NM20260004
rev 1Residential
Applies to
Cibola, Colfax, Guadalupe, Harding, McKinley, Mora, Quay, Rio Arriba, San Juan, San Miguel +3 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Union County, New Mexico are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ACOUSTICAL CEILING MECHANIC Building SUNM2010-018 | $12.00 | 0.00 | $12.00 | |
| BOILERMAKER Building SUNM2010-018 | $21.77 | $3.98 | $25.75 | |
| BRICKLAYER Building SUNM2010-018 | $20.80 | $5.10 | $25.90 | |
| CARPENTER Residential SUNM1999-003 (EXCLUDING INSTALLATION OF SOFT FLOORS AND BATT AND BLOWN INSULATION) | $10.85 | $0.30 | $11.15 | |
| CARPENTER Heavy SUNM2009-005 | $22.26 | $6.20 | $28.46 | |
| CARPENTER (BATT INSULATION ONLY) Building SUNM2010-018 | $26.07 | $5.96 | $32.03 | |
| CARPENTER (DRYWALL HANGING ONLY) Building CARP1353-006 | $24.08 | $10.79 | $34.87 | |
| CARPENTER (FORM WORK ONLY) Building SUNM2010-018 | $18.80 | $5.61 | $24.41 | |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK Building SUNM2010-018 | $19.27 | $4.29 | $23.56 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUNM1999-003 | $10.91 | 0.00 | $10.91 | |
| CEMENT MASON/CONCRETE FINISHER Building SUNM2010-018 | $17.61 | $4.63 | $22.24 | |
| DRYWALL FINISHER/TAPER Residential SUNM1999-003 | $8.00 | 0.00 | $8.00 | |
| DRYWALL FINISHER/TAPER Building SUNM2010-018 | $18.34 | $4.38 | $22.72 | |
| ELECTRICIAN Residential SUNM1999-003 | $12.00 | $0.23 | $12.23 | |
| ELECTRICIAN (LOS ALAMOS COUNTY) Heavy ELEC0611-013 | $46.35 | $13.65 | $60.00 | |
| ELECTRICIAN, ZONE 1 Heavy ELEC0611-011 (CIBOLA, COLFAX, GUADALUPE, HARDING, MCKINLEY, MORA, QUAY, RIO ARRIBA, SAN MIGUEL, AND UNION COUNTIES). ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 | |
| FLOOR LAYER: CARPET Residential SUNM1999-003 | $10.00 | 0.00 | $10.00 | |
| FLOOR LAYER: CARPET Building SUNM2010-018 | $18.05 | $4.49 | $22.54 | |
| FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ELECTRICIAN Building ELEC0611-019 (ZONE 1). ZONE 1: MILEAGE CALCULATED ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE | $40.30 | $13.41 | $53.71 | |
| GLAZIER Building SUNM2010-018 | $20.15 | $3.63 | $23.78 | |
| IRONWORKER, REINFORCING Building SUNM2010-018 | $19.75 | $8.71 | $28.46 | |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL Building IRON0495-010 | $28.05 | $18.11 | $46.16 | |
| IRONWORKER: STRUCTURAL AND REINFORCING Heavy IRON0495-003 | $28.05 | $18.11 | $46.16 | |
| LABORER, MASON TENDER BRICK Building LABO0016-005 | $23.69 | $7.89 | $31.58 | |
| LABORER, UNSKILLED Residential SUNM1999-003 | $8.13 | 0.00 | $8.13 | |
| LABORER: ASPHALT RAKER Building SUNM2010-018 | $10.25 | 0.00 | $10.25 | |
| LABORER: COMMON OR GENERAL Heavy SUNM2009-005 | $13.26 | $0.35 | $13.61 | |
| LABORER: COMMON OR GENERAL Building SUNM2010-018 | $12.99 | $3.56 | $16.55 | |
| LABORER: FLAGGER Heavy SUNM2009-005 | $10.90 | 0.00 | $10.90 | |
| LABORER: LANDSCAPE & IRRIGATION Building SUNM2010-018 | $12.42 | $1.47 | $13.89 | |
| LABORER: MASON TENDER - CEMENT/CONCRETE Building SUNM2010-018 | $11.51 | $0.85 | $12.36 | |
| LABORER: PIPELAYER Building SUNM2010-018 | $13.78 | $2.20 | $15.98 | |
| OPERATOR: BACKHOE Heavy SUNM2009-005 | $17.00 | 0.00 | $17.00 | |
| OPERATOR: BACKHOE Building SUNM2010-018 | $18.79 | $3.47 | $22.26 | |
| OPERATOR: CRANE Building SUNM2010-018 | $24.38 | $4.60 | $28.98 | |
| OPERATOR: FORKLIFT Building SUNM2010-018 | $20.86 | $4.60 | $25.46 | |
| OPERATOR: GRADER/BLADE Heavy SUNM2009-005 | $18.79 | $2.35 | $21.14 | |
