MO20260028
rev 1Building
0 trades
Applies to
Adair, Atchison in Missouri.
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0039-001 Scope differs by code/WD | $38.26 | $20.54 | $58.80 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0074-003 Scope differs by code/WD | $32.37 | $20.17 | $52.54 |
| BRICKLAYER Building BRMO0011-007 Scope differs by code/WD | $32.79 | $21.31 | $54.10 |
| BRICKLAYER Building BRMO0015-008 Scope differs by code/WD | $36.33 | $19.73 | $56.06 |
| CARPENTER, Excludes Form Work Building CARP0010-006 Scope differs by code/WD | $31.51 | $22.25 | $53.76 |
| CARPENTER, Excludes Form Work Building CARP0110-001 Scope differs by code/WD | $39.59 | $22.40 | $61.99 |
| CEMENT MASON/CONCRETE FINISHER Building SUMO2010-027 | $18.86 | $7.50 | $26.36 |
| Common or General & Landscape Building LABO0579-001 Scope differs by code/WD | $32.31 | $15.75 | $48.06 |
| Common or General & Landscape Building LABO0955-003 Scope differs by code/WD | $28.78 | $16.05 | $44.83 |
| ELECTRICIAN Building ELEC0350-004 Scope differs by code/WD | $37.60 | $22.14 | $59.75 |
| ELECTRICIAN Building ELEC0545-005 Scope differs by code/WD | $43.20 | $21.50 | $64.70 |
| FORM WORKER Building SUMO2010-027 | $26.44 | 0.00 | $26.44 |
| GLAZIER Building SUMO2010-027 | $14.19 | $5.19 | $19.38 |
| IRONWORKER, REINFORCING AND STRUCTURAL Building IRON0010-026 Scope differs by code/WD | $39.00 | $34.25 | $73.25 |
| IRONWORKER, REINFORCING AND STRUCTURAL Building IRON0577-012 Scope differs by code/WD | $36.30 | $25.80 | $62.10 |
| LABORER Brick Mason Tender Building LABO0579-001 Scope differs by code/WD | $32.51 | $15.75 | $48.26 |
| LABORER Brick Mason Tender Building LABO0955-003 Scope differs by code/WD | $30.78 | $16.05 | $46.83 |
| Mechanical Contracts including all piping and temperature control work over $7.0 million Building PLUM0562-013 Scope differs by code/WD | $50.60 | $30.13 | $80.73 |
| Mechanical Contracts including all piping and temperature control work over $7.0 million Building PLUM0562-013 Scope differs by code/WD | $46.66 | $21.99 | $68.65 |
| OPERATOR: Backhoe/Trackhoe Building SUMO2010-027 | $31.12 | 0.00 | $31.12 |
| PAINTER Brush & Roller Only Building PAIN1185-001 Scope differs by code/WD | $28.56 | $17.21 | $45.77 |
| PAINTER Brush & Roller Only Building PAIN2012-005 Scope differs by code/WD | $36.18 | $19.97 | $56.15 |
| PAINTER: Spray Building SUMO2010-027 | $18.79 | $8.12 | $26.91 |
| PIPEFITTER, Includes HVAC Pipe Installation Building PLUM0045-004 | $49.45 | $26.65 | $76.10 |
| PIPEFITTER, Includes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & under Building PLUM0562-013 | $48.66 | $22.79 | $71.45 |
| PLUMBER, Excludes HVAC Pipe Installation Building PLUM0045-004 | $49.45 | $26.65 | $76.10 |
| PLUMBER, Excludes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & under Building PLUM0562-013 | $46.66 | $21.99 | $68.65 |
| POWER EQUIPMENT OPERATOR: Bulldozer Building ENGI0101-011 Scope differs by code/WD | $36.93 | $20.10 | $57.03 |
| POWER EQUIPMENT OPERATOR: Bulldozer Building ENGI0513-011 Scope differs by code/WD | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Building ENGI0101-011 Scope differs by code/WD | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Building ENGI0513-011 Scope differs by code/WD | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: Loader Building ENGI0101-011 Scope differs by code/WD | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: Loader Building ENGI0513-011 Scope differs by code/WD | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: Paver Building ENGI0101-011 Scope differs by code/WD | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: Paver Building ENGI0513-011 Scope differs by code/WD | $39.06 | $30.38 | $69.44 |
| POWER EQUIPMENT OPERATOR: Roller Building ENGI0101-011 Scope differs by code/WD | $45.48 | $22.42 | $67.90 |
| POWER EQUIPMENT OPERATOR: Roller Building ENGI0513-011 Scope differs by code/WD | $39.06 | $30.38 | $69.44 |
| ROOFER Building ROOF0020-022 Scope differs by code/WD | $34.50 | $19.74 | $54.24 |
| ROOFER Building ROOF0020-028 Scope differs by code/WD | $33.60 | $19.99 | $53.59 |
| SHEET METAL WORKER, Includes HVAC Duct and Unit Installation Building SHEE0002-015 Scope differs by code/WD | $47.20 | $26.28 | $73.48 |
| SHEET METAL WORKER, Includes HVAC Duct and Unit Installation Building SHEE0036-022 Scope differs by code/WD | $36.51 | $22.39 | $58.90 |
| TILE SETTER Building BRMO0003-006 Scope differs by code/WD | $40.53 | $15.99 | $56.52 |
| TILE SETTER Building BRMO0011-007 Scope differs by code/WD | $32.79 | $21.31 | $54.10 |
| TRUCK DRIVER: Dump Truck Building SUMO2010-027 | $28.92 | 0.00 | $28.92 |
No trade rates match your search and filter selection.
Building
Applies to
Adair, Atchison in Missouri.