIAN 12.14 0.00 12.14
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, INCLUDING DRYWALL HANGING 11.95 0.00 11.95

GA20260019 rev 1

Baldwin, Bleckley, Crisp, Dodge, Dooly, Laurens, Macon, Peach, Pulaski, Putnam, Schley, Stewart, Sumter, Talbot, Taylor, Troup, Webster, Wilcox, Wilkinson · Residential

Trade Rate Fringe Total
SHEET METAL WORKER 9.73 0.00 9.73
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 12.72 0.00 12.72
PAINTER: BRUSH ONLY 10.47 0.00 10.47
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.55 0.00 11.55
ELECTRICIAN 11.44 0.00 11.44
DRYWALL HANGER 8.78 0.00 8.78
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER, EXCLUDES DRYWALL HANGING 9.25 0.00 9.25

GA20260020 rev 1

Bulloch, Candler, Emanuel, Evans, Glascock, Jenkins, Johnson, Lincoln, Montgomery, Screven, Taliaferro, Tattnall, Toombs, Treutlen, Warren, Washington, Wheeler, Wilkes · Residential

Trade Rate Fringe Total
SHEET METAL WORKER 9.73 0.00 9.73
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.95 0.00 7.95
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.66 0.00 10.66

GA20260021 rev 1

Elbert, Fannin, Gilmer, Greene, Hart, Jackson, Morgan, Polk, Rabun, Towns, Union · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 9.73 0.00 9.73
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE/EXCAVATOR 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.88 0.00 7.88
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 10.51 0.00 10.51
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.66 0.00 10.66

GA20260022 rev 1

Gordon, Lumpkin · Residential

Trade Rate Fringe Total
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 9.73 0.00 9.73
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
OPERATOR: BACKHOE 11.89 0.00 11.89
LABORER: COMMON OR GENERAL 7.88 0.00 7.88
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 10.51 0.00 10.51
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.66 0.00 10.66

GA20260023 rev 1

Hancock, Jefferson · Residential

Trade Rate Fringe Total
SHEET METAL WORKER 9.73 0.00 9.73
PLUMBER 14.40 0.00 14.40
PAINTER: BRUSH ONLY 10.45 0.00 10.45
LABORER: COMMON OR GENERAL 7.95 0.00 7.95
ELECTRICIAN 11.42 0.00 11.42
CEMENT MASON/CONCRETE FINISHER 8.00 0.00 8.00
CARPENTER 10.66 0.00 10.66

GA20260024 rev 1

Baker · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 8.50 0.00 8.50
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.25 0.00 8.25
ELECTRICIAN 13.77 0.00 13.77
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 14.00 0.00 14.00
BRICKLAYER 13.83 0.00 13.83

GA20260025 rev 1

Barrow · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.19 0.00 10.19
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260026 rev 1

Bartow · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.19 0.00 10.19
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260027 rev 1

Bibb · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
SHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: 32.60 15.52 48.12
SHEET META: EXCLUDING HVAC DUCT INSTALLATION 25.49 11.73 37.22
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 8.63 0.00 8.63
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 11.06 0.00 11.06
ELECTRICIAN 13.77 0.00 13.77
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER, INCLUDING DRYWALL HANGING 10.00 0.00 10.00

GA20260028 rev 1

Bryan · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
TRUCK DRIVER 12.17 0.83 13.00
SHEET METAL WORKER 7.50 0.00 7.50
ROOFER 7.50 0.00 7.50
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.03 0.00 10.03
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.11 0.00 8.11
ELECTRICIAN 10.42 2.93 13.35
DRYWALL FINISHER/TAPER 12.25 0.00 12.25
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER, INCLUDING DRYWALL HANGING 11.27 0.00 11.27
BRICKLAYER 13.83 0.00 13.83

GA20260029 rev 1

Butts · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.25 0.00 8.25
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260030 rev 1

Catoosa · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
PAINTER: BRUSH, ROLLER AND SPRAY 25.85 12.74 38.59
SHEET METAL WORKER 23.96 8.93 32.89
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.00 0.00 10.00
ELECTRICIAN 14.51 3.82 18.33
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 13.11 1.89 15.00
BRICKLAYER 13.83 0.00 13.83

GA20260031 rev 1

Chatham · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
TRUCK DRIVER 12.17 0.83 13.00
SHEET METAL WORKER 7.50 0.00 7.50
ROOFER 7.50 0.00 7.50
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.03 0.00 10.03
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.11 0.00 8.11
ELECTRICIAN 10.42 2.93 13.35
DRYWALL FINISHER/TAPER 12.25 0.00 12.25
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER, INCLUDING DRYWALL HANGING 11.27 0.00 11.27
BRICKLAYER 13.83 0.00 13.83

GA20260032 rev 1

Clayton · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260033 rev 1

Cobb · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.00 0.00 8.00
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260034 rev 1

