Harding

4 wage determinations 160 trade rates

Popular Trades In Harding

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
(4) Bobcat/Skid Loader Building
ENGI0953-008
$27.70 $4.65 $32.35
ACOUSTICAL CEILING MECHANIC Building
SUNM2010-019
$12.00 0.00 $12.00
BOILERMAKER Building
SUNM2010-019
$21.77 $3.98 $25.75
BRICKLAYER Building
SUNM2010-019
$20.80 $5.10 $25.90
CARPENTER Residential
SUNM1999-003 (excluding installation of soft floors and batt and blown insulation)
$10.85 $0.30 $11.15
CARPENTER Heavy
SUNM2009-005
$22.26 $6.20 $28.46
CARPENTER Building
SUNM2010-019 (Batt Insulation Only)
$26.07 $5.96 $32.03
CARPENTER Highway
SUNM2011-005 (Includes Form Work) Cibola, Ria Arriba
$14.27 $0.44 $14.71
CARPENTER (Form Work Only) Building
SUNM2010-019
$18.80 $5.61 $24.41
Carpenter Drywall Hanging Only Building
CARP1245-003
$24.08 $10.79 $34.87
CARPENTER Drywall Hanging Only Building
CARP1319-006 Scope differs by code/WD
$29.09 $16.20 $45.29
CARPENTER Drywall Hanging Only Building
CARP1353-008 Scope differs by code/WD
$24.08 $10.79 $34.87
CARPENTER, Excludes Acoustical Ceiling Installation, Batt Insulation, Drywall Hanging, and Form Work Building
SUNM2010-019
$19.27 $4.29 $23.56
CEMENT MASON/CONCRETE FINISHER Residential
SUNM1999-003
$10.91 $0.00 $10.91
CEMENT MASON/CONCRETE FINISHER Building
SUNM2010-019
$16.27 $3.94 $20.21
CEMENT MASON/CONCRETE FINISHER Cibola Highway
SUNM2011-005
$15.58 $0.26 $15.84
Colfax, Guadalupe, Harding, Los Alamos, McKinley, mora, Quay, Union Highway
SUNM2011-005
$15.07 $0.26 $15.33
DRYWALL FINISHER/TAPER Residential
SUNM1999-003
$8.00 $0.00 $8.00
DRYWALL FINISHER/TAPER Building
SUNM2010-019
$18.34 $4.38 $22.72
ELECTRICIAN Residential
SUNM1999-003
$12.00 $0.23 $12.23
ELECTRICIAN Heavy
ELEC0611-013
$46.35 $13.65 $60.00
ELECTRICIAN Highway
SUNM2011-005 (Including Traffic Signal Installation)
$24.66 $8.56 $33.22
ELECTRICIAN Zone 1 Heavy
ELEC0611-011
$40.30 $13.41 $53.71
ELECTRICIAN Zone 1 Building
ELEC0611-019
$40.30 $13.41 $53.71
FLOOR LAYER: Carpet Residential
SUNM1999-003
$10.00 $0.00 $10.00
FLOOR LAYER: Carpet Building
SUNM2010-019
$18.05 $4.49 $22.54
GLAZIER Building
SUNM2010-019
$20.15 $3.63 $23.78
Guadalupe, Los Alamos, Colfax, Harding, Guay, Taos, Union Highway
SUNM2011-005
$13.84 $0.44 $14.28
HIGHWAY/PARKING LOT STRIPING: Colfax Highway
SUNM2011-005 Scope differs by code/WD
$11.68 $0.35 $12.03
HIGHWAY/PARKING LOT STRIPING: Colfax Highway
SUNM2011-005 Scope differs by code/WD
$9.60 $0.35 $9.95
HIGHWAY/PARKING LOT STRIPING: Colfax, Guadalupe, Harding, Los Alamos, Mora, Quay, San Miguel, Taos, Union Highway
SUNM2011-005
$21.57 $4.80 $26.37
HIGHWAY/PARKING LOT STRIPING: Colfax, Guadalupe, Harding, Los Alamos, Mora, Rio Arriba, Taos, Union Highway
SUNM2011-005
$15.16 $0.35 $15.51
HIGHWAY/PARKING LOT STRIPING: Colfx, Guadalupe, Harding, Los Alamos, Mora, Rio Arriba, San Miguel, Taos, Union Highway
SUNM2011-005
$12.15 $0.99 $13.14
HIGHWAY/PARKING LOT STRIPING: Common or General Cibola Highway
