NM20260005
rev 0Residential
0 trades
Applies to
Catron, Chaves, Curry, De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln, Luna +4 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| (8) Crane Building ENGI0953-007 | $31.43 | $4.65 | $36.08 |
| BOILERMAKER Building SUNM2010-020 | $21.77 | $3.98 | $25.75 |
| BRICKLAYER Building SUNM2010-020 | $20.36 | $5.74 | $26.10 |
| CARPENTER Residential SUNM1999-004 (excluding form work, and installation of drywall and soft floors) | $11.69 | $0.30 | $11.99 |
| CARPENTER Heavy SUNM2009-006 | $22.26 | $6.20 | $28.46 |
| CARPENTER Building SUNM2010-020 (Acoustical Ceiling Installation Only) | $20.79 | 0.00 | $20.79 |
| CARPENTER Building SUNM2010-020 (Drywall Hanging Only) | $21.39 | $2.85 | $24.24 |
| CARPENTER Highway SUNM2011-004 (Includes Form Work) Catron, Chaves, Curry, DeBaca, Eddy, Grant, Hidalgo, Lincoln, Otero, Roosevelt, Sierra, Socorro | $13.93 | $0.44 | $14.37 |
| CARPENTER (Form Work Only) Building SUNM2010-020 | $19.79 | $6.14 | $25.93 |
| CARPENTER Form Work Only Residential SUNM1999-004 | $10.50 | $0.00 | $10.50 |
| Carpenter Metal Stud Installation Only Building CARP1245-004 | $24.08 | $10.79 | $34.87 |
| CARPENTER, Excludes Acoustical Ceiling Installation, Batt Insulation, Drywall Hanging, Form Work, and Metal Stud Installation Building SUNM2010-020 | $22.13 | $4.03 | $26.16 |
| CEMENT MASON/CONCRETE FINISHER Residential SUNM1999-004 | $12.50 | $0.00 | $12.50 |
| CEMENT MASON/CONCRETE FINISHER Building SUNM2010-020 | $17.72 | $3.72 | $21.44 |
| CEMENT MASON/CONCRETE FINISHER Catron, Chaves, Curry, DeBaca, Eddy, Grant, Hidalgo, Lincoln, Otero, Roosevelt, Sierra, Socorro Highway SUNM2011-004 | $14.17 | $0.55 | $14.72 |
| DRYWALL FINISHER/TAPER Residential SUNM1999-004 | $10.00 | $0.00 | $10.00 |
| DRYWALL FINISHER/TAPER Building SUNM2010-020 | $19.64 | $2.75 | $22.39 |
| ELECTRICIAN Residential SUNM1999-004 (excluding HVAC wiring) | $12.00 | $0.26 | $12.26 |
| ELECTRICIAN Heavy ELEC0583-006 | $38.00 | $7.92 | $45.92 |
| ELECTRICIAN Building SUNM2010-020 (Low Voltage Wiring for Alarms) | $28.25 | $6.62 | $34.87 |
| ELECTRICIAN Highway SUNM2011-004 (Including Traffic Signalization) Catron, Chaves, Curry, DeBaca, Eddy, Grant, Hidalgo, Lincoln, Otero, Roosevelt, Sierra, Socorro | $26.21 | $9.35 | $35.56 |
| ELECTRICIAN Excluding Low Voltage Wiring for Alarms Building ELEC0583-010 | $38.00 | $7.92 | $45.92 |
| ELECTRICIAN Excluding Low Voltage Wiring for Alarms Zone 1 Building ELEC0611-021 | $40.30 | $13.41 | $53.71 |
| ELECTRICIAN Zone 1 Heavy ELEC0611-006 | $40.30 | $13.41 | $53.71 |
| ELECTRICIAN ZONE 1 Heavy ELEC0611-002 | $40.30 | $13.41 | $53.71 |
| FLOOR LAYER: Carpet Building SUNM2010-020 | $22.31 | $0.30 | $22.61 |
| GLAZIER Building SUNM2010-020 | $20.15 | $3.95 | $24.10 |
