Stewart

4 wage determinations 63 trade rates

Popular Trades In Stewart

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BOILERMAKER Building
BOIL0026-001
$34.21 $23.92 $58.13
CARPENTER Highway
SUGA2022-009
$32.68 0.00 $32.68
CARPENTER (Form Work Only) Heavy
SUGA2012-091
$15.21 0.00 $15.21
CARPENTER, Excludes Drywall Hanging Residential
SUGA2008-075
$9.25 0.00 $9.25
CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation Building
SUGA2012-025
$18.00 0.00 $18.00
CEMENT MASON/CONCRETE FINISHER Residential
SUGA2008-075
$8.00 0.00 $8.00
CEMENT MASON/CONCRETE FINISHER Heavy
SUGA2012-091
$14.11 $1.78 $15.89
CEMENT MASON/CONCRETE FINISHER Highway
SUGA2022-009
$28.44 0.00 $28.44
CEMENT MASON/CONCRETE FINISHER Building
SUGA2012-025
$12.45 $0.54 $12.99
DRYWALL HANGER Residential
SUGA2008-075
$8.78 0.00 $8.78
DRYWALL HANGER, Includes Metal Stud Installation Building
SUGA2012-025
$12.00 0.00 $12.00
ELECTRICIAN Residential
SUGA2008-075
$11.44 0.00 $11.44
ELECTRICIAN Heavy
ELEC0613-020 Scope differs by code/WD
$38.65 $33.00 $71.65
ELECTRICIAN Heavy
ELEC1316-016 Scope differs by code/WD
$32.00 $12.95 $44.95
ELECTRICIAN Heavy
ELEC1531-009 Scope differs by code/WD
$29.50 $13.70 $43.20
ELECTRICIAN Building
ELEC0613-007 (Including Low Voltage Wiring)
$38.65 $33.00 $71.65
ELECTRICIAN Building
ELEC1316-023 (Including Low Voltage Wiring)
$32.00 $12.95 $44.95
ELECTRICIAN Building
ELEC1531-012 (Including Low Voltage Wiring)
$29.50 $13.70 $43.20
ELEVATOR MECHANIC Building
ELEV0032-001
$52.08 $38.44 $90.52
GLAZIER Building
SUGA2012-025
$14.93 $1.11 $16.04
HVAC MECHANIC Residential
SUGA2008-075 (HVAC Pipe Installation)
$11.55 0.00 $11.55
IRONWORKER, REINFORCING Building
SUGA2012-025
$17.72 0.00 $17.72
IRONWORKER, STRUCTURAL Building
SUGA2012-025
$16.75 0.00 $16.75
LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway
SUGA2022-009
$16.72 $2.23 $18.95
LABORER: Common or General Residential
SUGA2008-075
$7.25 0.00 $7.25
LABORER: Common or General Heavy
SUGA2012-091
$10.69 0.00 $10.69
LABORER: Common or General Highway
SUGA2022-009
$16.41 0.00 $16.41
LABORER: Common or General Building
SUGA2012-025
$10.51 $0.59 $11.10
LABORER: Pipelayer Heavy
SUGA2012-091
$11.48 0.00 $11.48
LABORER: Pipelayer Highway
SUGA2022-009
$22.42 0.00 $22.42
LABORER: Pipelayer Building
SUGA2012-025
$13.33 0.00 $13.33
OPERATOR: Backhoe/Excavator Residential
SUGA2008-075
$11.89 0.00 $11.89
OPERATOR: Backhoe/Excavator Building
SUGA2012-025
$15.50 $0.65 $16.15
OPERATOR: Backhoe/Excavator/Trackhoe Heavy
SUGA2012-091
$18.86 $1.76 $20.62
OPERATOR: Backhoe/Excavator/Trackhoe Highway
SUGA2022-009
$23.40 $3.73 $27.13