Crawford · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
SHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: 32.60 15.52 48.12
SHEET META: EXCLUDING HVAC DUCT INSTALLATION 25.49 11.73 37.22
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 8.63 0.00 8.63
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 11.06 0.00 11.06
ELECTRICIAN 13.77 0.00 13.77
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER, INCLUDING DRYWALL HANGING 10.00 0.00 10.00

GA20260035 rev 1

Dekalb · Residential

Trade Rate Fringe Total
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
OPERATING ENGINEERS: (COMPACTOR AND LOADER) 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 12.67 0.00 12.67
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.35 0.00 10.35
OPERATOR: BACKHOE/EXCAVATOR 13.69 0.00 13.69
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.73 0.00 10.73
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 10.63 0.00 10.63

GA20260036 rev 1

Effingham · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
TRUCK DRIVER 12.17 0.83 13.00
SHEET METAL WORKER 7.50 0.00 7.50
ROOFER 7.50 0.00 7.50
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.03 0.00 10.03
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.11 0.00 8.11
ELECTRICIAN 10.42 2.93 13.35
DRYWALL FINISHER/TAPER 12.25 0.00 12.25
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER, INCLUDING DRYWALL HANGING 11.27 0.00 11.27
BRICKLAYER 13.83 0.00 13.83

GA20260037 rev 1

Fayette · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.36 0.00 8.36
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260038 rev 1

Forsyth · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.19 0.00 10.19
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260039 rev 1

Fulton · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
CEMENT MASON/CONCRETE FINISHER 27.15 11.01 38.16
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 11.53 0.00 11.53
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.09 0.00 10.09
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66

GA20260040 rev 1

Hall · Residential

Trade Rate Fringe Total
ELECTRICIAN 38.65 12.75 51.40
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
PAINTER: BRUSH, ROLLER AND SPRAY 26.00 14.90 40.90
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 13.11 1.89 15.00
BRICKLAYER 13.83 0.00 13.83

GA20260041 rev 1

Houston · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 8.50 0.00 8.50
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
ELECTRICIAN 13.77 0.00 13.77
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 11.06 0.00 11.06
BRICKLAYER 13.83 0.00 13.83

GA20260042 rev 1

Lamar · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260043 rev 1

McIntosh · Residential

Trade Rate Fringe Total
CARPENTER 28.65 12.56 41.21
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
TRUCK DRIVER 12.17 0.83 13.00
SHEET METAL WORKER 7.50 0.00 7.50
ROOFER 7.50 0.00 7.50
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH ONLY 10.55 0.00 10.55
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.00 0.00 8.00
ELECTRICIAN 10.42 2.93 13.35
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
BRICKLAYER 13.83 0.00 13.83

GA20260044 rev 1

Rockdale · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.50 0.00 7.50
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.76 0.00 11.76

GA20260045 rev 1

Walton · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
OPERATING ENGINEER: BULLDOZER 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.19 0.00 10.19
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260046 rev 1

Brantley, Glynn, Liberty, Long · Residential

Trade Rate Fringe Total
CARPENTER 28.65 12.56 41.21
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
TRUCK DRIVER 12.17 0.83 13.00
SHEET METAL WORKER 7.50 0.00 7.50
ROOFER 7.50 0.00 7.50
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 10.52 0.00 10.52
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.00 0.00 8.00
ELECTRICIAN 10.42 2.93 13.35
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
BRICKLAYER 13.83 0.00 13.83

GA20260047 rev 1

Brooks, Echols, Lanier, Lowndes · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 8.50 0.00 8.50
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.30 0.52 8.82
ELECTRICIAN 13.77 0.00 13.77
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 11.06 0.00 11.06
BRICKLAYER 13.83 0.00 13.83

GA20260048 rev 1

Burke, Clarke, Columbia, Madison, McDuffie, Oconee, Oglethorpe, Richmond · Residential

Trade Rate Fringe Total
ELECTRICIAN 38.65 12.75 51.40
ELECTRICIAN 32.25 16.95 49.20
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
PAINTER: BRUSH, ROLLER AND SPRAY 26.00 14.90 40.90
PAINTER: BRUSH, ROLLER AND SPRAY 21.92 10.61 32.53
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.25 0.00 7.25

GA20260049 rev 1

Carroll, Cherokee, Coweta, Dawson, Douglas, Gwinnett, Haralson, Heard, Henry, Jasper, Meriwether, Newton, Paulding, Pickens, Pike, Spalding · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, BULLDOZER, COMPACTOR… 30.17 17.70 47.87
OPERATING ENGINEERS: BACKHOE, BULLDOZER, COMPACTOR… 28.32 13.45 41.77
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 25.49 11.73 37.22
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATI… 32.60 15.52 48.12
TRUCK DRIVER 12.13 0.00 12.13
TILE SETTER 11.07 0.00 11.07
ROOFER 11.50 0.00 11.50
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION 10.95 0.00 10.95
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL… 10.57 0.00 10.57
OPERATOR: EXCAVATOR 8.96 0.00 8.96
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.19 0.00 10.19
HVAC MECHANIC (HVAC PIPE INSTALLATION) 11.14 0.00 11.14
FORM WORKER 8.50 0.16 8.66
ELECTRICIAN, INCLUDES INSTALLATION OF ALARMS 11.57 0.00 11.57