| HIGHWAY/PARKING LOT STRIPING: Common or General Catron, Chaves, Curry, Hidalgo, Lincoln, Sierra, Socorro Highway SUNM2011-004 | $11.67 | $0.35 | $12.02 |
| HIGHWAY/PARKING LOT STRIPING: DeBaca Highway SUNM2011-004 | $11.33 | $0.35 | $11.68 |
| HIGHWAY/PARKING LOT STRIPING: Eddy Highway SUNM2011-004 | $11.78 | $0.35 | $12.13 |
| HIGHWAY/PARKING LOT STRIPING: Flagger/Cone Setter Highway SUNM2011-004 | $12.56 | $0.35 | $12.91 |
| HIGHWAY/PARKING LOT STRIPING: Grade Checker Highway SUNM2011-004 | $16.18 | $1.60 | $17.78 |
| HIGHWAY/PARKING LOT STRIPING: Grant Highway SUNM2011-004 | $10.62 | $0.35 | $10.97 |
| HIGHWAY/PARKING LOT STRIPING: Includes Highway Line/Parking Lot Line Striping and Line Striping Truck Driver Highway SUNM2011-004 | $15.93 | $0.35 | $16.28 |
| HIGHWAY/PARKING LOT STRIPING: INSTALLER: Highway SUNM2011-004 (Guardrails, Handrails and Signs) Catron, Chaves, Curry, DeBaca, Eddy, Grant, Hidalgo, Lincoln, Otero, Roosevelt, Sierra, Socorro | $13.58 | $0.35 | $13.93 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Catron, Chaves, Curry, DeBaca, Eddy, Grant, Hidalgo, Lincoln, Otero, Roosevelt, Sierra, Socorro Highway SUNM2011-004 | $21.66 | $6.03 | $27.69 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, STRUCTURAL Highway SUNM2011-004 | $21.77 | $6.03 | $27.80 |
| HIGHWAY/PARKING LOT STRIPING: LABORER Asphalt Raker Highway SUNM2011-004 | $13.00 | $0.35 | $13.35 |
| HIGHWAY/PARKING LOT STRIPING: Lea Highway SUNM2011-004 Scope differs by code/WD | $14.62 | $0.30 | $14.92 |
| HIGHWAY/PARKING LOT STRIPING: Lea Highway SUNM2011-004 Scope differs by code/WD | $21.77 | $6.03 | $27.80 |
| HIGHWAY/PARKING LOT STRIPING: Lea Highway SUNM2011-004 Scope differs by code/WD | $11.61 | $0.35 | $11.96 |
| HIGHWAY/PARKING LOT STRIPING: Luna, Roosevelt Highway SUNM2011-004 | $12.56 | $0.35 | $12.91 |
| HIGHWAY/PARKING LOT STRIPING: Mason Tender- Brick/Cement/Concrete Highway SUNM2011-004 | $11.39 | $0.79 | $12.18 |
| HIGHWAY/PARKING LOT STRIPING: Otero Highway SUNM2011-004 | $12.73 | $0.35 | $13.08 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER Highway SUNM2011-004 (Brush, Roller, and Spray) | $15.41 | $0.44 | $15.85 |
| HIGHWAY/PARKING LOT STRIPING: Pipelayer Highway SUNM2011-004 | $19.28 | $0.00 | $19.28 |
| HIGHWAY/PARKING LOT STRIPING: Power/Air Tool Operator, Includes Jack Hammer Highway SUNM2011-004 | $13.91 | $0.86 | $14.77 |
| INSULATOR - BATT Building SUNM2010-020 | $24.44 | $8.43 | $32.87 |
| IRONWORKER Structural Heavy IRON0495-004 | $28.05 | $18.11 | $46.16 |
| IRONWORKER, ORNAMENTAL Building IRON0495-009 | $28.05 | $18.11 | $46.16 |
| IRONWORKER, REINFORCING Heavy SUNM2009-006 | $22.75 | $9.60 | $32.35 |
| IRONWORKER, REINFORCING Building SUNM2010-020 | $20.84 | $7.68 | $28.52 |
