| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| (8) Backhoe, Crane Building ENGI0953-006 | $31.43 | $4.65 | $36.08 |
| BOILERMAKER Building SUNM2010-007 | $21.77 | $3.98 | $25.75 |
| BRICKLAYER Building SUNM2010-007 | $20.36 | $5.74 | $26.10 |
| CARPENTER Building SUNM2010-007 (Acoustical Ceiling Installation Only) | $20.79 | 0.00 | $20.79 |
| CARPENTER Building SUNM2010-007 (Drywall Hanging Only) | $21.39 | $2.85 | $24.24 |
| CARPENTER (Form Work Only) Building SUNM2010-007 | $19.79 | $6.14 | $25.93 |
| Carpenter Including Metal Stud Installation Building CARP1245-005 (Excluding Acoustical Ceiling Installation, Batt Insulation, Drywall Hanging and Form Work) | $24.08 | $10.79 | $34.87 |
| CEMENT MASON/CONCRETE FINISHER Building SUNM2010-007 | $17.72 | $3.72 | $21.44 |
| DRYWALL FINISHER/TAPER Building SUNM2010-007 | $19.64 | $2.75 | $22.39 |
| ELECTRICIAN Building SUNM2010-007 (Low Voltage Wiring for Alarms) | $28.25 | $6.62 | $34.87 |
| ELECTRICIAN Excluding Low Voltage Wiring for Alarms Zone 1 Building ELEC0611-020 | $40.30 | $13.41 | $53.71 |
| FLOOR LAYER: Carpet Building SUNM2010-007 | $22.31 | $0.30 | $22.61 |
| GLAZIER Building SUNM2010-007 | $20.15 | $3.95 | $24.10 |
| INSULATOR - BATT Building SUNM2010-007 | $24.44 | $8.43 | $32.87 |
| IRONWORKER, ORNAMENTAL Building IRON0495-009 | $28.05 | $18.11 | $46.16 |
| IRONWORKER, REINFORCING Building SUNM2010-007 | $20.84 | $7.68 | $28.52 |
| IRONWORKER, STRUCTURAL Building IRON0495-009 (Metal Building Erection Only) | $28.05 | $18.11 | $46.16 |
| IRONWORKER, STRUCTURAL, Excludes Metal Building Erection Building SUNM2010-007 | $22.20 | $8.06 | $30.26 |
| LABORER: Common or General Building SUNM2010-007 | $13.12 | $3.79 | $16.91 |
| LABORER: Landscape & Irrigation Building SUNM2010-007 | $10.60 | $0.24 | $10.84 |
| LABORER: Mason Tender - Brick Building SUNM2010-007 | $13.77 | $4.35 | $18.12 |
| LABORER: Mason Tender - Cement/Concrete Building SUNM2010-007 | $11.51 | $0.85 | $12.36 |
| LABORER: Pipelayer Building SUNM2010-007 | $13.78 | $2.20 | $15.98 |
| OPERATOR: Forklift Building SUNM2010-007 | $21.13 | $4.83 | $25.96 |
| OPERATOR: Grader/Blade Building SUNM2010-007 | $21.39 | $4.94 | $26.33 |
| OPERATOR: Roller Building SUNM2010-007 (Dirt and Grade Compaction) | $13.47 | $4.10 | $17.57 |
| PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping Building SUNM2010-007 | $16.58 | $1.75 | $18.33 |
| PIPEFITTER Building PLUM0412-007 (Including HVAC Pipe Installation) | $43.07 | $16.60 | $59.67 |
| PLASTERER Building SUNM2010-007 | $17.65 | $7.15 | $24.80 |
| PLUMBER Building PLUM0412-007 (Excluding HVAC Pipe Installation) | $43.07 | $16.60 | $59.67 |
| Power Equipment Operator Building ENGI0953-006 (4) Bobcat/Skid Loader, Loader (Front End) | $27.70 | $4.65 | $32.35 |
| ROOFER Building SUNM2010-007 | $13.24 | $0.50 | $13.74 |
| Sheet Metal Worker Building SHEE0049-013 (Installation of HVAC System Only) | $37.50 | $18.51 | $56.01 |
| SHEET METAL WORKER Building SUNM2010-007 (HVAC Duct Installation Only) | $33.15 | $0.54 | $33.69 |
| SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building SUNM2010-007 | $22.01 | $9.65 | $31.66 |
| TILE FINISHER Building SUNM2010-007 | $14.02 | 0.00 | $14.02 |
| TILE SETTER Building SUNM2010-007 | $19.00 | 0.00 | $19.00 |
| TRUCK DRIVER: Dump Truck Building SUNM2010-007 | $15.36 | $5.00 | $20.36 |
| TRUCK DRIVER: Pickup Truck Building SUNM2010-007 | $15.91 | $3.13 | $19.04 |
| TRUCK DRIVER: Water Truck Building SUNM2010-007 | $16.25 | $5.00 | $21.25 |