| TRUCK DRIVER: WATER TRUCK | 13.13 | 0.26 | 13.39 |
| TRUCK DRIVER: PICKUP AND PILOT CAR | 12.74 | 0.26 | 13.00 |
| TRUCK DRIVER: FLATBED TRUCK (RIO ARRIBA) | 12.95 | 0.26 | 13.21 |
| TRUCK DRIVER: FLATBED TRUCK (QUAY, SAN MIGUEL) | 13.30 | 0.26 | 13.56 |
| TRUCK DRIVER: FLATBED TRUCK (MCKINLEY) | 13.55 | 0.26 | 13.81 |
| TRUCK DRIVER: FLATBED TRUCK | 13.27 | 0.26 | 13.53 |
| TRUCK DRIVER: FLATBED TRUCK (CIBOLA) | 12.71 | 0.26 | 12.97 |
| TRUCK DRIVER: DUMP TRUCK (QUAY) | 15.20 | 0.26 | 15.46 |
| TRUCK DRIVER: DUMP TRUCK (MCKINLEY) | 13.15 | 0.26 | 13.41 |
| TRUCK DRIVER: DUMP TRUCK (COLFAX, SAN MIGUEL) | 13.24 | 0.26 | 13.50 |
| TRUCK DRIVER: DUMP TRUCK | 14.75 | 0.26 | 15.01 |
| TRUCK DRIVER: DISTRIBUTOR | 13.56 | 0.26 | 13.82 |
| TRUCK DRIVER (TRACTOR HAUL TRUCK) | 14.00 | 0.00 | 14.00 |
| TRUCK DRIVER (SEMI-TRAILER TRUCK) | 16.58 | 0.26 | 16.84 |
| POWER EQUIPMENT OPERATOR: TRACTOR | 16.84 | 0.26 | 17.10 |
| POWER EQUIPMENT OPERATOR: SCREED | 15.96 | 0.26 | 16.22 |
| POWER EQUIPMENT OPERATOR: SCRAPER | 15.91 | 0.26 | 16.17 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | 15.80 | 0.26 | 16.06 |
| POWER EQUIPMENT OPERATOR: ROLLER | 14.74 | 0.26 | 15.00 |
| POWER EQUIPMENT OPERATOR: ROLLER | 16.49 | 0.26 | 16.75 |
| POWER EQUIPMENT OPERATOR: ROLLER | 14.39 | 0.98 | 15.37 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (QUAY) | 15.99 | 0.26 | 16.25 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (MCKINLEY) | 14.95 | 0.26 | 15.21 |
| POWER EQUIPMENT OPERATOR: PILEDRIVER | 15.87 | 0.26 | 16.13 |
| POWER EQUIPMENT OPERATOR: OILER | 14.29 | 0.26 | 14.55 |
| POWER EQUIPMENT OPERATOR: MECHANIC | 17.48 | 0.26 | 17.74 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (QUAY… | 16.10 | 0.26 | 16.36 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MORA… | 16.21 | 0.26 | 16.47 |
| POWER EQUIPMENT OPERATOR: LOADER | 16.13 | 0.26 | 16.39 |
| POWER EQUIPMENT OPERATOR: LOADER | 19.37 | 0.26 | 19.63 |
| POWER EQUIPMENT OPERATOR: LOADER | 15.72 | 0.26 | 15.98 |
| POWER EQUIPMENT OPERATOR: LOADER | 16.27 | 0.26 | 16.53 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (QUAY) | 19.50 | 0.26 | 19.76 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 17.48 | 0.26 | 17.74 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 17.16 | 0.26 | 17.42 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (QUAY) | 14.89 | 0.26 | 15.15 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 14.97 | 0.26 | 15.23 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | 18.06 | 0.26 | 18.32 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKH… | 16.27 | 0.26 | 16.53 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKH… | 16.70 | 0.26 | 16.96 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKH… | 20.74 | 0.26 | 21.00 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKH… | 16.80 | 0.26 | 17.06 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR… | 16.26 | 0.26 | 16.52 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR… | 16.89 | 0.26 | 17.15 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR… | 14.50 | 0.26 | 14.76 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR… | 16.53 | 0.26 | 16.79 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR… | 15.72 | 0.26 | 15.98 |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR… | 16.43 | 1.51 | 17.94 |
| POWER EQUIPMENT OPERATOR: PAINTER, BRUSH, ROLLER A… | 14.15 | 0.44 | 14.59 |