| IRONWORKER, STRUCTURAL Building IRON0495-009 (Metal Building Erection Only) | $28.05 | $18.11 | $46.16 |
| IRONWORKER, STRUCTURAL, Excludes Metal Building Erection Building SUNM2010-020 | $22.20 | $8.06 | $30.26 |
| Laborer, Unskilled Residential SUNM1999-004 | $8.36 | $0.00 | $8.36 |
| LABORER: Common or General Heavy SUNM2009-006 | $12.37 | 0.00 | $12.37 |
| LABORER: Common or General Building SUNM2010-020 | $13.12 | $3.79 | $16.91 |
| LABORER: Flagger Heavy SUNM2009-006 | $10.90 | 0.00 | $10.90 |
| LABORER: Landscape & Irrigation Building SUNM2010-020 | $10.60 | $0.24 | $10.84 |
| LABORER: Mason Tender - Brick Building SUNM2010-020 | $13.77 | $4.35 | $18.12 |
| LABORER: Mason Tender - Cement/Concrete Building SUNM2010-020 | $11.51 | $0.85 | $12.36 |
| LABORER: Pipelayer Building SUNM2010-020 | $13.78 | $2.20 | $15.98 |
| Lea Highway SUNM2011-004 Scope differs by code/WD | $13.30 | $0.44 | $13.74 |
| Lea Highway SUNM2011-004 Scope differs by code/WD | $13.74 | $0.68 | $14.42 |
| Lea Highway SUNM2011-004 Scope differs by code/WD | $24.90 | $8.56 | $33.46 |
| Luna Highway SUNM2011-004 | $13.11 | $0.44 | $13.55 |
| OPERATOR: Backhoe Heavy SUNM2009-006 | $14.03 | 0.00 | $14.03 |
| OPERATOR: Backhoe Building SUNM2010-020 | $22.13 | $4.30 | $26.43 |
| OPERATOR: Forklift Building SUNM2010-020 | $21.13 | $4.83 | $25.96 |
| OPERATOR: Grader/Blade Heavy SUNM2009-006 | $18.79 | $2.35 | $21.14 |
| OPERATOR: Grader/Blade Building SUNM2010-020 | $21.39 | $4.94 | $26.33 |
| OPERATOR: Loader (Front End) Heavy SUNM2009-006 | $22.07 | $5.05 | $27.12 |
| OPERATOR: Scraper Heavy SUNM2009-006 | $14.03 | 0.00 | $14.03 |
| PAINTER Residential SUNM1999-004 (excluding drywall finishing) | $10.57 | $0.00 | $10.57 |
| PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping Building SUNM2010-020 | $16.58 | $1.75 | $18.33 |
| PIPEFITTER Heavy SUNM2009-006 | $25.64 | $11.31 | $36.95 |
| PIPEFITTER Building PLUM0412-007 (Including HVAC Pipe Installation) | $43.07 | $16.60 | $59.67 |
| PLASTERER Residential SUNM1999-004 | $12.00 | $0.00 | $12.00 |
| PLASTERER Building SUNM2010-020 | $17.65 | $7.15 | $24.80 |
| PLUMBER Heavy SUNM2009-006 | $26.27 | $7.69 | $33.96 |
| PLUMBER Building PLUM0412-007 (Excluding HVAC Pipe Installation) | $43.07 | $16.60 | $59.67 |
| PLUMBER (excluding HVAC work) Residential SUNM1999-004 | $12.00 | $0.00 | $12.00 |
| Power Equipment Operator Building ENGI0953-007 (2) Roller(Dirt and Grade Compaction) | $26.75 | $4.65 | $31.40 |
| POWER EQUIPMENT OPERATOR: Asphalt/Concrete Paver, Laydown Machine, and Plant Highway SUNM2011-004 | $15.42 | $0.26 | $15.68 |
| POWER EQUIPMENT OPERATOR: Backhoe/Excavator/Trackhoe Catron, Chaves, Curry, DeBaca, Grant, Hidalgo, Lincoln, Luna, Otero, Roosevelt, Sierra, Socorro Highway SUNM2011-004 | $19.92 | $0.26 | $20.18 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUNM2011-004 | $18.06 | $0.26 | $18.32 |
