Trade & Classification Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0027-009 (MECHANICAL (Duct, Pipe & Mechanical System Insulation))
$30.50 $11.64 $42.14
BRICKLAYER Building
BRKS0015-013
$28.34 $10.33 $38.67
Bulldozer Heavy
ENGI0101-045
$39.57 $21.69 $61.26
CARPENTER Heavy
SUKS2022-004
$28.89 $8.87 $37.76
CARPENTER Building
CARP0918-002 (Drywall Hanging Only)
$28.34 $14.08 $42.42
CARPENTER (Form Work Only) Building
SUKS2015-018
$17.58 0.00 $17.58
CARPENTER, Excludes Drywall Hanging, and Form Work Building
SUKS2015-018
$18.00 $5.18 $23.18
CARPENTER, Includes Form Work Highway
SUKS2019-075
$16.03 $4.26 $20.29
CEMENT MASON/CONCRETE FINISHER Heavy
PLAS0518-003
$39.06 $18.71 $57.77
CEMENT MASON/CONCRETE FINISHER Building
SUKS2015-018
$20.26 0.00 $20.26
CEMENT MASON/CONCRETE FINISHER Highway
SUKS2019-075
$15.31 0.00 $15.31
ELECTRICIAN Heavy
ELEC0271-006
$40.64 $18.29 $58.93
ELECTRICIAN Building
SUKS2015-018
$29.02 $10.27 $39.29
ELECTRICIAN Highway
SUKS2019-075
$29.93 $14.14 $44.07
ELEVATOR MECHANIC Building
ELEV0012-004
$60.69 $38.44 $99.13
Forklift Heavy
ENGI0101-045
$36.09 $16.83 $52.92
Grader/Blade Heavy
ENGI0101-045
$39.57 $21.69 $61.26
IRONWORKER Heavy
IRON0010-002
$39.00 $34.25 $73.25
IRONWORKER Building
IRON0010-033 (Ornamental and Structural)
$36.00 $34.25 $70.25
IRONWORKER, REINFORCING Building
SUKS2015-018
$27.50 $21.45 $48.95
IRONWORKER, REINFORCING Highway
SUKS2019-075
$15.48 0.00 $15.48
IRONWORKER, STRUCTURAL Highway
IRON0010-009
$39.00 $34.25 $73.25
LABORER (Mason Tender - Brick) Building
LABO1290-017
$17.20 $10.27 $27.47
LABORER (Pipelayer) Heavy
LABO1290-003
$36.24 $15.87 $52.11
LABORER: Common or General Heavy
SUKS2022-004
$21.36 0.00 $21.36
LABORER: Common or General Building
SUKS2015-018
$15.75 $7.34 $23.09
LABORER: Common or General Highway
SUKS2019-075
$14.58 0.00 $14.58
LABORER: Concrete Saw Highway
SUKS2019-075 (Hand Held/Walk Behind)
$29.21 $14.63 $43.84
LABORER: Flagger Highway
SUKS2019-075
$11.63 0.00 $11.63
LABORER: Mason Tender - Cement/Concrete Building
SUKS2015-018
$17.86 $1.01 $18.87
LABORER: Mason Tender - Cement/Concrete Highway
SUKS2019-075
$29.75 $12.83 $42.58
LINE CONSTRUCTION (Lineman) Heavy
ELEC0304-001
$53.68 $10.60 $64.28
OPERATOR: Backhoe/Excavator/Trackhoe Heavy
SUKS2022-004
$30.08 $15.38 $45.46
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUKS2015-018
$32.88 $12.80 $45.68
OPERATOR: Backhoe/Excavator/Trackhoe Highway
SUKS2019-075
$19.44 $3.50 $22.94
OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building
SUKS2015-018
$27.78 $12.58 $40.36
OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway
SUKS2019-075
$16.78 $2.62 $19.40
OPERATOR: OPERATOR: Broom/Sweeper Highway
SUKS2019-075
$14.81 0.00 $14.81
OPERATOR: OPERATOR: Bulldozer Building
SUKS2015-018
$33.12 $13.96 $47.08
OPERATOR: OPERATOR: Bulldozer Highway
SUKS2019-075
$19.00 $4.00 $23.00
OPERATOR: OPERATOR: Concrete Finishing Machine Highway
SUKS2019-075
$24.26 0.00 $24.26
OPERATOR: OPERATOR: Crane Heavy
SUKS2022-004
$32.13 $9.58 $41.71
OPERATOR: OPERATOR: Crane Building
SUKS2015-018
$33.19 $14.16 $47.35
OPERATOR: OPERATOR: Crane Highway
SUKS2019-075
$23.49 $8.55 $32.04
OPERATOR: OPERATOR: Distributor Highway
