MO20260056
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0027-001 | $46.00 | $36.25 | $82.25 |
| BRICKLAYER Building BRMO0001-008 | $41.15 | $23.90 | $65.05 |
| CARPENTER Building CARP0012-001 (Including Drywall Hanging & Form Work) | $44.19 | $21.85 | $66.04 |
| CARPENTER Building CARP1310-001 (Floor Laying-Carpet and Vinyl Only) | $40.08 | $21.85 | $61.93 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0527-009 | $36.63 | $9.85 | $46.48 |
| Common or General; Asphalt Shoveler; Pipelayer Building LABO0840-006 | $30.33 | $15.30 | $45.63 |
| Drywall Finishing/Taping Building PAIN1185-009 | $34.90 | $17.21 | $52.11 |
| ELECTRICIAN Building ELEC0257-002 (Including Low Voltage Wiring Installer; Alarm, Computer & Telephone Installation) | $40.50 | $23.26 | $63.76 |
| ELEVATOR MECHANIC Building ELEV0003-001 | $62.73 | $38.44 | $101.16 |
| GLAZIER Building PAIN0513-001 | $40.00 | $24.25 | $64.25 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL Building IRON0396-007 | $41.67 | $31.25 | $72.92 |
| LABORER Brick & Cement/Concrete Mason Tender Building LABO0840-006 | $32.23 | $15.30 | $47.53 |
| Mechanical Contracts including all piping and temperature control work over $7.0 million Building PLUM0562-008 Scope differs by code/WD | $50.60 | $30.13 | $80.73 |
| Mechanical Contracts including all piping and temperature control work over $7.0 million Building PLUM0562-008 Scope differs by code/WD | $50.60 | $30.13 | $80.73 |
| OPERATOR: Hoist Building SUMO2023-001 | $26.02 | $13.01 | $39.03 |
| PAINTER Brush and Roller Building PAIN1185-009 | $33.90 | $17.21 | $51.11 |
| PAINTER: Spray Building SUMO2023-001 | $17.78 | 0.00 | $17.78 |
| PIPEFITTER, Includes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & under Building PLUM0562-008 | $48.66 | $22.79 | $71.45 |
| PLUMBER, Excludes HVAC Pipe Installation Mechanical Contracts including all piping and temperature control work $7.0 million & under Building PLUM0562-008 | $48.66 | $22.79 | $71.45 |
| Power equipment operators: Backhoe/Excavator Building ENGI0513-005 | $39.06 | $30.38 | $69.44 |
| Power equipment operators: Bobcat/Skid Loader Building ENGI0513-005 | $39.06 | $30.38 | $69.44 |
| Power equipment operators: Crane Building ENGI0513-005 | $39.06 | $30.38 | $69.44 |
| Power equipment operators: Forklift Building ENGI0513-005 | $39.06 | $30.38 | $69.44 |
| Power equipment operators: Grader/Blade Building ENGI0513-005 | $39.06 | $30.38 | $69.44 |
| Power equipment operators: Loader Building ENGI0513-005 | $39.06 | $30.38 | $69.44 |
| Power equipment operators: Paver Building ENGI0513-005 | $39.06 | $30.38 | $69.44 |
| Power equipment operators: Roller Building ENGI0513-005 | $39.06 | $30.38 | $69.44 |
| ROOFER Building ROOF0002-001 | $40.00 | $22.05 | $62.05 |
| SHEET METAL WORKER, Includes HVAC Duct and Unit Installation Building SHEE0036-001 | $52.00 | $27.12 | $79.12 |
| SPRINKLER FITTER Building SFMO0669-004 (Fire Sprinklers) | $45.94 | $27.52 | $73.46 |
| TILE FINISHER Building BRMO0018-007 | $28.50 | $18.15 | $46.65 |
| TILE SETTER Building BRMO0018-007 | $34.09 | $19.91 | $54.00 |