Audrain County in Missouri.

1 wage determination 29 trade rates

Popular Trades In Audrain County in Missouri.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0001-005
$43.48 $27.24 $70.72
BRICKLAYER Building
BRMO0011-001
$32.79 $21.31 $54.10
CARPENTER, Excludes Form Work Building
CARP0010-004
$31.51 $22.25 $53.76
CARPENTER, Excludes Form Work Projects $1 million and over Building
CARP0002-010
$41.30 $21.85 $63.15
CEMENT MASON/CONCRETE FINISHER Building
SUMO2010-001
$18.86 $7.50 $26.36
Common or General & Landscape Building
LABO0955-001
$28.78 $16.05 $44.83
ELECTRICIAN Building
ELEC0257-005 Scope differs by code/WD
$40.50 $23.26 $63.76
ELECTRICIAN Building
ELEC0350-003 Scope differs by code/WD
$37.60 $22.14 $59.75
FORM WORKER Building
SUMO2010-001
$26.44 0.00 $26.44
GLAZIER Building
SUMO2010-001
$14.19 $5.19 $19.38
IRONWORKER, REINFORCING AND STRUCTURAL Building
IRON0396-012
$41.67 $31.25 $72.92
LABORER Brick Mason Tender Building
LABO0955-001
$30.78 $16.05 $46.83
On any work under 7.0 million Total of all Project Mechanical Contracts Outstate Area Wages and Fringes Building
PLUM0562-011 Scope differs by code/WD
$50.66 $23.34 $74.00
On any work under 7.0 million Total of all Project Mechanical Contracts Outstate Area Wages and Fringes Building
PLUM0562-011 Scope differs by code/WD
$50.66 $23.34 $74.00
OPERATOR: Backhoe/Trackhoe Building
SUMO2010-001
$31.12 0.00 $31.12
PAINTER Brush & Roller Only Building
PAIN1185-002
$28.56 $17.21 $45.77
PAINTER: Spray Building
SUMO2010-001
$18.79 $8.12 $26.91
PIPEFITTER, Includes HVAC Pipe Installation On any work over $7.0 million Total of all Project Mechanical Contracts St. Louis Area Wages and Fringes Building
PLUM0562-011
$52.60 $29.93 $82.53
PLUMBER, Excludes HVAC Pipe Installation On any work over $7.0 million Total of all Project Mechanical Contracts St. Louis Area Wages and Fringes Building
PLUM0562-011
$52.60 $29.93 $82.53
POWER EQUIPMENT OPERATOR: Bulldozer Building
ENGI0513-009
$39.06 $30.38 $69.44
POWER EQUIPMENT OPERATOR: Grader/Blade Building
ENGI0513-009
$39.06 $30.38 $69.44
POWER EQUIPMENT OPERATOR: Loader Building
ENGI0513-009
$39.06 $30.38 $69.44
POWER EQUIPMENT OPERATOR: Paver Building
ENGI0513-009
$39.06 $30.38 $69.44
POWER EQUIPMENT OPERATOR: Roller Building
ENGI0513-009
$39.06 $30.38 $69.44
Projects under $1 million Building
CARP0002-010
$39.53 $21.85 $61.38
ROOFER Building
ROOF0020-012
$33.60 $19.99 $53.59
SHEET METAL WORKER, Includes HVAC Duct and Unit Installation Building
SHEE0036-021
$36.51 $22.39 $58.90
TILE SETTER Building
BRMO0011-001
$32.79 $21.31 $54.10
TRUCK DRIVER: Dump Truck Building
SUMO2010-001
$28.92 0.00 $28.92

Wage Determinations