| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0026-001 | $34.21 | $23.92 | $58.13 |
| CARPENTER Building SUGA2012-015 | $18.91 | $3.37 | $22.28 |
| CEMENT MASON/CONCRETE FINISHER Building SUGA2012-015 | $12.89 | 0.00 | $12.89 |
| ELECTRICIAN Building SUGA2012-015 | $23.34 | $3.70 | $27.04 |
| ELEVATOR MECHANIC Building ELEV0032-001 | $52.08 | $38.44 | $90.52 |
| IRONWORKER, REINFORCING Building SUGA2012-015 | $17.72 | 0.00 | $17.72 |
| IRONWORKER, STRUCTURAL Building SUGA2012-015 | $16.75 | 0.00 | $16.75 |
| LABORER: Common or General Building SUGA2012-015 | $10.00 | $0.19 | $10.19 |
| LABORER: Pipelayer Building SUGA2012-015 | $15.50 | 0.00 | $15.50 |
| OPERATOR: Backhoe/Excavator Building SUGA2012-015 | $14.00 | 0.00 | $14.00 |
| OPERATOR: Crane Building ENGI0926-034 | $38.53 | $16.08 | $54.61 |
| OPERATOR: Oiler Building SUGA2012-015 | $12.00 | 0.00 | $12.00 |
| PAINTER: Brush, Roller and Spray Building SUGA2012-015 | $14.00 | $0.27 | $14.27 |
| PIPEFITTER Building PLUM0072-024 (Including Installation of HVAC Pipe, HVAC Unit, & HVAC Electrical /Temperature Controls) | $38.98 | $17.01 | $55.99 |
| PLUMBER, Excludes Installation of HVAC Pipe, HVAC Unit, and HVAC Electrical/Temperature Controls Building SUGA2012-015 | $17.54 | $1.27 | $18.81 |
| ROOFER Building SUGA2012-015 | $13.62 | 0.00 | $13.62 |
| SHEET METAL WORKER Building SUGA2012-015 (HVAC Duct Installation Only) | $24.89 | $9.09 | $33.98 |
| SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUGA2012-015 | $15.77 | 0.00 | $15.77 |