Bannock County in Idaho.

1 wage determination 29 trade rates

Popular Trades In Bannock County in Idaho.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
CARPENTER (Form Work Only) Highway
SUID2013-019
$26.24 $9.48 $35.72
CARPENTER, Excludes Form Work Highway
SUID2013-019
$23.92 $9.84 $33.76
CEMENT MASON/CONCRETE FINISHER Highway
SUID2013-019
$22.90 $11.99 $34.89
ELECTRICIAN Highway
SUID2013-019
$26.33 $11.45 $37.78
HIGHWAY/PARKING LOT STRIPING: LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway
SUID2013-019
$19.38 $7.63 $27.01
HIGHWAY/PARKING LOT STRIPING: LABORER: Common or General Highway
SUID2013-019
$19.18 $7.65 $26.83
HIGHWAY/PARKING LOT STRIPING: LABORER: Grade Checker Highway
SUID2013-019
$20.64 $7.37 $28.01
HIGHWAY/PARKING LOT STRIPING: LABORER: Mason Tender - Cement/Concrete Highway
SUID2013-019
$22.34 $10.90 $33.24
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway
SUID2013-019
$21.15 $8.20 $29.35
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Broom/Sweeper Highway
SUID2013-019
$24.34 $8.04 $32.38
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Crane Highway
SUID2013-019
$23.34 $9.45 $32.79
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Forklift Highway
SUID2013-019
$23.13 $9.17 $32.30
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Oiler Highway
SUID2013-019
$22.25 $6.52 $28.77
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Paver Highway
SUID2013-019 (Asphalt, Aggregate, and Concrete)
$24.37 $7.11 $31.48
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Roller (Subgrade) Highway
SUID2013-019
$19.99 $7.99 $27.98
HIGHWAY/PARKING LOT STRIPING: OPERATOR: Screed Highway
SUID2013-019
$22.30 $7.22 $29.52
HIGHWAY/PARKING LOT STRIPING: Painter Highway
SUID2013-019
$25.47 $9.52 $34.99
LABORER: Pipelayer Highway
LABO0238-035
$28.48 $13.00 $41.48
POWER EQUIPMENT OPERATOR: Blade Operator, Backhoe/Trackhoe/Excavator Highway
ENGI0370-043 (3/4 yds- 3 1/2 yds, Front End Loader (over 4 yds to and including 7yds) GROUP 6
$36.98 $16.10 $53.08
POWER EQUIPMENT OPERATOR: Bulldozer GROUP 8 Highway
ENGI0370-043
$37.58 $16.10 $53.68
POWER EQUIPMENT OPERATOR: Elevating Grader Operator, Backhoe/Trackhoe/Excavator Highway
ENGI0370-043 (under 3/4 yds) GROUP 5
$36.81 $16.10 $52.91
POWER EQUIPMENT OPERATOR: Front End Loader Highway
ENGI0370-043 (up to 4yd) GROUP 4
$36.64 $16.10 $52.74
POWER EQUIPMENT OPERATOR: Grader Highway
ENGI0370-043 (Fine), Front End Loader (over 7 yds), Heavy Duty Mechanic GROUP 7
$37.35 $16.10 $53.45
POWER EQUIPMENT OPERATOR: Roller GROUP 3 Highway
ENGI0370-043
$36.33 $16.10 $52.43
TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper Highway
SUID2013-019
$17.69 $4.66 $22.35
TRAFFIC CONTROL: TRUCK DRIVER: Dump Truck Highway
SUID2013-019
$21.59 $10.93 $32.52
TRAFFIC CONTROL: TRUCK DRIVER: Lowboy Truck Highway
SUID2013-019
$26.61 $13.21 $39.82
TRAFFIC CONTROL: TRUCK DRIVER: Oil Distributor Truck Highway
SUID2013-019
$23.93 $11.27 $35.20
TRAFFIC CONTROL: TRUCK DRIVER: Water Truck Highway
SUID2013-019
$21.54 $12.19 $33.73

Wage Determinations