GA20260050 rev 1

Chattahoochee, Harris, Marion, Muscogee · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 8.50 0.00 8.50
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.88 0.52 9.40
ELECTRICIAN 13.77 0.00 13.77
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 11.06 0.00 11.06

GA20260051 rev 1

Dade, Walker · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
PAINTER: BRUSH, ROLLER AND SPRAY 25.85 12.74 38.59
SHEET METAL WORKER 23.96 8.93 32.89
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.00 0.00 10.00
ELECTRICIAN 14.51 3.82 18.33
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 13.11 1.89 15.00
BRICKLAYER 13.83 0.00 13.83

GA20260052 rev 1

Dougherty, Lee, Terrell, Worth · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 8.50 0.00 8.50
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 8.25 0.00 8.25
ELECTRICIAN 13.77 0.00 13.77
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 14.00 0.00 14.00
BRICKLAYER 13.83 0.00 13.83

GA20260053 rev 1

Floyd, Murray, Whitfield · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
PAINTER: BRUSH, ROLLER AND SPRAY (FLOYD COUNTY) 26.00 14.90 40.90
PAINTER: BRUSH, ROLLER AND SPRAY 25.85 12.74 38.59
SHEET METAL WORKER 32.60 15.52 48.12
SHEET METAL WORKER 32.60 13.41 46.01
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 10.00 0.00 10.00
ELECTRICIAN 14.51 3.82 18.33
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54
CARPENTER 13.11 1.89 15.00

GA20260054 rev 1

Jones, Monroe, Twiggs · Residential

Trade Rate Fringe Total
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 30.17 17.70 47.87
OPERATING ENGINEERS: BACKHOE, COMPACTOR, AND LOADE… 28.32 13.45 41.77
SHEET METAL: EXCLUDING HVAC DUCT INSTALLATION: 32.60 15.52 48.12
SHEET META: EXCLUDING HVAC DUCT INSTALLATION 25.49 11.73 37.22
TRUCK DRIVER 12.17 0.83 13.00
ROOFER 9.47 0.00 9.47
PLUMBER 10.86 0.00 10.86
PAINTER: BRUSH, ROLLER AND SPRAY 8.63 0.00 8.63
OPERATOR: EXCAVATOR 8.96 0.00 8.96
OPERATOR: BULLDOZER 13.66 3.05 16.71
LABORER: MASON TENDER 8.00 0.00 8.00
LABORER: COMMON OR GENERAL 7.25 0.00 7.25
HVAC MECHANIC (INSTALLATION OF HVAC DUCT) 11.06 0.00 11.06
ELECTRICIAN 13.77 0.00 13.77
CEMENT MASON/CONCRETE FINISHER 13.02 3.52 16.54

GA20260055 rev 1

Crisp · Heavy

Trade Rate Fringe Total
ELECTRICIAN 29.50 14.88 44.38
TRUCK DRIVER: DUMP TRUCK 12.00 2.14 14.14
OPERATOR: LOADER 15.92 0.00 15.92
OPERATOR: GRADER/BLADE 18.88 1.32 20.20
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 20.60 0.00 20.60
LABORER: PIPELAYER 11.48 0.00 11.48
LABORER: COMMON OR GENERAL 11.00 0.00 11.00
CEMENT MASON/CONCRETE FINISHER 14.11 1.78 15.89
CARPENTER (FORM WORK ONLY) 15.21 0.00 15.21

GA20260056 rev 1

Early · Heavy

Trade Rate Fringe Total
ELECTRICIAN 29.50 14.88 44.38
TRUCK DRIVER: DUMP TRUCK 12.00 2.14 14.14
OPERATOR: LOADER 15.92 0.00 15.92
OPERATOR: GRADER/BLADE 18.88 1.32 20.20
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 17.23 0.00 17.23
LABORER: PIPELAYER 12.67 2.23 14.90
LABORER: COMMON OR GENERAL 10.60 1.83 12.43
CEMENT MASON/CONCRETE FINISHER 14.11 1.78 15.89
CARPENTER (FORM WORK ONLY) 15.21 0.00 15.21

GA20260057 rev 1

Putnam · Heavy

Trade Rate Fringe Total
ELECTRICIAN 32.00 14.71 46.71
TRUCK DRIVER: DUMP TRUCK 12.00 2.14 14.14
OPERATOR: LOADER 15.92 0.00 15.92
OPERATOR: GRADER/BLADE 18.88 1.32 20.20
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 18.86 1.76 20.62
LABORER: PIPELAYER 11.48 0.00 11.48
LABORER: COMMON OR GENERAL 11.69 2.07 13.76
CEMENT MASON/CONCRETE FINISHER 14.11 1.78 15.89
CARPENTER (FORM WORK ONLY) 15.21 0.00 15.21