| OPERATOR: GRADER/BLADE Building SUNM2010-018 | $20.33 | $4.94 | $25.27 | |
| OPERATOR: LOADER (FRONT END) Heavy SUNM2009-005 | $17.43 | $0.26 | $17.69 | |
| OPERATOR: LOADER (FRONT END) Building SUNM2010-018 | $19.76 | $4.84 | $24.60 | |
| OPERATOR: SCRAPER Heavy SUNM2009-005 | $14.03 | 0.00 | $14.03 | |
| PAINTER (EXCLUDING DRYWALL FINISHING) Residential SUNM1999-003 | $9.00 | 0.00 | $9.00 | |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING Building PAIN0823-007 | $24.00 | $7.00 | $31.00 | |
| PAINTER: SPRAY (EXCLUDES DRYWALL FINISHING/TAPING) Building SUNM2010-018 | $15.47 | $2.09 | $17.56 | |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION Building PLUM0412-007 | $43.07 | $16.60 | $59.67 | |
| PLASTERER Building SUNM2010-018 | $17.65 | $5.29 | $22.94 | |
| PLUMBER Heavy SUNM2009-005 | $26.27 | $7.69 | $33.96 | |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) Building PLUM0412-007 | $43.07 | $16.60 | $59.67 | |
| PLUMBER (INCLUDING HVAC WORK) Residential SUNM1999-003 | $16.07 | $0.65 | $16.72 | |
| POWER EQUIPMENT OPERATOR Building ENGI0953-013 ((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | $4.65 | $31.40 | |
| POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER) Building ENGI0953-013 | $27.24 | $4.65 | $31.89 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE Highway SUNM2011-005 (CIBOLA, COLFAX, GUADALUPE, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $16.80 | $0.26 | $17.06 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (HARDING) Highway SUNM2011-005 | $20.74 | $0.26 | $21.00 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (MCKINLEY) Highway SUNM2011-005 | $16.70 | $0.26 | $16.96 | |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (QUAY) Highway SUNM2011-005 | $16.27 | $0.26 | $16.53 | |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER Highway SUNM2011-005 | $18.06 | $0.26 | $18.32 | |
| POWER EQUIPMENT OPERATOR: BULLDOZER Highway SUNM2011-005 (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $14.97 | $0.26 | $15.23 | |
| POWER EQUIPMENT OPERATOR: BULLDOZER (QUAY) Highway SUNM2011-005 | $14.89 | $0.26 | $15.15 | |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM WORK Highway SUNM2011-005 (GUADALUPE, LOS ALAMOS, COLFAX, HARDING, GUAY, TAOS, UNION) | $13.84 | $0.44 | $14.28 | |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM WORK (CIBOLA, RIA ARRIBA) Highway SUNM2011-005 | $14.27 | $0.44 | $14.71 | |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM WORK (MCKINLEY) Highway SUNM2011-005 | $13.51 | $0.44 | $13.95 | |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM WORK (MORA) Highway SUNM2011-005 | $14.44 | $0.44 | $14.88 | |
| POWER EQUIPMENT OPERATOR: CARPENTER, INCLUDES FORM WORK (SAN MIGUEL) Highway SUNM2011-005 | $13.93 | $0.44 | $14.37 | |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER Highway SUNM2011-005 (RIO ARRIBA, SAN MIGUEL) | $15.58 | $1.54 | $17.12 | |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER Highway SUNM2011-005 (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, UNION) | $15.07 | $0.26 | $15.33 | |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER (CIBOLA) Highway SUNM2011-005 | $15.58 | $0.26 | $15.84 | |
| POWER EQUIPMENT OPERATOR: CEMENT MASON/CONCRETE FINISHER (TAOS) Highway SUNM2011-005 | $14.98 | $0.26 | $15.24 | |
| POWER EQUIPMENT OPERATOR: ELECTRICIAN (INCLUDING TRAFFIC SIGNAL INSTALLATION) Highway SUNM2011-005 | $24.66 | $8.56 | $33.22 | |
