| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0027-005 (MECHANICAL (Duct, Pipe & Mechanical System Insulation)) | $43.60 | $33.52 | $77.12 |
| BRICKLAYER Building BRKS0015-012 | $43.57 | $23.02 | $66.59 |
| CARPENTER Building CARP0315-003 (Acoustical Ceiling Installation Only) | $43.28 | $21.25 | $64.53 |
| CARPENTER Building CARP0315-004 (Excludes Acoustical Ceiling Installation, Drywall Hanging and Floor Laying Carpet) | $44.63 | $22.40 | $67.03 |
| CARPENTER Building CARP1181-001 (Floor Laying-Carpet Only) | $40.94 | $21.25 | $62.19 |
| CARPENTER Building SUKS2015-022 (Drywall Hanging Only) | $30.00 | $1.62 | $31.62 |
| CARPENTER (Excludes Form Work) Highway CARP0315-005 | $43.28 | $21.25 | $64.53 |
| CARPENTER (Form Work Only) Highway SUKS2019-080 | $30.23 | $12.71 | $42.94 |
| CEMENT MASON/CONCRETE FINISHER Building SUKS2015-022 | $25.93 | $11.62 | $37.55 |
| CEMENT MASON/CONCRETE FINISHER Highway SUKS2019-080 | $30.06 | $14.85 | $44.91 |
| ELECTRICIAN Building ELEC0124-011 (Excludes Low Voltage Wiring) | $51.01 | $26.25 | $77.26 |
| ELECTRICIAN Building SUKS2015-022 (Low Voltage Wiring Only) | $32.91 | $18.15 | $51.06 |
| ELECTRICIAN Highway SUKS2019-080 | $29.93 | $14.14 | $44.07 |
| ELEVATOR MECHANIC Building ELEV0012-004 | $60.69 | $38.44 | $99.13 |
| GLAZIER Building PAIN0558-006 | $39.32 | $22.34 | $61.66 |
| IRONWORKER Building IRON0010-032 (Ornamental, Reinforcing and Structural) | $39.00 | $34.25 | $73.25 |
| IRONWORKER Highway IRON0010-015 (REINFORCING AND STRUCTURAL) | $39.00 | $34.25 | $73.25 |
| LABORER Highway LABO0663-017 (Concrete Saw (Hand Held/Walk Behind)) | $37.45 | $15.87 | $53.32 |
| LABORER Highway LABO1290-002 (Asphalt, Includes Raker, Shoveler, Spreader, and Distributor) | $37.45 | $15.87 | $53.32 |
| LABORER (Mason Tender - Brick) Building LABO1290-015 | $31.25 | $18.25 | $49.50 |
| LABORER: Common or General Building SUKS2015-022 | $25.49 | $12.95 | $38.44 |
| LABORER: Common or General Highway SUKS2019-080 | $27.97 | $13.76 | $41.73 |
| LABORER: Concrete Saw Building SUKS2015-022 (Hand Held/Walk Behind) | $28.44 | $11.60 | $40.04 |
| LABORER: Flagger Highway SUKS2019-080 | $13.20 | 0.00 | $13.20 |
| LABORER: Landscape Building SUKS2015-022 | $12.48 | 0.00 | $12.48 |
| LABORER: Mason Tender - Cement/Concrete Building SUKS2015-022 | $17.86 | $1.01 | $18.87 |
| LABORER: Mason Tender - Cement/Concrete Highway SUKS2019-080 | $29.75 | $12.83 | $42.58 |
| Laborers: Building LABO1290-011 (Asphalt, Includes Raker, Shoveler, Spreader and Distributor) | $31.99 | $16.03 | $48.02 |
| LINE CONSTRUCTION: Equipment Operator Highway SUKS2019-080 | $32.15 | $15.06 | $47.21 |
| LINE CONSTRUCTION: Groundman Highway SUKS2019-080 | $26.76 | $12.71 | $39.47 |
| LINE CONSTRUCTION: Lineman Highway SUKS2019-080 | $41.52 | $17.56 | $59.08 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUKS2015-022 | $33.85 | $13.87 | $47.72 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUKS2019-080 | $35.23 | $15.53 | $50.76 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUKS2015-022 | $33.53 | $13.66 | $47.19 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway SUKS2019-080 | $34.58 | $15.13 | $49.71 |
| OPERATOR: OPERATOR: Bulldozer Building SUKS2015-022 | $33.12 | $13.96 | $47.08 |
| OPERATOR: OPERATOR: Bulldozer Highway SUKS2019-080 | $28.15 | $11.65 | $39.80 |
| OPERATOR: OPERATOR: Concrete Finishing Machine Highway SUKS2019-080 | $24.26 | 0.00 | $24.26 |
| OPERATOR: OPERATOR: Concrete Saw Highway SUKS2019-080 | $33.87 | $15.16 | $49.03 |
| OPERATOR: OPERATOR: Crane Highway SUKS2019-080 | $30.38 | $11.08 | $41.46 |