GA20260058 rev 1

Rabun · Heavy

Trade Rate Fringe Total
OPERATOR: LOADER 21.77 0.00 21.77
OPERATOR: GRADER/BLADE 25.82 1.81 27.63
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 24.89 0.00 24.89
LABORER: PIPELAYER 16.08 0.00 16.08
LABORER: COMMON OR GENERAL 15.19 0.00 15.19
ELECTRICIAN 28.40 0.52 28.92
CEMENT MASON/CONCRETE FINISHER 19.30 2.43 21.73
CARPENTER (FORM WORK ONLY) 20.51 0.01 20.52

GA20260059 rev 1

Union · Heavy

Trade Rate Fringe Total
OPERATOR: LOADER 21.77 0.00 21.77
OPERATOR: GRADER/BLADE 25.82 1.81 27.63
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 24.89 0.00 24.89
LABORER: PIPELAYER 16.08 0.00 16.08
LABORER: COMMON OR GENERAL 15.19 0.00 15.19
ELECTRICIAN 28.40 0.52 28.92
CEMENT MASON/CONCRETE FINISHER 19.30 2.43 21.73
CARPENTER (FORM WORK ONLY) 20.51 0.01 20.52

GA20260060 rev 2

Appling, Atkinson, Bacon, Ben Hill, Berrien, Calhoun, Camden, Charlton, Clay, Clinch, Coffee, Colquitt, Cook, Decatur, Grady, Irwin, Jeff Davis, Miller, Mitchell, Pierce, Quitman, Randolph, Seminole, Telfair, Thomas, Tift, Turner, Ware, Wayne · Heavy

Trade Rate Fringe Total
ELECTRICIAN 35.60 14.97 50.57
ELECTRICIAN 33.35 13.40 46.75
ELECTRICIAN (CLAY & QUITMAN COUNTIES) 38.65 12.75 51.40
ELECTRICIAN 33.50 13.86 47.36
ELECTRICIAN (JEFF DAVIS & TELFAIR COUNTIES) 32.00 14.71 46.71
ELECTRICIAN 29.50 14.88 44.38
TRUCK DRIVER: DUMP TRUCK 12.00 2.14 14.14
OPERATOR: LOADER 15.92 0.00 15.92
OPERATOR: GRADER/BLADE 18.88 1.32 20.20
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 17.23 0.00 17.23
LABORER: PIPELAYER 12.00 0.00 12.00
LABORER: COMMON OR GENERAL 11.00 0.00 11.00
CEMENT MASON/CONCRETE FINISHER 14.11 1.78 15.89
CARPENTER (FORM WORK ONLY) 15.21 0.00 15.21

GA20260061 rev 1

Baldwin, Bleckley, Dodge, Dooly, Laurens, Macon, Schley, Stewart, Sumter, Talbot, Taylor, Troup, Upson, Webster, Wilcox, Wilkinson · Heavy

Trade Rate Fringe Total
ELECTRICIAN 38.65 12.75 51.40
ELECTRICIAN 32.00 14.71 46.71
ELECTRICIAN (DOOLY, SUMTER, & WILCOX COUNTIES) 29.50 14.88 44.38
TRUCK DRIVER: DUMP TRUCK 12.00 2.14 14.14
OPERATOR: LOADER 15.92 0.00 15.92
OPERATOR: GRADER/BLADE 18.88 1.32 20.20
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 18.86 1.76 20.62
LABORER: PIPELAYER 11.48 0.00 11.48
LABORER: COMMON OR GENERAL 10.69 0.00 10.69
CEMENT MASON/CONCRETE FINISHER 14.11 1.78 15.89
CARPENTER (FORM WORK ONLY) 15.21 0.00 15.21

GA20260062 rev 1

Banks, Habersham · Heavy

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 16.41 2.93 19.34
OPERATOR: LOADER 21.77 0.00 21.77
OPERATOR: GRADER/BLADE 25.82 1.81 27.63
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 24.89 0.00 24.89
LABORER: PIPELAYER 16.08 0.00 16.08
LABORER: COMMON OR GENERAL 16.07 0.00 16.07
ELECTRICIAN 28.40 0.52 28.92
CEMENT MASON/CONCRETE FINISHER 19.30 2.43 21.73
CARPENTER (FORM WORK ONLY) 20.51 0.01 20.52

GA20260063 rev 1

Bulloch, Candler, Emanuel, Evans, Glascock, Hancock, Jefferson, Jenkins, Johnson, Montgomery, Screven, Taliaferro, Tattnall, Toombs, Treutlen, Warren, Washington, Wheeler, Wilkes · Heavy

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 16.41 2.93 19.34
OPERATOR: LOADER 21.77 0.00 21.77
OPERATOR: GRADER/BLADE 25.82 1.81 27.63
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 24.89 0.00 24.89
LABORER: PIPELAYER 16.08 0.00 16.08
LABORER: COMMON OR GENERAL 15.04 0.00 15.04
ELECTRICIAN 28.40 0.52 28.92
CEMENT MASON/CONCRETE FINISHER 19.30 2.43 21.73
CARPENTER (FORM WORK ONLY) 20.51 0.01 20.52