SUNM2011-005
$12.27 $0.35 $12.62
HIGHWAY/PARKING LOT STRIPING: Flagger/Cone Setter Cibola Highway
SUNM2011-005
$13.14 $0.35 $13.49
HIGHWAY/PARKING LOT STRIPING: Grade Checker Highway
SUNM2011-005
$14.67 $1.60 $16.27
HIGHWAY/PARKING LOT STRIPING: Guadalupe, Harding, Los Alamos, McKinley, Mora, Rio Arriba, San Miguel, Taos, Union Highway
SUNM2011-005
$12.37 $0.35 $12.72
HIGHWAY/PARKING LOT STRIPING: Guadalupe, Los Alamos Highway
SUNM2011-005
$11.83 $0.35 $12.18
HIGHWAY/PARKING LOT STRIPING: Harding Highway
SUNM2011-005
$11.57 $0.35 $11.92
HIGHWAY/PARKING LOT STRIPING: Includes Highway Line/Parking Lot Line Striping and Line Striping Truck Driver Cibola Highway
SUNM2011-005
$13.66 $0.35 $14.01
HIGHWAY/PARKING LOT STRIPING: INSTALLER: Highway
SUNM2011-005 (Guardrails, Handrails and Signs) Cibola
$12.35 $0.35 $12.70
HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Cibola Highway
SUNM2011-005
$23.05 $1.54 $24.59
HIGHWAY/PARKING LOT STRIPING: IRONWORKER, STRUCTURAL Highway
SUNM2011-005
$21.77 $6.03 $27.80
HIGHWAY/PARKING LOT STRIPING: LABORER Asphalt Raker Highway
SUNM2011-005
$14.39 $0.35 $14.74
HIGHWAY/PARKING LOT STRIPING: MasonTender- Brick/Cement/Concrete Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Quay, San Miguel, Taos, Union Highway
SUNM2011-005
$13.04 $1.78 $14.82
HIGHWAY/PARKING LOT STRIPING: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$14.55 $0.35 $14.90
HIGHWAY/PARKING LOT STRIPING: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$22.44 $5.85 $28.29
HIGHWAY/PARKING LOT STRIPING: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$11.22 $0.35 $11.57
HIGHWAY/PARKING LOT STRIPING: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$11.66 $0.35 $12.01
HIGHWAY/PARKING LOT STRIPING: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$14.15 $0.44 $14.59
HIGHWAY/PARKING LOT STRIPING: Mora Highway
SUNM2011-005
$11.34 $0.35 $11.69
HIGHWAY/PARKING LOT STRIPING: PAINTER Highway
SUNM2011-005 (Brush, Roller and Spray) Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Quay, Rio Arriba, San Miguel, Taos, Union
$15.06 $0.44 $15.50
HIGHWAY/PARKING LOT STRIPING: Pipelayer Highway
SUNM2011-005
$16.99 $0.35 $17.34
HIGHWAY/PARKING LOT STRIPING: Quay Highway
SUNM2011-005 Scope differs by code/WD
$16.37 $0.26 $16.63
HIGHWAY/PARKING LOT STRIPING: Quay Highway
SUNM2011-005 Scope differs by code/WD
$12.00 $0.35 $12.35
HIGHWAY/PARKING LOT STRIPING: Quay Highway
SUNM2011-005 Scope differs by code/WD
$12.15 $0.35 $12.50
HIGHWAY/PARKING LOT STRIPING: Quay Highway
SUNM2011-005 Scope differs by code/WD
$12.21 $0.26 $12.47
HIGHWAY/PARKING LOT STRIPING: Rio Arriba Highway
SUNM2011-005 Scope differs by code/WD
$21.98 $6.03 $28.01
HIGHWAY/PARKING LOT STRIPING: Rio Arriba Highway
SUNM2011-005 Scope differs by code/WD
$12.28 $0.35 $12.63
HIGHWAY/PARKING LOT STRIPING: Rio Arriba Highway
SUNM2011-005 Scope differs by code/WD
$13.33 $1.97 $15.30
HIGHWAY/PARKING LOT STRIPING: San Miguel Highway
SUNM2011-005 Scope differs by code/WD
