GA20260100
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0026-001 | $34.21 | $23.92 | $58.13 |
| CARPENTER, Excludes Drywall Hanging, and Metal Stud Installation Building SUGA2012-018 | $18.00 | 0.00 | $18.00 |
| CEMENT MASON/CONCRETE FINISHER Building SUGA2012-018 | $12.45 | $0.54 | $12.99 |
| DRYWALL HANGER, Includes Metal Stud Installation Building SUGA2012-018 | $12.00 | 0.00 | $12.00 |
| ELECTRICIAN Building ELEC0613-006 (Including Low Voltage Wiring) | $38.65 | $33.00 | $71.65 |
| ELEVATOR MECHANIC Building ELEV0032-001 | $52.08 | $38.44 | $90.52 |
| GLAZIER Building SUGA2012-018 | $14.93 | $1.11 | $16.04 |
| IRONWORKER, REINFORCING Building SUGA2012-018 | $17.72 | 0.00 | $17.72 |
| IRONWORKER, STRUCTURAL Building SUGA2012-018 | $16.75 | 0.00 | $16.75 |
| LABORER: Common or General Building SUGA2012-018 | $10.51 | $0.59 | $11.10 |
| LABORER: Pipelayer Building SUGA2012-018 | $13.33 | 0.00 | $13.33 |
| OPERATOR: Backhoe/Excavator Building SUGA2012-018 | $15.50 | $0.65 | $16.15 |
| OPERATOR: Crane Building ENGI0926-034 | $38.53 | $16.08 | $54.61 |
| OPERATOR: Oiler Building SUGA2012-018 | $12.00 | 0.00 | $12.00 |
| PAINTER: Brush, Roller, Spray Building PAIN0193-001 | $26.00 | $14.90 | $40.90 |
| PIPEFITTER Building PLUM0052-006 (Including HVAC Pipe and HVAC Unit Installation) | $30.00 | $16.66 | $46.66 |
| PLUMBER Building PLUM0052-006 | $30.00 | $16.66 | $46.66 |
| ROOFER Building SUGA2012-018 | $13.62 | 0.00 | $13.62 |
| SHEET METAL WORKER Building SHEE0085-009 (HVAC Duct Installation Only) | $37.75 | $17.95 | $55.70 |
| SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUGA2012-018 | $18.91 | 0.00 | $18.91 |
| SPRINKLER FITTER Building SUGA2012-018 (Fire Sprinklers) | $18.81 | $1.44 | $20.25 |
No trade rates match your search and filter selection.
Building