GA20260064 rev 1

Chattooga, Elbert, Fannin, Franklin, Gilmer, Gordon, Greene, Hart, Jackson, Lumpkin, Polk, Stephens, Towns, White · Heavy

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 16.41 2.93 19.34
OPERATOR: LOADER 21.77 0.00 21.77
OPERATOR: GRADER/BLADE 25.82 1.81 27.63
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 24.89 0.00 24.89
LABORER: PIPELAYER 16.08 0.00 16.08
LABORER: COMMON OR GENERAL 15.19 0.00 15.19
ELECTRICIAN 28.40 0.52 28.92
CEMENT MASON/CONCRETE FINISHER 19.30 2.43 21.73
CARPENTER (FORM WORK ONLY) 20.51 0.01 20.52

GA20260065 rev 1

Brantley, Bryan, Chatham, Effingham, Glynn, Liberty, Long, McIntosh · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 18.46 0.00 18.46
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260066 rev 1

Brooks, Dougherty, Echols, Lanier, Lee, Lowndes, Terrell, Worth · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 16.41 0.00 16.41
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260067 rev 1

Burke, Columbia, Lincoln, McDuffie, Richmond · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 15.50 0.00 15.50
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260068 rev 1

Catoosa, Dade, Floyd, Walker · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 20.96 0.00 20.96
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260069 rev 1

Chattahoochee, Harris, Marion, Muscogee, Stewart, Talbot · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 16.41 0.00 16.41
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260070 rev 1

Clarke, Madison, Oconee, Oglethorpe · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 15.50 0.00 15.50
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260071 rev 1

Houston, Peach · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 16.41 0.00 16.41
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260072 rev 1

Murray, Whitfield · Highway

Trade Rate Fringe Total
TRUCK DRIVER: DUMP TRUCK 21.58 3.58 25.16
TRAFFIC CONTROL: FLAGGER 14.64 0.00 14.64
OPERATOR: ROLLER 18.51 3.99 22.50
OPERATOR: PAVER 23.22 4.10 27.32
OPERATOR: LOADER 22.81 1.91 24.72
OPERATOR: GRADER/BLADE 26.31 5.43 31.74
OPERATOR: CRANE 39.31 0.00 39.31
OPERATOR: BULLDOZER 22.82 0.00 22.82
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE 23.40 3.73 27.13
LABORER: PIPELAYER 22.42 0.00 22.42
LABORER: COMMON OR GENERAL 20.96 0.00 20.96
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREAD… 16.72 2.23 18.95
CEMENT MASON/CONCRETE FINISHER 28.44 0.00 28.44
CARPENTER 32.68 0.00 32.68

GA20260084 rev 0

Baldwin · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 32.00 12.95 44.95
ELEVATOR MECHANIC 52.08 38.44 90.52
OPERATOR: Crane 38.53 16.08 54.61
PAINTER: Brush, Roller, Spray 26.00 14.90 40.90
PIPEFITTER 41.18 17.01 58.19
PLUMBER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Excludes Drywall Hanging, and Metal Stu… 13.30 0.83 14.13
CEMENT MASON/CONCRETE FINISHER 12.45 0.54 12.99
DRYWALL HANGER, Includes Metal Stud Installation 12.00 0.00 12.00
ELECTRICIAN, Excludes Low Voltage Wiring 19.49 6.21 25.70
GLAZIER 14.93 1.11 16.04
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75

GA20260085 rev 0

Ben Hill · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 29.50 13.70 43.20
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Includes Form Work 15.97 1.95 17.92
CEMENT MASON/CONCRETE FINISHER 11.75 0.00 11.75
ELEVATOR MECHANIC 19.38 14.42 33.80
GLAZIER 13.19 0.00 13.19
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 9.55 0.00 9.55
LABORER: Pipelayer 13.33 0.00 13.33

GA20260086 rev 0

Bleckley · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 32.00 12.95 44.95
ELEVATOR MECHANIC 52.08 38.44 90.52
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PAINTER: Brush, Roller, Spray 26.00 14.90 40.90
PIPEFITTER 41.18 17.01 58.19
PLUMBER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Excludes Drywall Hanging, and Metal Stu… 18.00 0.00 18.00
CEMENT MASON/CONCRETE FINISHER 12.45 0.54 12.99
DRYWALL HANGER, Includes Metal Stud Installation 12.00 0.00 12.00
GLAZIER 14.93 1.11 16.04
IRONWORKER, REINFORCING 17.72 0.00 17.72

