ID20260103
rev 1Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building BRIC0001-001 | $35.53 | $19.85 | $55.38 |
| CARPENTER Building SUID2021-004 | $22.49 | $3.61 | $26.10 |
| CEMENT MASON/CONCRETE FINISHER Building SUID2021-004 | $22.21 | $3.80 | $26.01 |
| ELECTRICIAN Building ELEC0291-007 | $42.25 | $16.30 | $58.55 |
| IRONWORKER Building IRON0732-004 | $33.37 | $22.98 | $56.35 |
| LABORER Grade Checker Building LABO0155-012 | $33.98 | $13.80 | $47.78 |
| LABORER: Common or General Building SUID2021-004 | $17.26 | $3.62 | $20.88 |
| Loader Building ENGI0302-012 | $36.14 | $16.10 | $52.24 |
| Mason Tender - Cement/Concrete Building LABO0155-012 | $33.93 | $13.80 | $47.73 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUID2021-004 | $23.60 | $4.33 | $27.93 |
| OPERATOR: PAINTER Building SUID2021-004 | $17.11 | $1.25 | $18.36 |
| OPERATOR: ROOFER Building SUID2021-004 | $19.08 | $2.06 | $21.14 |
| OPERATOR: TRUCK DRIVER: Dump Truck Building SUID2021-004 | $25.06 | $8.81 | $33.87 |
| POWER EQUIPMENT OPERATOR Forklift Building ENGI0302-012 | $36.33 | $15.40 | $51.73 |
| SHEET METAL WORKER Building SHEE0055-007 (HVAC Unit Installation Only) | $39.20 | $23.59 | $62.79 |
| SHEET METAL WORKER Building SHEE0103-017 (Excludes HVAC Unit Installation) | $35.50 | $22.52 | $58.02 |
No trade rates match your search and filter selection.
Building