| POWER EQUIPMENT OPERATOR: FORKLIFT Highway SUNM2011-005 | $17.16 | $0.26 | $17.42 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE Highway SUNM2011-005 (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $17.48 | $0.26 | $17.74 | |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (QUAY) Highway SUNM2011-005 | $19.50 | $0.26 | $19.76 | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER Highway SUNM2011-005 (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, TAOS, UNION) | $15.16 | $0.35 | $15.51 | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (CIBOLA) Highway SUNM2011-005 | $13.66 | $0.35 | $14.01 | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (MCKINLEY) Highway SUNM2011-005 | $14.55 | $0.35 | $14.90 | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (QUAY) Highway SUNM2011-005 | $16.37 | $0.26 | $16.63 | |
| POWER EQUIPMENT OPERATOR: HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER (SAN MIGUEL) Highway SUNM2011-005 | $15.31 | $0.35 | $15.66 | |
| POWER EQUIPMENT OPERATOR: INSTALLER: Highway SUNM2011-005 (GUARDRAILS, HANDRAILS AND SIGNS) (QUAY) | $12.00 | $0.35 | $12.35 | |
| POWER EQUIPMENT OPERATOR: INSTALLER: Highway SUNM2011-005 (GUARDRAILS, HANDRAILS AND SIGNS) (GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $12.37 | $0.35 | $12.72 | |
| POWER EQUIPMENT OPERATOR: INSTALLER: Highway SUNM2011-005 (GUARDRAILS, HANDRAILS AND SIGNS) (COLFAX) | $11.68 | $0.35 | $12.03 | |
| POWER EQUIPMENT OPERATOR: INSTALLER: Highway SUNM2011-005 (GUARDRAILS, HANDRAILS AND SIGNS) (CIBOLA) | $12.35 | $0.35 | $12.70 | |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING Highway SUNM2011-005 (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | $21.57 | $4.80 | $26.37 | |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING (CIBOLA) Highway SUNM2011-005 | $23.05 | $1.54 | $24.59 | |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING (MCKINLEY) Highway SUNM2011-005 | $22.44 | $5.85 | $28.29 | |
| POWER EQUIPMENT OPERATOR: IRONWORKER, REINFORCING (RIO ARRIBA) Highway SUNM2011-005 | $21.98 | $6.03 | $28.01 | |
| POWER EQUIPMENT OPERATOR: IRONWORKER, STRUCTURAL Highway SUNM2011-005 | $21.77 | $6.03 | $27.80 | |
| POWER EQUIPMENT OPERATOR: LABORER (GRADE CHECKER) Highway SUNM2011-005 | $14.67 | $1.60 | $16.27 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (CIBOLA) Highway SUNM2011-005 | $12.27 | $0.35 | $12.62 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (COLFAX) Highway SUNM2011-005 | $9.60 | $0.35 | $9.95 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (GUADALUPE, LOS ALAMOS) Highway SUNM2011-005 | $11.83 | $0.35 | $12.18 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (HARDING) Highway SUNM2011-005 | $11.57 | $0.35 | $11.92 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (MCKINLEY) Highway SUNM2011-005 | $11.22 | $0.35 | $11.57 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (MORA) Highway SUNM2011-005 | $11.34 | $0.35 | $11.69 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (QUAY) Highway SUNM2011-005 | $12.15 | $0.35 | $12.50 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (RIO ARRIBA) Highway SUNM2011-005 | $12.28 | $0.35 | $12.63 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (SAN MIGUEL) Highway SUNM2011-005 | $12.56 | $0.35 | $12.91 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (TAOS) Highway SUNM2011-005 | $12.61 | $0.35 | $12.96 | |
| POWER EQUIPMENT OPERATOR: LABORER, COMMON OR GENERAL (UNION) Highway SUNM2011-005 | $10.89 | $0.35 | $11.24 | |