GA20260087 rev 1

Camden · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 33.35 13.40 46.75
POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) 34.00 17.70 51.70
POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) 32.00 17.70 49.70
PIPEFITTER 34.00 16.35 50.35
SPRINKLER FITTER (FIRE SPRINKLERS) 19.25 2.54 21.79
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 15.09 3.53 18.62
ROOFER 13.62 0.00 13.62
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC … 18.55 3.35 21.90
PIPEFITTER (HVAC PIPE INSTALLATION ONLY) 16.38 4.56 20.94
PAINTER: BRUSH, ROLLER AND SPRAY 16.00 1.62 17.62
OPERATOR: OILER 12.00 0.00 12.00
OPERATOR: BACKHOE/EXCAVATOR 15.00 0.75 15.75
LABORER: PIPELAYER 13.33 0.00 13.33

GA20260088 rev 0

Charlton · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 35.60 14.97 50.57
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PIPEFITTER 34.00 16.35 50.35
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Includes Form Work 15.97 1.95 17.92
CEMENT MASON/CONCRETE FINISHER 11.75 0.00 11.75
ELEVATOR MECHANIC 19.38 14.42 33.80
GLAZIER 13.19 0.00 13.19
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 9.00 0.00 9.00
LABORER: Pipelayer 13.33 0.00 13.33

GA20260089 rev 0

Decatur · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 33.50 12.85 46.35
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Includes Form Work 15.97 1.95 17.92
CEMENT MASON/CONCRETE FINISHER 11.75 0.00 11.75
ELEVATOR MECHANIC 19.38 14.42 33.80
GLAZIER 14.21 0.00 14.21
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 8.00 0.00 8.00
LABORER: Pipelayer 13.33 0.00 13.33

GA20260090 rev 0

Early · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 29.50 13.70 43.20
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Includes Form Work 15.97 1.95 17.92
CEMENT MASON/CONCRETE FINISHER 11.75 0.00 11.75
ELEVATOR MECHANIC 19.38 14.42 33.80
GLAZIER 13.19 0.00 13.19
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 8.96 0.00 8.96
LABORER: Pipelayer 13.33 0.00 13.33

GA20260091 rev 1

Gordon · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
OPERATOR: CRANE 38.53 16.08 54.61
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 15.77 0.00 15.77
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 24.89 9.09 33.98
ROOFER 13.62 0.00 13.62
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC … 17.54 1.27 18.81
PAINTER: BRUSH, ROLLER AND SPRAY 14.50 0.00 14.50
OPERATOR: OILER 12.00 0.00 12.00
OPERATOR: BACKHOE/EXCAVATOR 14.00 0.00 14.00
LABORER: PIPELAYER 15.50 0.00 15.50
LABORER: COMMON OR GENERAL 10.53 0.00 10.53
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
IRONWORKER, REINFORCING 17.72 0.00 17.72
ELECTRICIAN 23.34 3.70 27.04

GA20260092 rev 1

Habersham · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
OPERATOR: CRANE 38.53 16.08 54.61
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 15.77 0.00 15.77
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 24.89 9.09 33.98
ROOFER 13.62 0.00 13.62
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC … 17.54 1.27 18.81
PAINTER: BRUSH, ROLLER AND SPRAY 14.77 0.27 15.04
OPERATOR: OILER 12.00 0.00 12.00
OPERATOR: BACKHOE/EXCAVATOR 14.00 0.00 14.00
LABORER: PIPELAYER 15.50 0.00 15.50
LABORER: COMMON OR GENERAL 10.92 0.00 10.92
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
IRONWORKER, REINFORCING 17.72 0.00 17.72
ELECTRICIAN 23.34 3.70 27.04

GA20260093 rev 1

Jackson · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
OPERATOR: CRANE 38.53 16.08 54.61
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 15.77 0.00 15.77
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 24.89 9.09 33.98
ROOFER 13.62 0.00 13.62
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC … 17.54 1.27 18.81
PAINTER: BRUSH, ROLLER AND SPRAY 14.77 0.27 15.04
OPERATOR: OILER 12.00 0.00 12.00
OPERATOR: BACKHOE/EXCAVATOR 14.00 0.00 14.00
LABORER: PIPELAYER 15.50 0.00 15.50
LABORER: COMMON OR GENERAL 10.80 0.00 10.80
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
IRONWORKER, REINFORCING 17.72 0.00 17.72
ELECTRICIAN 23.34 3.70 27.04

GA20260094 rev 1

Jefferson · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 32.25 16.95 49.20
POWER EQUIPMENT OPERATOR: CRANE (OVER 250 TONS) 34.00 17.70 51.70
POWER EQUIPMENT OPERATOR: CRANE (OVER 120 TONS) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: CRANE (OVER 10 TONS) 32.00 17.70 49.70
PLUMBER 41.18 17.01 58.19
PIPEFITTER 35.45 17.55 53.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 15.77 0.00 15.77
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.33 5.47 24.80
ROOFER 13.62 0.00 13.62
PAINTER: BRUSH, ROLLER AND SPRAY 14.77 0.27 15.04
OPERATOR: OILER 12.00 0.00 12.00
OPERATOR: BACKHOE/EXCAVATOR 14.00 0.00 14.00
LABORER: PIPELAYER 15.50 0.00 15.50
LABORER: COMMON OR GENERAL 10.94 0.47 11.41