| POWER EQUIPMENT OPERATOR: PAINTER, BRUSH, ROLLER A… | 15.06 | 0.44 | 15.50 |
| POWER EQUIPMENT OPERATOR: LABORER: PIPELAYER | 16.99 | 0.35 | 17.34 |
| POWER EQUIPMENT OPERATOR: LABORER: ASPHALT RAKER | 14.39 | 0.35 | 14.74 |
| POWER EQUIPMENT OPERATOR: LABORER, MASONTENDER-BRI… | 13.33 | 1.97 | 15.30 |
| POWER EQUIPMENT OPERATOR: LABORER, MASONTENDER-BRI… | 13.04 | 1.78 | 14.82 |
| POWER EQUIPMENT OPERATOR: LABORER, FLAGGER/CONE SE… | 12.21 | 0.26 | 12.47 |
| POWER EQUIPMENT OPERATOR: LABORER, FLAGGER/CONE SE… | 11.66 | 0.35 | 12.01 |
| POWER EQUIPMENT OPERATOR: LABORER, FLAGGER/CONE SE… | 12.15 | 0.99 | 13.14 |
| POWER EQUIPMENT OPERATOR: LABORER, FLAGGER/CONE SE… | 13.14 | 0.35 | 13.49 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 10.89 | 0.35 | 11.24 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 12.61 | 0.35 | 12.96 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 12.56 | 0.35 | 12.91 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 12.28 | 0.35 | 12.63 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 12.15 | 0.35 | 12.50 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 11.34 | 0.35 | 11.69 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 11.22 | 0.35 | 11.57 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 11.57 | 0.35 | 11.92 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 11.83 | 0.35 | 12.18 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 9.60 | 0.35 | 9.95 |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENER… | 12.27 | 0.35 | 12.62 |
| POWER EQUIPMENT OPERATOR: LABORER (GRADE CHECKER) | 14.67 | 1.60 | 16.27 |
| POWER EQUIPMENT OPERATOR: IRONWORKER, STRUCTURAL | 21.77 | 6.03 | 27.80 |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING … | 21.98 | 6.03 | 28.01 |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING … | 22.44 | 5.85 | 28.29 |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING | 21.57 | 4.80 | 26.37 |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING … | 23.05 | 1.54 | 24.59 |
| POWER EQUIPMENT OPERATOR: INSTALLER: | 12.00 | 0.35 | 12.35 |
| POWER EQUIPMENT OPERATOR: INSTALLER: | 12.37 | 0.35 | 12.72 |
| POWER EQUIPMENT OPERATOR: INSTALLER: | 11.68 | 0.35 | 12.03 |
| POWER EQUIPMENT OPERATOR: INSTALLER: | 12.35 | 0.35 | 12.70 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRI… | 15.31 | 0.35 | 15.66 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRI… | 16.37 | 0.26 | 16.63 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRI… | 14.55 | 0.35 | 14.90 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRI… | 15.16 | 0.35 | 15.51 |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRI… | 13.66 | 0.35 | 14.01 |
| POWER EQUIPMENT OPERATOR: ELECTRICIAN (INCLUDING T… | 24.66 | 8.56 | 33.22 |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FI… | 14.98 | 0.26 | 15.24 |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FI… | 15.58 | 1.54 | 17.12 |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FI… | 15.07 | 0.26 | 15.33 |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FI… | 15.58 | 0.26 | 15.84 |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM… | 13.93 | 0.44 | 14.37 |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM… | 14.44 | 0.44 | 14.88 |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM… | 13.51 | 0.44 | 13.95 |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM… | 13.84 | 0.44 | 14.28 |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM… | 14.27 | 0.44 | 14.71 |