| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| (8) Crane Building ENGI0953-007 | $31.43 | $4.65 | $36.08 |
| BOILERMAKER Building SUNM2010-004 | $21.77 | $3.98 | $25.75 |
| BRICKLAYER Building SUNM2010-004 | $20.36 | $5.74 | $26.10 |
| CARPENTER Heavy SUNM2009-001 | $22.26 | $6.20 | $28.46 |
| CARPENTER Building SUNM2010-004 (Acoustical Ceiling Installation Only) | $20.79 | 0.00 | $20.79 |
| CARPENTER (Form Work Only) Building SUNM2010-004 | $19.79 | $6.14 | $25.93 |
| CARPENTER Metal Stud Installation Only Building CARP1319-008 | $29.09 | $16.20 | $45.29 |
| CARPENTER, Excludes Acoustical Ceiling Installation, Batt Insulation, Drywall Hanging, Form Work, and Metal Stud Installation Building SUNM2010-004 | $20.86 | $0.35 | $21.21 |
| CEMENT MASON/CONCRETE FINISHER Building SUNM2010-004 | $17.72 | $3.72 | $21.44 |
| DRYWALL FINISHER/TAPER Building SUNM2010-004 | $19.64 | $2.75 | $22.39 |
| DRYWALL HANGER Building SUNM2010-004 | $21.38 | $5.35 | $26.73 |
| ELECTRICIAN Building SUNM2010-004 (Low Voltage Wiring for Alarms) | $28.25 | $6.62 | $34.87 |
| ELECTRICIAN Excluding Low Voltage Wiring for Alarms Zone 1 Building ELEC0611-020 | $40.30 | $13.41 | $53.71 |
| ELECTRICIAN Zone 1 Heavy ELEC0611-010 | $40.30 | $13.41 | $53.71 |
| FLOOR LAYER: Carpet Building SUNM2010-004 | $22.31 | $0.30 | $22.61 |
| GLAZIER Building SUNM2010-004 | $20.15 | $3.95 | $24.10 |
| INSULATOR - BATT Building SUNM2010-004 | $24.44 | $8.43 | $32.87 |
| IRONWORKER Structural Heavy IRON0495-004 | $28.05 | $18.11 | $46.16 |
| IRONWORKER, ORNAMENTAL Building IRON0495-009 | $28.05 | $18.11 | $46.16 |
| IRONWORKER, REINFORCING Heavy SUNM2009-001 | $22.75 | $9.60 | $32.35 |
| IRONWORKER, REINFORCING Building SUNM2010-004 | $20.84 | $7.68 | $28.52 |
| IRONWORKER, STRUCTURAL Building IRON0495-009 (Metal Building Erection Only) | $28.05 | $18.11 | $46.16 |
| IRONWORKER, STRUCTURAL, Excludes Metal Building Erection Building SUNM2010-004 | $22.20 | $8.06 | $30.26 |
| LABORER: Common or General Heavy SUNM2009-001 | $12.37 | 0.00 | $12.37 |
| LABORER: Common or General Building SUNM2010-004 | $15.15 | $4.38 | $19.53 |
| LABORER: Flagger Heavy SUNM2009-001 | $10.90 | 0.00 | $10.90 |
| LABORER: Landscape & Irrigation Building SUNM2010-004 | $10.60 | $0.24 | $10.84 |
| LABORER: Mason Tender - Brick Building SUNM2010-004 | $13.77 | $4.35 | $18.12 |
| LABORER: Mason Tender - Cement/Concrete Building SUNM2010-004 | $11.51 | $0.85 | $12.36 |
| LABORER: Pipelayer Building SUNM2010-004 | $13.78 | $2.20 | $15.98 |
| OPERATOR: Backhoe Heavy SUNM2009-001 | $14.03 | 0.00 | $14.03 |
| OPERATOR: Backhoe Building SUNM2010-004 | $22.13 | $4.30 | $26.43 |
| OPERATOR: Forklift Building SUNM2010-004 | $21.13 | $4.83 | $25.96 |
| OPERATOR: Grader/Blade Heavy SUNM2009-001 | $22.36 | $5.27 | $27.63 |
| OPERATOR: Grader/Blade Building SUNM2010-004 | $22.04 | $4.70 | $26.74 |
| OPERATOR: Loader (Front End) Heavy SUNM2009-001 | $22.69 | $3.74 | $26.43 |
| OPERATOR: Scraper Heavy SUNM2009-001 | $14.03 | 0.00 | $14.03 |
| PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping Building SUNM2010-004 | $16.58 | $1.75 | $18.33 |
| PIPEFITTER Heavy SUNM2009-001 | $25.64 | $11.31 | $36.95 |
| PIPEFITTER Building PLUM0412-007 (Including HVAC Pipe Installation) | $43.07 | $16.60 | $59.67 |
| PLASTERER Building SUNM2010-004 | $17.65 | $7.15 | $24.80 |
| PLUMBER Heavy SUNM2009-001 | $26.27 | $7.69 | $33.96 |
| PLUMBER Building PLUM0412-007 (Excluding HVAC Pipe Installation) | $43.07 | $16.60 | $59.67 |
| Power Equipment Operator Building ENGI0953-007 (2) Roller(Dirt and Grade Compaction) | $26.75 | $4.65 | $31.40 |
| ROOFER Building SUNM2010-004 | $13.24 | $0.50 | $13.74 |
| Sheet Metal Worker Building SHEE0049-012 (HVAC Duct and System Installation Only) | $37.50 | $18.51 | $56.01 |
| SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building SUNM2010-004 | $22.01 | $9.65 | $31.66 |
| TILE FINISHER Building SUNM2010-004 | $14.02 | 0.00 | $14.02 |
| TILE SETTER Building SUNM2010-004 | $19.00 | 0.00 | $19.00 |
| TRUCK DRIVER: Dump Truck Heavy SUNM2009-001 | $11.90 | 0.00 | $11.90 |
| TRUCK DRIVER: Dump Truck Building SUNM2010-004 | $16.14 | $5.48 | $21.62 |
| TRUCK DRIVER: Pickup Truck Building SUNM2010-004 | $15.91 | $3.13 | $19.04 |
| TRUCK DRIVER: Water Truck Heavy SUNM2009-001 | $13.72 | $5.25 | $18.97 |
| TRUCK DRIVER: Water Truck Building SUNM2010-004 | $16.25 | $5.00 | $21.25 |