GA20260095 rev 0

Laurens · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 32.00 12.95 44.95
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PAINTER: Brush, Roller, Spray 26.00 14.90 40.90
PIPEFITTER 41.18 17.01 58.19
PLUMBER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Excludes Drywall Hanging, and Metal Stu… 18.00 0.00 18.00
CEMENT MASON/CONCRETE FINISHER 12.00 0.00 12.00
DRYWALL HANGER, Includes Metal Stud Installation 12.00 0.00 12.00
ELEVATOR MECHANIC 20.04 5.63 25.67
GLAZIER 14.93 1.11 16.04
IRONWORKER, REINFORCING 17.72 0.00 17.72

GA20260097 rev 1

Polk · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
OPERATOR: CRANE 38.53 16.08 54.61
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 15.77 0.00 15.77
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 24.89 9.09 33.98
ROOFER 13.62 0.00 13.62
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC … 17.54 1.27 18.81
PAINTER: BRUSH, ROLLER AND SPRAY 14.00 0.27 14.27
OPERATOR: OILER 12.00 0.00 12.00
OPERATOR: BACKHOE/EXCAVATOR 14.00 0.00 14.00
LABORER: PIPELAYER 15.50 0.00 15.50
LABORER: COMMON OR GENERAL 10.00 0.19 10.19
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
IRONWORKER, REINFORCING 17.72 0.00 17.72
ELECTRICIAN 23.34 3.70 27.04

GA20260098 rev 0

Putnam · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 32.00 12.95 44.95
ELEVATOR MECHANIC 52.08 38.44 90.52
OPERATOR: Crane 38.53 16.08 54.61
PAINTER: Brush, Roller, Spray 26.00 14.90 40.90
PIPEFITTER 41.18 17.01 58.19
PLUMBER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Excludes Drywall Hanging, and Metal Stu… 18.00 0.00 18.00
CEMENT MASON/CONCRETE FINISHER 12.45 0.54 12.99
DRYWALL HANGER, Includes Metal Stud Installation 12.00 0.00 12.00
ELECTRICIAN, Excludes Low Voltage Wiring 18.42 2.62 21.04
GLAZIER 14.93 1.11 16.04
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75

GA20260099 rev 0

Quitman · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 38.65 33.00 71.65
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PIPEFITTER 30.00 16.66 46.66
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Includes Form Work 15.97 1.95 17.92
CEMENT MASON/CONCRETE FINISHER 11.75 0.00 11.75
ELEVATOR MECHANIC 19.38 14.42 33.80
GLAZIER 13.19 0.00 13.19
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 9.00 0.21 9.21
LABORER: Pipelayer 13.33 0.00 13.33

GA20260100 rev 0

Talbot · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 38.65 33.00 71.65
ELEVATOR MECHANIC 52.08 38.44 90.52
OPERATOR: Crane 38.53 16.08 54.61
PAINTER: Brush, Roller, Spray 26.00 14.90 40.90
PIPEFITTER 30.00 16.66 46.66
PLUMBER 30.00 16.66 46.66
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Excludes Drywall Hanging, and Metal Stu… 18.00 0.00 18.00
CEMENT MASON/CONCRETE FINISHER 12.45 0.54 12.99
DRYWALL HANGER, Includes Metal Stud Installation 12.00 0.00 12.00
GLAZIER 14.93 1.11 16.04
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 10.51 0.59 11.10

GA20260101 rev 0

Telfair · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 32.00 12.95 44.95
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Includes Form Work 15.97 1.95 17.92
CEMENT MASON/CONCRETE FINISHER 11.75 0.00 11.75
ELEVATOR MECHANIC 19.38 14.42 33.80
GLAZIER 13.19 0.00 13.19
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 9.55 0.00 9.55
LABORER: Pipelayer 13.33 0.00 13.33

GA20260102 rev 0

Tift · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 29.50 13.70 43.20
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Includes Form Work 15.97 1.95 17.92
CEMENT MASON/CONCRETE FINISHER 11.75 0.00 11.75
ELEVATOR MECHANIC 19.38 14.42 33.80
GLAZIER 13.19 0.00 13.19
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 9.55 0.00 9.55
LABORER: Pipelayer 13.33 0.00 13.33

GA20260103 rev 0

Troup · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 38.65 33.00 71.65
ELEVATOR MECHANIC 52.08 38.44 90.52
OPERATOR: Crane 38.53 16.08 54.61
PAINTER: Brush, Roller, Spray 26.00 14.90 40.90
PIPEFITTER 41.18 17.01 58.19
PLUMBER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Excludes Drywall Hanging, and Metal Stu… 18.00 0.00 18.00
CEMENT MASON/CONCRETE FINISHER 12.45 0.54 12.99
DRYWALL HANGER, Includes Metal Stud Installation 12.00 0.00 12.00
GLAZIER 14.93 1.11 16.04
IRONWORKER, REINFORCING 17.72 0.00 17.72
IRONWORKER, STRUCTURAL 16.75 0.00 16.75
LABORER: Common or General 9.33 1.54 10.87