| POWER EQUIPMENT OPERATOR: Broom Highway SUNM2011-004 | $15.48 | $0.26 | $15.74 |
| POWER EQUIPMENT OPERATOR: Bulldozer Highway SUNM2011-004 | $16.25 | $0.26 | $16.51 |
| POWER EQUIPMENT OPERATOR: Crusher Highway SUNM2011-004 | $16.53 | $0.26 | $16.79 |
| POWER EQUIPMENT OPERATOR: DeBaca Highway SUNM2011-004 | $14.19 | $0.75 | $14.94 |
| POWER EQUIPMENT OPERATOR: Distributor Highway SUNM2011-004 | $14.50 | $0.26 | $14.76 |
| POWER EQUIPMENT OPERATOR: Dump Truck Catron, Chaves, Curry, DeBaca, Eddy, Grant, Hidalgo, Lincoln, Luna, Otero, Roosevelt, Sierra, Socorro Highway SUNM2011-004 | $14.60 | $0.26 | $14.86 |
| POWER EQUIPMENT OPERATOR: Eddy Highway SUNM2011-004 Scope differs by code/WD | $14.87 | $0.26 | $15.13 |
| POWER EQUIPMENT OPERATOR: Eddy Highway SUNM2011-004 Scope differs by code/WD | $13.70 | $0.26 | $13.96 |
| POWER EQUIPMENT OPERATOR: Eddy Highway SUNM2011-004 Scope differs by code/WD | $12.71 | $0.26 | $12.97 |
| POWER EQUIPMENT OPERATOR: Eddy Highway SUNM2011-004 Scope differs by code/WD | $12.60 | $0.26 | $12.86 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Catron, Chaves, Curry, DeBaca, Grant, Hidalgo, Lincoln, Luna, Otero, Sierra, Socorro Highway SUNM2011-004 | $12.96 | $0.26 | $13.22 |
| POWER EQUIPMENT OPERATOR: Forklift Highway SUNM2011-004 | $17.16 | $0.26 | $17.42 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Highway SUNM2011-004 | $18.02 | $0.26 | $18.28 |
| POWER EQUIPMENT OPERATOR: Lea Highway SUNM2011-004 Scope differs by code/WD | $16.88 | $0.26 | $17.14 |
| POWER EQUIPMENT OPERATOR: Lea Highway SUNM2011-004 Scope differs by code/WD | $20.69 | $0.26 | $20.95 |
| POWER EQUIPMENT OPERATOR: Lea Highway SUNM2011-004 Scope differs by code/WD | $17.41 | $0.26 | $17.67 |
| POWER EQUIPMENT OPERATOR: Lea Highway SUNM2011-004 Scope differs by code/WD | $14.61 | $0.26 | $14.87 |
| POWER EQUIPMENT OPERATOR: Lea Highway SUNM2011-004 Scope differs by code/WD | $13.05 | $0.26 | $13.31 |
| POWER EQUIPMENT OPERATOR: Lea Highway SUNM2011-004 Scope differs by code/WD | $12.84 | $0.26 | $13.10 |
| POWER EQUIPMENT OPERATOR: Lea Highway SUNM2011-004 Scope differs by code/WD | $15.07 | $0.26 | $15.33 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUNM2011-004 | $16.12 | $0.26 | $16.38 |
| POWER EQUIPMENT OPERATOR: Mechanic Catron, Chaves, Curry, DeBaca, Eddy, Grant, Hidalgo, Lincoln, Luna, Otero, Roosevelt, Sierra, Socorro Highway SUNM2011-004 | $19.44 | $0.26 | $19.70 |
| POWER EQUIPMENT OPERATOR: Milling Machine Highway SUNM2011-004 | $16.59 | $0.26 | $16.85 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUNM2011-004 | $15.79 | $0.26 | $16.05 |