$15.31 $0.35 $15.66
HIGHWAY/PARKING LOT STRIPING: San Miguel Highway
SUNM2011-005 Scope differs by code/WD
$12.56 $0.35 $12.91
HIGHWAY/PARKING LOT STRIPING: Taos Highway
SUNM2011-005
$12.61 $0.35 $12.96
HIGHWAY/PARKING LOT STRIPING: Union Highway
SUNM2011-005
$10.89 $0.35 $11.24
IRONWORKER Structural and Reinforcing Heavy
IRON0495-003
$28.05 $18.11 $46.16
IRONWORKER, REINFORCING Building
SUNM2010-019
$19.75 $8.71 $28.46
IRONWORKER, STRUCTURAL AND ORNAMENTAL Building
IRON0495-010
$28.05 $18.11 $46.16
Laborer, Mason Tender Brick Building
LABO0016-005 (3)
$23.69 $7.89 $31.58
Laborer, Unskilled Residential
SUNM1999-003
$8.13 $0.00 $8.13
LABORER: Asphalt Raker Building
SUNM2010-019
$10.25 0.00 $10.25
LABORER: Common or General Heavy
SUNM2009-005
$13.26 $0.35 $13.61
LABORER: Common or General Building
SUNM2010-019
$12.99 $3.56 $16.55
LABORER: Flagger Heavy
SUNM2009-005
$10.90 0.00 $10.90
LABORER: Landscape & Irrigation Building
SUNM2010-019
$12.42 $1.47 $13.89
LABORER: Mason Tender - Cement/Concrete Building
SUNM2010-019
$11.51 $0.85 $12.36
LABORER: Pipelayer Building
SUNM2010-019
$13.78 $2.20 $15.98
McKinley Highway
SUNM2011-005
$13.51 $0.44 $13.95
Mora Highway
SUNM2011-005
$14.44 $0.44 $14.88
OPERATOR: Backhoe Heavy
SUNM2009-005
$17.00 0.00 $17.00
OPERATOR: Backhoe Building
SUNM2010-019
$18.79 $3.47 $22.26
OPERATOR: Crane Building
SUNM2010-019
$24.38 $4.60 $28.98
OPERATOR: Forklift Building
SUNM2010-019
$20.86 $4.60 $25.46
OPERATOR: Grader/Blade Heavy
SUNM2009-005
$18.79 $2.35 $21.14
OPERATOR: Grader/Blade Building
SUNM2010-019
$20.33 $4.94 $25.27
OPERATOR: Loader (Front End) Heavy
SUNM2009-005
$17.43 $0.26 $17.69
OPERATOR: Loader (Front End) Building
SUNM2010-019
$19.76 $4.84 $24.60
OPERATOR: Scraper Heavy
SUNM2009-005
$14.03 0.00 $14.03
PAINTER Residential
SUNM1999-003 (excluding drywall finishing)
$9.00 $0.00 $9.00
PAINTER: Brush and Roller, Excludes Drywall Finishing/Taping Building
PAIN0823-007
$24.00 $7.00 $31.00
PAINTER: Spray Building
SUNM2010-019 (Excludes Drywall Finishing/Taping)
$15.47 $2.09 $17.56
PIPEFITTER Building
PLUM0412-007 (Including HVAC Pipe Installation)
$43.07 $16.60 $59.67
PLASTERER Building
SUNM2010-019
$17.65 $5.29 $22.94
PLUMBER Heavy
SUNM2009-005
$26.27 $7.69 $33.96
PLUMBER Building
PLUM0412-007 (Excluding HVAC Pipe Installation)
$43.07 $16.60 $59.67
PLUMBER Including HVAC work Residential
SUNM1999-003
$16.07 $0.65 $16.72
Power Equipment Operator Building
ENGI0953-008 (2) Roller(Dirt and Grade Compaction)
$26.75 $4.65 $31.40
POWER EQUIPMENT OPERATOR: Asphalt/Concrete Paver, Laydown Machine, and Plant Highway
SUNM2011-005
$16.43 $1.51 $17.94
POWER EQUIPMENT OPERATOR: Backhoe/Excavator/Trackhoe Cibola, Colfax, Guadalupe, Los Alamos, Mora, Rio Arriba, San Miguel, Taos, Union Highway
SUNM2011-005
$16.80 $0.26 $17.06
POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway
SUNM2011-005
$18.06 $0.26 $18.32
POWER EQUIPMENT OPERATOR: Broom Operator Highway
SUNM2011-005
$15.72 $0.26 $15.98
