NM20260039
rev 0Heavy
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0076-008 | $36.66 | $11.83 | $48.49 |
| CARPENTER Building SUNM2016-002 (Drywall Hanging Only) | $19.64 | $6.20 | $25.84 |
| CARPENTER (Form Work Only) Heavy CARP1319-011 | $27.31 | $13.18 | $40.49 |
| Carpenter Excludes Drywall Hanging Building CARP1245-006 | $24.08 | $10.79 | $34.87 |
| CARPENTER, Excludes Form Work Heavy SUNM2016-008 | $16.43 | 0.00 | $16.43 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUNM2016-008 | $19.44 | $8.08 | $27.52 |
| CEMENT MASON/CONCRETE FINISHER Building SUNM2016-002 | $18.93 | $5.85 | $24.78 |
| ELECTRICIAN Heavy ELEC0611-001 | $34.50 | $10.81 | $45.31 |
| ELECTRICIAN Building SUNM2016-002 | $29.26 | $8.98 | $38.24 |
| IRONWORKER, REINFORCING Heavy SUNM2016-008 | $27.80 | 0.00 | $27.80 |
| IRONWORKER, STRUCTURAL Building SUNM2016-002 | $28.00 | $8.21 | $36.21 |
| LABORER: Common or General Heavy SUNM2016-008 | $15.68 | $0.35 | $16.03 |
| LABORER: Common or General Building SUNM2016-002 | $16.49 | $4.54 | $21.03 |
| LABORER: Mason Tender - Cement/Concrete Building SUNM2016-002 | $17.60 | 0.00 | $17.60 |
| LABORER: Pipelayer Heavy SUNM2016-008 | $16.67 | $3.04 | $19.71 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUNM2016-008 | $20.85 | $4.19 | $25.04 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUNM2016-002 | $25.73 | $4.51 | $30.24 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Heavy SUNM2016-008 | $21.06 | 0.00 | $21.06 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUNM2016-008 | $21.00 | 0.00 | $21.00 |
| OPERATOR: OPERATOR: Grader/Blade Heavy SUNM2016-008 | $19.02 | 0.00 | $19.02 |
| OPERATOR: OPERATOR: Loader Heavy SUNM2016-008 | $18.30 | 0.00 | $18.30 |
| OPERATOR: OPERATOR: Oiler Heavy SUNM2016-008 | $18.23 | 0.00 | $18.23 |
| OPERATOR: OPERATOR: Roller Heavy SUNM2016-008 | $18.83 | 0.00 | $18.83 |
| OPERATOR: PAINTER (Brush and Roller) Building SUNM2016-002 | $16.60 | $3.88 | $20.48 |
| OPERATOR: PAINTER: Spray Building SUNM2016-002 | $16.51 | $2.14 | $18.65 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUNM2016-008 | $15.53 | 0.00 | $15.53 |
| PIPEFITTER Building PLUM0412-015 | $43.07 | $16.60 | $59.67 |
| PLUMBER Building PLUM0412-018 | $43.07 | $16.60 | $59.67 |
| Sheet Metal Worker Building SHEE0049-005 (Includes HVAC Duct Installation) | $37.50 | $18.51 | $56.01 |
No trade rates match your search and filter selection.
Heavy
Building