SUKS2019-075
$15.33 0.00 $15.33
OPERATOR: OPERATOR: Forklift Building
SUKS2015-018
$37.92 0.00 $37.92
OPERATOR: OPERATOR: Grader/Blade Building
SUKS2015-018
$28.79 $12.73 $41.52
OPERATOR: OPERATOR: Grader/Blade Highway
SUKS2019-075
$18.06 $3.95 $22.01
OPERATOR: OPERATOR: Loader Heavy
SUKS2022-004
$24.68 0.00 $24.68
OPERATOR: OPERATOR: Loader Building
SUKS2015-018
$26.30 $11.62 $37.92
OPERATOR: OPERATOR: Loader Highway
SUKS2019-075
$17.36 0.00 $17.36
OPERATOR: OPERATOR: Material Transfer Vehicle Highway
SUKS2019-075
$14.65 0.00 $14.65
OPERATOR: OPERATOR: Mechanic Highway
SUKS2019-075
$20.89 0.00 $20.89
OPERATOR: OPERATOR: Paver Highway
SUKS2019-075 (Asphalt, Aggregate, and Concrete)
$16.51 0.00 $16.51
OPERATOR: OPERATOR: Roller Building
SUKS2015-018
$33.78 $13.64 $47.42
OPERATOR: OPERATOR: Roller Highway
SUKS2019-075
$14.43 0.00 $14.43
OPERATOR: OPERATOR: Roto Mill Highway
SUKS2019-075
$19.28 0.00 $19.28
OPERATOR: OPERATOR: Roto Mill Groundman Highway
SUKS2019-075
$18.43 0.00 $18.43
OPERATOR: OPERATOR: Scraper Highway
SUKS2019-075
$17.67 0.00 $17.67
OPERATOR: OPERATOR: Screed Highway
SUKS2019-075
$14.70 0.00 $14.70
OPERATOR: OPERATOR: Striping Machine Highway
SUKS2019-075
$27.27 $12.25 $39.52
OPERATOR: OPERATOR: Tractor Highway
SUKS2019-075
$14.96 0.00 $14.96
OPERATOR: PAINTER (Brush and Roller) Building
SUKS2015-018
$22.07 $0.97 $23.04
OPERATOR: PIPEFITTER Building
SUKS2015-018
$30.51 $13.54 $44.05
OPERATOR: PLUMBER Building
SUKS2015-018
$32.35 $13.94 $46.29
OPERATOR: ROOFER Building
SUKS2015-018
$22.87 $6.84 $29.71
OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building
SUKS2015-018
$29.93 $13.32 $43.25
OPERATOR: TRAFFIC CONTROL: Service Driver Highway
SUKS2019-075
$14.07 0.00 $14.07
OPERATOR: TRUCK DRIVER: Dump (All Types) Building
SUKS2015-018
$17.05 0.00 $17.05
OPERATOR: TRUCK DRIVER: Dump Truck Heavy
SUKS2022-004
$24.47 $15.63 $40.10
PAINTER (Spray) Building
PAIN2012-009
$36.18 $19.97 $56.15
POWER EQUIPMENT OPERATOR Bobcat/Skid Steer/Skid Loader Heavy
ENGI0101-045
$36.09 $16.83 $52.92
POWER EQUIPMENT OPERATOR: Oiler Building
ENGI0101-041
$39.93 $22.42 $62.35
POWER EQUIPMENT OPERATOR: Paver Building
ENGI0101-041 (Asphalt, Aggregate, and Concrete)
$45.48 $22.42 $67.90
Roller Heavy
ENGI0101-045
$39.57 $21.69 $61.26
SHEET METAL WORKER Building
SHEE0002-011 (HVAC Duct Installation Only)
$52.18 $27.15 $79.33
SPRINKLER FITTER Building
SFKS0669-002 (Fire Sprinkler)
$41.83 $27.60 $69.43
TILE FINISHER Building
BRKS0015-014
$20.74 $1.46 $22.20
TILE SETTER Building
BRKS0015-011
$42.73 $18.39 $61.12
TRAFFIC SIGNALIZATION: Traffic Signal Installation Highway
SUKS2019-075 (Groundman)
$16.54 0.00 $16.54
TRAFFIC SIGNALIZATION: TRUCK DRIVER: Dump and Tandem Highway
SUKS2019-075
$16.05 0.00 $16.05
TRAFFIC SIGNALIZATION: TRUCK DRIVER: Flatbed and Lowboy Highway
SUKS2019-075
$23.82 $9.89 $33.71
TRAFFIC SIGNALIZATION: TRUCK DRIVER: Off Road Truck Highway
SUKS2019-075
$19.06 0.00 $19.06
TRAFFIC SIGNALIZATION: TRUCK DRIVER: Water Truck Highway
SUKS2019-075
$22.45 $11.51 $33.96
TRUCK DRIVER Building
TEAM0541-011 (Semi-Trailer Truck)
$39.89 $15.85 $55.74
TRUCK DRIVER (Lowboy Truck) Building
TEAM0541-010
$39.89 $15.85 $55.74