POWER EQUIPMENT OPERATOR: Bulldozer Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Rio Arriba, San Miguel, Taos, Union Highway
SUNM2011-005
$14.97 $0.26 $15.23
POWER EQUIPMENT OPERATOR: Colfax Highway
SUNM2011-005
$15.72 $0.26 $15.98
POWER EQUIPMENT OPERATOR: Colfax, Guadalupe, Harding, Los Alamos, Mora, Taos, Union Highway
SUNM2011-005
$13.27 $0.26 $13.53
POWER EQUIPMENT OPERATOR: Colfax, San Miguel Highway
SUNM2011-005
$13.24 $0.26 $13.50
POWER EQUIPMENT OPERATOR: Crusher Highway
SUNM2011-005
$16.53 $0.26 $16.79
POWER EQUIPMENT OPERATOR: Distributor Highway
SUNM2011-005
$14.50 $0.26 $14.76
POWER EQUIPMENT OPERATOR: Dump Truck Cibola, Guadalupe, Harding, Los Alamos, Mora, Rio Arriba, Taos, Union Highway
SUNM2011-005
$14.75 $0.26 $15.01
POWER EQUIPMENT OPERATOR: Flatbed Truck Cibola Highway
SUNM2011-005
$12.71 $0.26 $12.97
POWER EQUIPMENT OPERATOR: Forklift Highway
SUNM2011-005
$17.16 $0.26 $17.42
POWER EQUIPMENT OPERATOR: Grader/Blade Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Rio Arriba, San Miguel, Taos, Union Highway
SUNM2011-005
$17.48 $0.26 $17.74
POWER EQUIPMENT OPERATOR: Harding Highway
SUNM2011-005 Scope differs by code/WD
$20.74 $0.26 $21.00
POWER EQUIPMENT OPERATOR: Harding Highway
SUNM2011-005 Scope differs by code/WD
$19.37 $0.26 $19.63
POWER EQUIPMENT OPERATOR: Loader Highway
SUNM2011-005 (Front End) Cibola, Guadalupe, Los Alamos, Rio Arriba, San Miguel, Taos, Union
$16.27 $0.26 $16.53
POWER EQUIPMENT OPERATOR: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$16.70 $0.26 $16.96
POWER EQUIPMENT OPERATOR: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$16.13 $0.26 $16.39
POWER EQUIPMENT OPERATOR: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$14.95 $0.26 $15.21
POWER EQUIPMENT OPERATOR: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$16.49 $0.26 $16.75
POWER EQUIPMENT OPERATOR: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$13.15 $0.26 $13.41
POWER EQUIPMENT OPERATOR: McKinley Highway
SUNM2011-005 Scope differs by code/WD
$13.55 $0.26 $13.81
POWER EQUIPMENT OPERATOR: Mechanic Highway
SUNM2011-005
$17.48 $0.26 $17.74
POWER EQUIPMENT OPERATOR: Milling Machine Highway
SUNM2011-005
$16.89 $0.26 $17.15
POWER EQUIPMENT OPERATOR: Mora Highway
SUNM2011-005
$16.21 $0.26 $16.47
POWER EQUIPMENT OPERATOR: Oiler Highway
SUNM2011-005
$14.29 $0.26 $14.55
POWER EQUIPMENT OPERATOR: Pickup and Pilot Car Highway
SUNM2011-005
$12.74 $0.26 $13.00
POWER EQUIPMENT OPERATOR: Piledriver Cibola, Colfax, Guadalupe, Harding, Los Alamos, Mora, Rio Arriba, San Miguel, Taos, Union Highway
SUNM2011-005
$15.87 $0.26 $16.13
POWER EQUIPMENT OPERATOR: Quay Highway
SUNM2011-005 Scope differs by code/WD
$16.27 $0.26 $16.53
POWER EQUIPMENT OPERATOR: Quay Highway
SUNM2011-005 Scope differs by code/WD
$14.89 $0.26 $15.15
POWER EQUIPMENT OPERATOR: Quay Highway
SUNM2011-005 Scope differs by code/WD
$19.50 $0.26 $19.76
POWER EQUIPMENT OPERATOR: Quay Highway
SUNM2011-005 Scope differs by code/WD
