Lyon County in Kansas.

2 wage determinations 48 trade rates

Popular Trades In Lyon County in Kansas.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0027-002
$43.60 $33.52 $77.12
BRICKLAYER Building
BRKS0015-010
$24.15 $11.61 $35.76
CARPENTER Building
SUKS2015-006
$17.77 $3.96 $21.73
CARPENTER Highway
SUKS2019-037
$14.94 0.00 $14.94
CEMENT MASON/CONCRETE FINISHER Building
SUKS2015-006
$17.51 $3.38 $20.89
CEMENT MASON/CONCRETE FINISHER Highway
SUKS2019-037
$19.67 0.00 $19.67
ELECTRICIAN Building
ELEC0661-005
$36.74 $14.50 $51.24
ELECTRICIAN Highway
SUKS2019-037
$26.57 $8.70 $35.27
FORM WORKER Highway
SUKS2019-037
$15.29 $1.85 $17.14
IRONWORKER, REINFORCING Building
IRON0010-031
$39.00 $34.25 $73.25
IRONWORKER, REINFORCING Highway
SUKS2019-037
$16.91 0.00 $16.91
IRONWORKER, STRUCTURAL Building
SUKS2015-006
$23.02 $15.09 $38.11
IRONWORKER, STRUCTURAL Highway
IRON0010-007
$39.00 $34.25 $73.25
LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway
SUKS2019-037
$14.38 0.00 $14.38
LABORER: Common or General Building
SUKS2015-006
$12.53 $4.36 $16.89
LABORER: Common or General Highway
SUKS2019-037
$17.43 0.00 $17.43
LABORER: Flagger Highway
SUKS2019-037
$11.59 0.00 $11.59
OPERATOR: Asphalt Plant Highway
SUKS2019-037
$14.81 0.00 $14.81
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUKS2015-006
$15.72 $1.95 $17.67
OPERATOR: Backhoe/Excavator/Trackhoe Highway
SUKS2019-037
$20.55 $4.26 $24.81
OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Highway
SUKS2019-037
$18.88 $3.62 $22.50
OPERATOR: OPERATOR: Broom/Sweeper Highway
SUKS2019-037
$14.68 0.00 $14.68
OPERATOR: OPERATOR: Bulldozer Highway
SUKS2019-037
$17.49 $2.37 $19.86
OPERATOR: OPERATOR: Concrete Finishing Machine Highway
SUKS2019-037
$21.11 0.00 $21.11
OPERATOR: OPERATOR: Crane Highway
SUKS2019-037
$21.39 $9.04 $30.43
OPERATOR: OPERATOR: Grader/Blade Highway
SUKS2019-037
$22.76 $6.79 $29.55
OPERATOR: OPERATOR: Loader Highway
SUKS2019-037
$20.33 0.00 $20.33
OPERATOR: OPERATOR: Material Transfer Vehicle Highway
SUKS2019-037
$13.92 0.00 $13.92
OPERATOR: OPERATOR: Mechanic Highway
SUKS2019-037
$22.26 0.00 $22.26
OPERATOR: OPERATOR: Paver Highway
SUKS2019-037 (Asphalt, Aggregate, and Concrete)
$16.55 0.00 $16.55
OPERATOR: OPERATOR: Roller Highway
SUKS2019-037
$15.43 0.00 $15.43
OPERATOR: OPERATOR: Roto Mill Highway
SUKS2019-037
$18.29 0.00 $18.29
OPERATOR: OPERATOR: Roto Mill Groundman Highway
SUKS2019-037
$15.31 0.00 $15.31
OPERATOR: OPERATOR: Scraper Highway
SUKS2019-037
$15.79 0.00 $15.79
OPERATOR: OPERATOR: Screed Highway
SUKS2019-037
$15.71 0.00 $15.71
OPERATOR: OPERATOR: Striping Machine Highway
SUKS2019-037
$19.93 $4.49 $24.42
OPERATOR: OPERATOR: Tractor Highway
SUKS2019-037
$15.81 0.00 $15.81
OPERATOR: PLUMBER Building
SUKS2015-006
$27.29 $10.08 $37.37
OPERATOR: ROOFER Building
SUKS2015-006
$14.40 $2.48 $16.88
OPERATOR: SHEET METAL WORKER Building
SUKS2015-006 (HVAC Duct Installation Only)
$25.71 $7.30 $33.01
OPERATOR: TRAFFIC CONTROL: Service Driver Highway
SUKS2019-037
$13.90 0.00 $13.90
OPERATOR: TRUCK DRIVER: Dump and Tandem Highway
SUKS2019-037
$17.55 0.00 $17.55
OPERATOR: TRUCK DRIVER: Flatbed and Lowboy Highway
SUKS2019-037
$19.50 0.00 $19.50
OPERATOR: TRUCK DRIVER: Off Road Truck Highway
SUKS2019-037
$16.42 0.00 $16.42
OPERATOR: TRUCK DRIVER: Water Truck Highway
SUKS2019-037
$17.07 0.00 $17.07
PAINTER (Brush and Roller) Building
PAIN2012-007
$36.18 $19.97 $56.15
PIPEFITTER Building
PLUM0441-001
$45.90 $19.94 $65.84
SHEET METAL WORKER Building
SHEE0002-035 (Excludes HVAC Duct Installation)
$52.18 $27.15 $79.33

Wage Determinations