| POWER EQUIPMENT OPERATOR: LABORER, FLAGGER/CONE SETTER Highway SUNM2011-005 (COLFX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $12.15 | $0.99 | $13.14 | |
| POWER EQUIPMENT OPERATOR: LABORER, FLAGGER/CONE SETTER (CIBOLA) Highway SUNM2011-005 | $13.14 | $0.35 | $13.49 | |
| POWER EQUIPMENT OPERATOR: LABORER, FLAGGER/CONE SETTER (MCKINLEY) Highway SUNM2011-005 | $11.66 | $0.35 | $12.01 | |
| POWER EQUIPMENT OPERATOR: LABORER, FLAGGER/CONE SETTER (QUAY) Highway SUNM2011-005 | $12.21 | $0.26 | $12.47 | |
| POWER EQUIPMENT OPERATOR: LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE Highway SUNM2011-005 (RIO ARRIBA) | $13.33 | $1.97 | $15.30 | |
| POWER EQUIPMENT OPERATOR: LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE Highway SUNM2011-005 (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, SAN MIGUEL, TAOS, UNION) | $13.04 | $1.78 | $14.82 | |
| POWER EQUIPMENT OPERATOR: LABORER: ASPHALT RAKER Highway SUNM2011-005 | $14.39 | $0.35 | $14.74 | |
| POWER EQUIPMENT OPERATOR: LABORER: PIPELAYER Highway SUNM2011-005 | $16.99 | $0.35 | $17.34 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway SUNM2011-005 (FRONT END) (MCKINLEY) | $16.13 | $0.26 | $16.39 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway SUNM2011-005 (FRONT END) (HARDING) | $19.37 | $0.26 | $19.63 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway SUNM2011-005 (FRONT END) (COLFAX) | $15.72 | $0.26 | $15.98 | |
| POWER EQUIPMENT OPERATOR: LOADER Highway SUNM2011-005 (FRONT END) (CIBOLA, GUADALUPE, LOS ALAMOS, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $16.27 | $0.26 | $16.53 | |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (MORA) Highway SUNM2011-005 | $16.21 | $0.26 | $16.47 | |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (QUAY) Highway SUNM2011-005 | $16.10 | $0.26 | $16.36 | |
| POWER EQUIPMENT OPERATOR: MECHANIC Highway SUNM2011-005 | $17.48 | $0.26 | $17.74 | |
| POWER EQUIPMENT OPERATOR: OILER Highway SUNM2011-005 | $14.29 | $0.26 | $14.55 | |
| POWER EQUIPMENT OPERATOR: PAINTER, BRUSH, ROLLER AND SPRAY Highway SUNM2011-005 (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, QUAY, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $15.06 | $0.44 | $15.50 | |
| POWER EQUIPMENT OPERATOR: PAINTER, BRUSH, ROLLER AND SPRAY (MCKINLEY) Highway SUNM2011-005 | $14.15 | $0.44 | $14.59 | |
| POWER EQUIPMENT OPERATOR: PILEDRIVER Highway SUNM2011-005 (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $15.87 | $0.26 | $16.13 | |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (MCKINLEY) Highway SUNM2011-005 | $14.95 | $0.26 | $15.21 | |
| POWER EQUIPMENT OPERATOR: PILEDRIVER (QUAY) Highway SUNM2011-005 | $15.99 | $0.26 | $16.25 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: Highway SUNM2011-005 (ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | $16.43 | $1.51 | $17.94 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (BROOM OPERATOR) Highway SUNM2011-005 | $15.72 | $0.26 | $15.98 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (CRUSHER) Highway SUNM2011-005 | $16.53 | $0.26 | $16.79 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (DISTRIBUTOR) Highway SUNM2011-005 | $14.50 | $0.26 | $14.76 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (MILLING MACHINE) Highway SUNM2011-005 | $16.89 | $0.26 | $17.15 | |
| POWER EQUIPMENT OPERATOR: POWER EQUIPMENT OPERATOR: (TRENCHER) Highway SUNM2011-005 | $16.26 | $0.26 | $16.52 | |
| POWER EQUIPMENT OPERATOR: ROLLER Highway SUNM2011-005 (ASPHALT AND DIRT) (QUAY) | $14.74 | $0.26 | $15.00 | |