OPERATOR: Crane Building
ENGI0926-036
$38.53 $16.08 $54.61
OPERATOR: Oiler Building
SUGA2012-025
$12.00 0.00 $12.00
OPERATOR: OPERATOR: Bulldozer Highway
SUGA2022-009
$22.82 0.00 $22.82
OPERATOR: OPERATOR: Crane Highway
SUGA2022-009
$39.31 0.00 $39.31
OPERATOR: OPERATOR: Grader/Blade Heavy
SUGA2012-091
$18.88 $1.32 $20.20
OPERATOR: OPERATOR: Grader/Blade Highway
SUGA2022-009
$26.31 $5.43 $31.74
OPERATOR: OPERATOR: Loader Heavy
SUGA2012-091
$15.92 0.00 $15.92
OPERATOR: OPERATOR: Loader Highway
SUGA2022-009
$22.81 $1.91 $24.72
OPERATOR: OPERATOR: Paver Highway
SUGA2022-009 (Asphalt, Aggregate, and Concrete)
$23.22 $4.10 $27.32
OPERATOR: OPERATOR: Roller Highway
SUGA2022-009
$18.51 $3.99 $22.50
OPERATOR: TRAFFIC CONTROL: Flagger Highway
SUGA2022-009
$14.64 0.00 $14.64
OPERATOR: TRUCK DRIVER: Dump Truck Heavy
SUGA2012-091
$12.00 $2.14 $14.14
OPERATOR: TRUCK DRIVER: Dump Truck Highway
SUGA2022-009
$21.58 $3.58 $25.16
PAINTER: Brush Only Residential
SUGA2008-075
$10.47 0.00 $10.47
PAINTER: Brush, Roller, Spray Building
PAIN0193-001
$26.00 $14.90 $40.90
PIPEFITTER Building
PLUM0052-007 (Including HVAC Pipe and HVAC Unit Installation)
$30.00 $16.66 $46.66
PIPEFITTER Building
PLUM0072-028 (Including HVAC Pipe and HVAC Unit Installation)
$38.98 $17.01 $55.99
PLUMBER Building
PLUM0052-007 Scope differs by code/WD
$30.00 $16.66 $46.66
PLUMBER Building
PLUM0072-028 Scope differs by code/WD
$38.98 $17.01 $55.99
PLUMBER, Excludes HVAC Pipe Installation Residential
SUGA2008-075
$12.72 0.00 $12.72
POWER EQUIPMENT OPERATOR: Crane (over 10 tons) Building
ENGI0474-033
$32.00 $17.70 $49.70
POWER EQUIPMENT OPERATOR: Crane (over 120 tons) Building
ENGI0474-033
$33.00 $17.70 $50.70
POWER EQUIPMENT OPERATOR: Crane (over 250 tons) Building
ENGI0474-033
$34.00 $17.70 $51.70
ROOFER Building
SUGA2012-025
$13.62 0.00 $13.62
SHEET METAL WORKER Residential
SUGA2008-075
$9.73 0.00 $9.73
SHEET METAL WORKER Building
SHEE0085-009 (HVAC Duct Installation Only)
$37.75 $17.95 $55.70
SHEET METAL WORKER, Excludes HVAC Duct Installation Building
SUGA2012-025
$18.91 0.00 $18.91
SPRINKLER FITTER Building
SUGA2012-025 (Fire Sprinklers)
$18.81 $1.44 $20.25

Wage Determinations

Residential

0 trades

Applies to

Baldwin, Bleckley, Crisp, Dodge, Dooly, Laurens, Macon, Peach, Pulaski, Putnam +9 more

Heavy

0 trades

Applies to

Baldwin, Bleckley, Dodge, Dooly, Laurens, Macon, Schley, Stewart, Sumter, Talbot +6 more

Highway

0 trades

Applies to

Chattahoochee, Harris, Marion, Muscogee, Stewart, Talbot in Georgia.

Building

0 trades

Applies to

Crisp, Dodge, Dooly, Macon, Schley, Stewart, Sumter, Taylor, Upson, Webster +2 more