Putnam

3 wage determinations 41 trade rates

Popular Trades In Putnam

Track Putnam County updates

Get an email when wage determinations covering Putnam County, Georgia are modified.

Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.

Trade Rates

Click a row to save its rate for later, then export your selections from the Saved panel.

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Save Trade & Classification Rate Fringe Total
BOILERMAKER Building
BOIL0026-001
$34.21 $23.92 $58.13
CARPENTER (FORM WORK ONLY) Heavy
SUGA2012-087
$15.21 0.00 $15.21
CARPENTER, EXCLUDES DRYWALL HANGING Residential
SUGA2008-075
$9.25 0.00 $9.25
CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation Building
SUGA2012-016
$18.00 0.00 $18.00
CEMENT MASON/CONCRETE FINISHER Residential
SUGA2008-075
$8.00 0.00 $8.00
CEMENT MASON/CONCRETE FINISHER Heavy
SUGA2012-087
$14.11 $1.78 $15.89
CEMENT MASON/CONCRETE FINISHER Building
SUGA2012-016
$12.45 $0.54 $12.99
DRYWALL HANGER Residential
SUGA2008-075
$8.78 0.00 $8.78
DRYWALL HANGER, Includes Metal Stud Installation Building
SUGA2012-016
$12.00 0.00 $12.00
ELECTRICIAN Residential
SUGA2008-075
$11.44 0.00 $11.44
ELECTRICIAN Heavy
ELEC1316-002
$32.00 $14.71 $46.71
ELECTRICIAN Building
ELEC1316-019 (Low Voltage Wiring Only)
$32.00 $12.95 $44.95
ELECTRICIAN, Excludes Low Voltage Wiring Building
SUGA2012-016
$18.42 $2.62 $21.04
ELEVATOR MECHANIC Building
ELEV0032-001
$52.08 $38.44 $90.52
GLAZIER Building
SUGA2012-016
$14.93 $1.11 $16.04
HVAC MECHANIC (HVAC PIPE INSTALLATION) Residential
SUGA2008-075
$11.55 0.00 $11.55
IRONWORKER, REINFORCING Building
SUGA2012-016
$17.72 0.00 $17.72
IRONWORKER, STRUCTURAL Building
SUGA2012-016
$16.75 0.00 $16.75
LABORER: Common or General Building
SUGA2012-016
$10.51 $0.59 $11.10
LABORER: COMMON OR GENERAL Residential
SUGA2008-075
$7.25 0.00 $7.25
LABORER: COMMON OR GENERAL Heavy
SUGA2012-087
$11.69 $2.07 $13.76
LABORER: Pipelayer Building
SUGA2012-016
$13.33 0.00 $13.33
LABORER: PIPELAYER Heavy
SUGA2012-087
$11.48 0.00 $11.48
OPERATOR: Backhoe/Excavator Building
SUGA2012-016
$15.50 $0.65 $16.15
OPERATOR: BACKHOE/EXCAVATOR Residential
SUGA2008-075
$11.89 0.00 $11.89
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Heavy
SUGA2012-087
$18.86 $1.76 $20.62
OPERATOR: Crane Building
ENGI0926-034
$38.53 $16.08 $54.61
OPERATOR: GRADER/BLADE Heavy
SUGA2012-087
$18.88 $1.32 $20.20
OPERATOR: LOADER Heavy
SUGA2012-087
$15.92 0.00 $15.92
OPERATOR: Oiler Building
SUGA2012-016
$12.00 0.00 $12.00
PAINTER: BRUSH ONLY Residential
SUGA2008-075
$10.47 0.00 $10.47
PAINTER: Brush, Roller, Spray Building
PAIN0193-001
$26.00 $14.90 $40.90
PIPEFITTER Building
PLUM0072-022 (Including HVAC Pipe and HVAC Unit Installation)
$41.18 $17.01 $58.19
PLUMBER Building
PLUM0072-023
$38.98 $17.01 $55.99
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION Residential
SUGA2008-075
$12.72 0.00 $12.72
ROOFER Building
SUGA2012-016
$13.62 0.00 $13.62
SHEET METAL WORKER Residential
SUGA2008-075
$9.73 0.00 $9.73
SHEET METAL WORKER Building
SHEE0085-012 (HVAC Duct Installation Only)
$37.75 $17.95 $55.70
SHEET METAL WORKER, Excludes HVAC Duct Installation Building
SUGA2012-016
$18.91 0.00 $18.91
SPRINKLER FITTER Building
SUGA2012-016 (Fire Sprinklers)
$18.81 $1.44 $20.25
TRUCK DRIVER: DUMP TRUCK Heavy
SUGA2012-087
$12.00 $2.14 $14.14

Wage Determinations

Residential

10 trades

Applies to

Baldwin, Bleckley, Crisp, Dodge, Dooly, Laurens, Macon, Peach, Pulaski, Putnam +9 more