GA20260104 rev 1

Banks, Chattooga, Elbert, Greene, Hart, Lumpkin, Rabun, Stephens, Towns · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELEVATOR MECHANIC 52.08 38.44 90.52
ELEVATOR MECHANIC 52.81 38.44 91.25
ELEVATOR MECHANIC 51.11 38.44 89.55
OPERATOR: CRANE 38.53 16.08 54.61
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 15.77 0.00 15.77
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 24.89 9.09 33.98
ROOFER 13.62 0.00 13.62
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC … 17.54 1.27 18.81
PAINTER: BRUSH, ROLLER AND SPRAY 14.77 0.27 15.04
OPERATOR: OILER 12.00 0.00 12.00
OPERATOR: BACKHOE/EXCAVATOR 14.00 0.00 14.00
LABORER: PIPELAYER 15.50 0.00 15.50
LABORER: COMMON OR GENERAL 11.46 0.00 11.46

GA20260105 rev 1

Bulloch, Candler, Emanuel, Evans, Glascock, Hancock, Jenkins, Johnson, Montgomery, Screven, Taliaferro, Tattnall, Toombs, Treutlen, Warren, Washington, Wheeler, Wilkes · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 33.35 13.40 46.75
ELECTRICIAN 32.00 14.71 46.71
ELECTRICIAN 32.25 16.95 49.20
POWER EQUIPMENT OPERATOR: CRANE 34.00 17.70 51.70
POWER EQUIPMENT OPERATOR: CRANE 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: CRANE 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: CRANE 38.53 16.08 54.61
PLUMBER 41.18 17.01 58.19
PIPEFITTER 35.45 17.55 53.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 15.77 0.00 15.77
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 19.33 5.47 24.80
ROOFER 13.62 0.00 13.62
PAINTER: BRUSH, ROLLER AND SPRAY 14.77 0.27 15.04
OPERATOR: OILER 12.00 0.00 12.00

GA20260106 rev 0

Crisp, Dodge, Dooly, Macon, Schley, Stewart, Sumter, Taylor, Upson, Webster, Wilcox, Wilkinson · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 38.65 33.00 71.65
ELECTRICIAN 32.00 12.95 44.95
ELECTRICIAN 29.50 13.70 43.20
ELEVATOR MECHANIC 52.08 38.44 90.52
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
OPERATOR: Crane 38.53 16.08 54.61
PAINTER: Brush, Roller, Spray 26.00 14.90 40.90
PIPEFITTER 30.00 16.66 46.66
PLUMBER 30.00 16.66 46.66
PIPEFITTER 38.98 17.01 55.99
PLUMBER 38.98 17.01 55.99
SHEET METAL WORKER 37.75 17.95 55.70

GA20260107 rev 1

Fannin, Franklin, Gilmer, Union, White · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELEVATOR MECHANIC 52.08 38.44 90.52
ELEVATOR MECHANIC 52.81 38.44 91.25
OPERATOR: CRANE 38.53 16.08 54.61
PIPEFITTER 38.98 17.01 55.99
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATIO… 15.77 0.00 15.77
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) 24.89 9.09 33.98
ROOFER 13.62 0.00 13.62
PLUMBER, EXCLUDES INSTALLATION OF HVAC PIPE, HVAC … 17.54 1.27 18.81
PAINTER: BRUSH, ROLLER AND SPRAY 14.77 0.27 15.04
OPERATOR: OILER 12.00 0.00 12.00
OPERATOR: BACKHOE/EXCAVATOR 14.00 0.00 14.00
LABORER: PIPELAYER 15.50 0.00 15.50
LABORER: COMMON OR GENERAL 11.46 0.00 11.46
IRONWORKER, STRUCTURAL 16.75 0.00 16.75

GA20260108 rev 0

Turner, Ware, Wayne · Building

Trade Rate Fringe Total
BOILERMAKER 34.21 23.92 58.13
ELECTRICIAN 33.35 13.40 46.75
ELECTRICIAN 29.50 13.70 43.20
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) 32.00 17.70 49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) 33.00 17.70 50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) 34.00 17.70 51.70
PIPEFITTER 38.98 17.01 55.99
PIPEFITTER 34.00 16.35 50.35
SHEET METAL WORKER 37.75 17.95 55.70
SHEET METAL WORKER 37.75 17.95 55.70
CARPENTER, Includes Form Work 15.97 1.95 17.92
CEMENT MASON/CONCRETE FINISHER 11.75 0.00 11.75
ELEVATOR MECHANIC 19.38 14.42 33.80
GLAZIER 13.19 0.00 13.19
IRONWORKER, REINFORCING 17.72 0.00 17.72