| POWER EQUIPMENT OPERATOR: Pickup and Pilot Car Catron, Chaves, Curry, DeBaca, Grant, Hidalgo, Lincoln, Luna, Otero, Roosevelt, Sierra, Socorro Highway SUNM2011-004 | $12.70 | $0.26 | $12.96 |
| POWER EQUIPMENT OPERATOR: Piledriver Highway SUNM2011-004 | $17.82 | $0.26 | $18.08 |
| POWER EQUIPMENT OPERATOR: Roller Highway SUNM2011-004 (Asphalt, Dirt, and Sheepsfoot) Catron, Chaves, Curry, Eddy, Grant, Hidalgo, Lincoln, Luna, Otero, Roosevelt, Sierra, Socorro | $15.86 | $0.26 | $16.12 |
| POWER EQUIPMENT OPERATOR: Roosevelt Highway SUNM2011-004 | $13.26 | $0.26 | $13.52 |
| POWER EQUIPMENT OPERATOR: Scraper Highway SUNM2011-004 | $15.91 | $0.26 | $16.17 |
| POWER EQUIPMENT OPERATOR: Screed Highway SUNM2011-004 | $15.70 | $0.26 | $15.96 |
| POWER EQUIPMENT OPERATOR: Semi-Trailer Truck Highway SUNM2011-004 | $16.58 | $0.26 | $16.84 |
| POWER EQUIPMENT OPERATOR: Tractor Highway SUNM2011-004 | $15.40 | $0.26 | $15.66 |
| POWER EQUIPMENT OPERATOR: Tractor Haul Truck Highway SUNM2011-004 | $14.00 | $0.00 | $14.00 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUNM2011-004 | $16.31 | $0.26 | $16.57 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Distributor Catron, Chaves, Curry, DeBaca, Grant, Hidalgo, Lea, Lincoln, Luna, Otero, Roosevelt, Sierra, Socorro Highway SUNM2011-004 | $13.81 | $0.26 | $14.07 |
| POWER EQUIPMENT OPERATOR: Water Truck Catron, Chaves, Curry, DeBaca, Eddy, Grant, Hidalgo, Lincoln, Luna, Otero, Roosevelt, Sierra, Socorro Highway SUNM2011-004 | $14.39 | $0.26 | $14.65 |
| ROOFER Building SUNM2010-020 | $13.24 | $0.50 | $13.74 |
| Sheet Metal Worker Building SHEE0049-012 (HVAC Duct and System Installation Only) | $37.50 | $18.51 | $56.01 |
| SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building SUNM2010-020 | $22.01 | $9.65 | $31.66 |
| TILE FINISHER Building SUNM2010-020 | $14.02 | 0.00 | $14.02 |
| TILE SETTER Building SUNM2010-020 | $19.00 | 0.00 | $19.00 |
| TRUCK DRIVER: Dump Truck Heavy SUNM2009-006 | $11.90 | 0.00 | $11.90 |
| TRUCK DRIVER: Dump Truck Building SUNM2010-020 | $15.36 | $5.00 | $20.36 |
| TRUCK DRIVER: Pickup Truck Building SUNM2010-020 | $15.91 | $3.13 | $19.04 |
| TRUCK DRIVER: Water Truck Heavy SUNM2009-006 | $13.72 | $5.25 | $18.97 |
| TRUCK DRIVER: Water Truck Building SUNM2010-020 | $16.25 | $5.00 | $21.25 |
No trade rates match your search and filter selection.
Residential
Applies to
Catron, Chaves, Curry, De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln, Luna +4 more
Heavy
Applies to
De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln, Luna, Roosevelt, Sierra, Socorro in New Mexico.
Building
Applies to
Hidalgo, Sierra in New Mexico.
Highway
Applies to
Catron, Chaves, Curry, De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln, Luna +4 more