| POWER EQUIPMENT OPERATOR: ROLLER Highway SUNM2011-005 (ASPHALT AND DIRT) (MCKINLEY) | $16.49 | $0.26 | $16.75 | |
| POWER EQUIPMENT OPERATOR: ROLLER Highway SUNM2011-005 (ASPHALT AND DIRT) (CIBOLA, COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MCKINLEY, MORA, RIO ARRIBA, SAN MIGUEL, TAOS, UNION) | $14.39 | $0.98 | $15.37 | |
| POWER EQUIPMENT OPERATOR: ROTOMILL Highway SUNM2011-005 | $15.80 | $0.26 | $16.06 | |
| POWER EQUIPMENT OPERATOR: SCRAPER Highway SUNM2011-005 | $15.91 | $0.26 | $16.17 | |
| POWER EQUIPMENT OPERATOR: SCREED Highway SUNM2011-005 | $15.96 | $0.26 | $16.22 | |
| POWER EQUIPMENT OPERATOR: TRACTOR Highway SUNM2011-005 | $16.84 | $0.26 | $17.10 | |
| ROOFER Residential SUNM1999-003 | $9.87 | 0.00 | $9.87 | |
| ROOFER Building SUNM2010-018 | $18.84 | 0.00 | $18.84 | |
| SHEET METAL WORKER Residential SUNM1999-003 (SETTING OF HVAC UNIT AND DUCT WORK INSTALLATION ONLY) | $14.43 | $0.58 | $15.01 | |
| SHEET METAL WORKER Building SHEE0049-012 (HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 | $56.01 | |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION Building SUNM2010-018 | $22.01 | $9.65 | $31.66 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SUNM2010-018 | $20.00 | $4.16 | $24.16 | |
| TILE FINISHER Building SUNM2010-018 | $14.02 | 0.00 | $14.02 | |
| TILE SETTER Building SUNM2010-018 | $14.30 | $1.02 | $15.32 | |
| TRUCK DRIVER (SEMI-TRAILER TRUCK) Highway SUNM2011-005 | $16.58 | $0.26 | $16.84 | |
| TRUCK DRIVER (TRACTOR HAUL TRUCK) Highway SUNM2011-005 | $14.00 | 0.00 | $14.00 | |
| TRUCK DRIVER: DISTRIBUTOR Highway SUNM2011-005 | $13.56 | $0.26 | $13.82 | |
| TRUCK DRIVER: DUMP TRUCK Heavy SUNM2009-005 | $11.90 | 0.00 | $11.90 | |
| TRUCK DRIVER: DUMP TRUCK Building SUNM2010-018 | $11.00 | 0.00 | $11.00 | |
| TRUCK DRIVER: DUMP TRUCK Highway SUNM2011-005 (CIBOLA, GUADALUPE, HARDING, LOS ALAMOS, MORA, RIO ARRIBA, TAOS, UNION) | $14.75 | $0.26 | $15.01 | |
| TRUCK DRIVER: DUMP TRUCK (COLFAX, SAN MIGUEL) Highway SUNM2011-005 | $13.24 | $0.26 | $13.50 | |
| TRUCK DRIVER: DUMP TRUCK (MCKINLEY) Highway SUNM2011-005 | $13.15 | $0.26 | $13.41 | |
| TRUCK DRIVER: DUMP TRUCK (QUAY) Highway SUNM2011-005 | $15.20 | $0.26 | $15.46 | |
| TRUCK DRIVER: FLATBED TRUCK Highway SUNM2011-005 (COLFAX, GUADALUPE, HARDING, LOS ALAMOS, MORA, TAOS, UNION) | $13.27 | $0.26 | $13.53 | |
| TRUCK DRIVER: FLATBED TRUCK (CIBOLA) Highway SUNM2011-005 | $12.71 | $0.26 | $12.97 | |
| TRUCK DRIVER: FLATBED TRUCK (MCKINLEY) Highway SUNM2011-005 | $13.55 | $0.26 | $13.81 | |
| TRUCK DRIVER: FLATBED TRUCK (QUAY, SAN MIGUEL) Highway SUNM2011-005 | $13.30 | $0.26 | $13.56 | |
| TRUCK DRIVER: FLATBED TRUCK (RIO ARRIBA) Highway SUNM2011-005 | $12.95 | $0.26 | $13.21 | |
| TRUCK DRIVER: PICKUP AND PILOT CAR Highway SUNM2011-005 | $12.74 | $0.26 | $13.00 | |
| TRUCK DRIVER: PICKUP TRUCK Building SUNM2010-018 | $15.91 | $3.13 | $19.04 | |
| TRUCK DRIVER: WATER TRUCK Heavy SUNM2009-005 | $13.72 | $5.25 | $18.97 | |
| TRUCK DRIVER: WATER TRUCK Building SUNM2010-018 | $15.16 | $4.69 | $19.85 | |
| TRUCK DRIVER: WATER TRUCK Highway SUNM2011-005 | $13.13 | $0.26 | $13.39 |
No trade rates match your search and filter selection.
Residential
Applies to
Cibola, Colfax, Guadalupe, Harding, McKinley, Mora, Quay, Rio Arriba, San Juan, San Miguel +3 more
Heavy
Applies to
Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Quay, Rio Arriba, San Miguel +1 more
Building
Highway
Applies to
Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Quay, Rio Arriba, San Miguel +2 more