$16.10 $0.26 $16.36
POWER EQUIPMENT OPERATOR: Quay Highway
SUNM2011-005 Scope differs by code/WD
$15.99 $0.26 $16.25
POWER EQUIPMENT OPERATOR: Quay Highway
SUNM2011-005 Scope differs by code/WD
$14.74 $0.26 $15.00
POWER EQUIPMENT OPERATOR: Quay Highway
SUNM2011-005 Scope differs by code/WD
$15.20 $0.26 $15.46
POWER EQUIPMENT OPERATOR: Quay, San Miguel Highway
SUNM2011-005
$13.30 $0.26 $13.56
POWER EQUIPMENT OPERATOR: Rio Arriba Highway
SUNM2011-005
$12.95 $0.26 $13.21
POWER EQUIPMENT OPERATOR: Roller Highway
SUNM2011-005 (Asphalt and Dirt) Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Rio Arriba, San Miguel, Taos, Union
$14.39 $0.98 $15.37
POWER EQUIPMENT OPERATOR: Rotomill Highway
SUNM2011-005
$15.80 $0.26 $16.06
POWER EQUIPMENT OPERATOR: Scraper Highway
SUNM2011-005
$15.91 $0.26 $16.17
POWER EQUIPMENT OPERATOR: Screed Highway
SUNM2011-005
$15.96 $0.26 $16.22
POWER EQUIPMENT OPERATOR: Semi-Trailer Truck Highway
SUNM2011-005
$16.58 $0.26 $16.84
POWER EQUIPMENT OPERATOR: Tractor Highway
SUNM2011-005
$16.84 $0.26 $17.10
POWER EQUIPMENT OPERATOR: Tractor Haul Truck Highway
SUNM2011-005
$14.00 $0.00 $14.00
POWER EQUIPMENT OPERATOR: Trencher Highway
SUNM2011-005
$16.26 $0.26 $16.52
POWER EQUIPMENT OPERATOR: TRUCK DRIVER Distributor Highway
SUNM2011-005
$13.56 $0.26 $13.82
POWER EQUIPMENT OPERATOR: Water Truck Highway
SUNM2011-005
$13.13 $0.26 $13.39
Rio Arriba, San Miguel Highway
SUNM2011-005
$15.58 $1.54 $17.12
ROOFER Residential
SUNM1999-003
$9.87 $0.00 $9.87
ROOFER Building
SUNM2010-019
$18.84 0.00 $18.84
San Miguel Highway
SUNM2011-005
$13.93 $0.44 $14.37
Sheet metal worker Residential
SUNM1999-003 (Setting of HVAC unit and duct work installation only)
$14.43 $0.58 $15.01
Sheet Metal Worker Building
SHEE0049-012 (HVAC Duct and System Installation Only)
$37.50 $18.51 $56.01
SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building
SUNM2010-019
$22.01 $9.65 $31.66
SPRINKLER FITTER Building
SUNM2010-019 (Fire Sprinklers)
$20.00 $4.16 $24.16
Taos Highway
SUNM2011-005
$14.98 $0.26 $15.24
TILE FINISHER Building
SUNM2010-019
$14.02 0.00 $14.02
TILE SETTER Building
SUNM2010-019
$14.30 $1.02 $15.32
TRUCK DRIVER: Dump Truck Heavy
SUNM2009-005
$11.90 0.00 $11.90
TRUCK DRIVER: Dump Truck Building
SUNM2010-019
$11.00 0.00 $11.00
TRUCK DRIVER: Pickup Truck Building
SUNM2010-019
$15.91 $3.13 $19.04
TRUCK DRIVER: Water Truck Heavy
SUNM2009-005
$13.72 $5.25 $18.97
TRUCK DRIVER: Water Truck Building
SUNM2010-019
$15.16 $4.69 $19.85

Wage Determinations

Residential

0 trades

Applies to

Cibola, Colfax, Guadalupe, Harding, McKinley, Mora, Quay, Rio Arriba, San Juan, San Miguel +3 more

Heavy

0 trades

Applies to

Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Quay, Rio Arriba, San Miguel +1 more

Building

0 trades

Applies to

Cibola, Guadalupe, Harding, Mora, Quay, Taos in New Mexico.

Highway

0 trades

Applies to

Cibola, Colfax, Guadalupe, Harding, Los Alamos, McKinley, Mora, Quay, Rio Arriba, San Miguel +2 more