| OPERATOR: OPERATOR: Grader/Blade Highway SUKS2019-080 | $29.66 | $12.55 | $42.21 |
| OPERATOR: OPERATOR: Loader Building SUKS2015-022 | $30.35 | $12.04 | $42.39 |
| OPERATOR: OPERATOR: Loader Highway SUKS2019-080 | $33.88 | $15.07 | $48.95 |
| OPERATOR: OPERATOR: Material Transfer Vehicle Highway SUKS2019-080 | $14.65 | 0.00 | $14.65 |
| OPERATOR: OPERATOR: Mechanic Highway SUKS2019-080 | $32.25 | $15.31 | $47.56 |
| OPERATOR: OPERATOR: Paver Highway SUKS2019-080 (Asphalt, Aggregate, and Concrete) | $32.88 | $15.53 | $48.41 |
| OPERATOR: OPERATOR: Roller Building SUKS2015-022 | $32.18 | $13.49 | $45.67 |
| OPERATOR: OPERATOR: Roller Highway SUKS2019-080 | $29.00 | $11.40 | $40.40 |
| OPERATOR: OPERATOR: Roto Mill Groundman Highway SUKS2019-080 | $18.43 | 0.00 | $18.43 |
| OPERATOR: OPERATOR: Scraper Highway SUKS2019-080 | $17.67 | 0.00 | $17.67 |
| OPERATOR: OPERATOR: Screed Highway SUKS2019-080 | $17.38 | $3.52 | $20.90 |
| OPERATOR: OPERATOR: Striping Machine Highway SUKS2019-080 | $27.27 | $12.25 | $39.52 |
| OPERATOR: OPERATOR: Tractor Highway SUKS2019-080 | $24.28 | 0.00 | $24.28 |
| OPERATOR: PAINTER (Brush and Roller) Building SUKS2015-022 | $23.69 | $9.39 | $33.08 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUKS2015-022 | $38.39 | $17.73 | $56.12 |
| OPERATOR: TRAFFIC CONTROL: Service Driver Highway SUKS2019-080 | $14.15 | $2.44 | $16.59 |
| OPERATOR: TRUCK DRIVER: Dump (All Types) Building SUKS2015-022 | $28.58 | $11.22 | $39.80 |
| PAINTER Building PAIN2012-010 (Drywall Finishing/Taping) | $36.18 | $19.97 | $56.15 |
| PAINTER (Spray) Building PAIN2012-009 | $36.18 | $19.97 | $56.15 |
| PIPEFITTER Building PLUM0533-013 (Including HVAC Pipe, Unit, and Installation of HVAC Electricial/Temperature Controls) | $55.56 | $25.80 | $81.36 |
| PLASTERER Building PLAS0518-017 | $37.92 | $18.83 | $56.75 |
| PLUMBER Building PLUM0008-020 | $54.28 | $23.79 | $78.07 |
| POWER EQUIPMENT OPERATOR Broom/Sweeper Highway ENGI0101-023 | $40.17 | $22.29 | $62.46 |
| POWER EQUIPMENT OPERATOR: Crane Building ENGI0101-043 | $47.29 | $22.42 | $69.71 |
| POWER EQUIPMENT OPERATOR: Forklift Building ENGI0101-043 | $44.14 | $22.42 | $66.56 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Building ENGI0101-043 | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: Oiler Building ENGI0101-043 | $39.93 | $22.42 | $62.35 |
| POWER EQUIPMENT OPERATOR: Paver Building ENGI0101-043 (Asphalt, Aggregate, and Concrete) | $45.48 | $22.42 | $67.90 |
| ROOFER Building ROOF0020-021 | $38.45 | $22.29 | $60.74 |
| Roto Mill Highway ENGI0101-023 | $40.17 | $22.29 | $62.46 |
| SHEET METAL WORKER Building SHEE0002-011 (HVAC Duct Installation Only) | $52.18 | $27.15 | $79.33 |
| SPRINKLER FITTER Building SFKS0314-002 (Fire Sprinklers) | $40.74 | $22.15 | $62.89 |
| TILE FINISHER Building BRKS0015-014 | $20.74 | $1.46 | $22.20 |
| TILE SETTER Building BRKS0015-011 | $42.73 | $18.39 | $61.12 |
| TRAFFIC SIGNALIZATION: Traffic Signal Installation Highway SUKS2019-080 (Groundman) | $17.10 | 0.00 | $17.10 |
| TRAFFIC SIGNALIZATION: TRUCK DRIVER: Dump and Tandem Highway SUKS2019-080 | $29.04 | $12.45 | $41.49 |
| TRAFFIC SIGNALIZATION: TRUCK DRIVER: Flatbed and Lowboy Highway SUKS2019-080 | $27.96 | $14.05 | $42.01 |
| TRAFFIC SIGNALIZATION: TRUCK DRIVER: Off Road Truck Highway SUKS2019-080 | $19.06 | 0.00 | $19.06 |
| TRUCK DRIVER Building TEAM0541-011 (Semi-Trailer Truck) | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER (Lowboy Truck) Building TEAM0541-010 | $39.89 | $15.85 | $55.74 |
| TRUCK DRIVER (Water Truck) Highway TEAM0541-013 | $38.04 | $15.85 | $53.89 |