NM20260028
rev 1Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| (4) Bobcat/Skid Loader Building ENGI0953-013 | $27.24 | $4.65 | $31.89 |
| ACOUSTICAL CEILING MECHANIC Building SUNM2010-016 | $12.00 | 0.00 | $12.00 |
| BOILERMAKER Building SUNM2010-016 | $21.77 | $3.98 | $25.75 |
| BRICKLAYER Building SUNM2010-016 | $20.80 | $5.10 | $25.90 |
| CARPENTER Building SUNM2010-016 (Batt Insulation Only) | $26.07 | $5.96 | $32.03 |
| CARPENTER (Form Work Only) Building SUNM2010-016 | $18.80 | $5.61 | $24.41 |
| CARPENTER Drywall Hanging and Drywall Finishing/Taping Only Building CARP1353-005 | $24.08 | $10.79 | $34.87 |
| CARPENTER, Excludes Acoustical Ceiling Installation, Batt Insulation, Drywall Finishing/Taping, Drywall Hanging, and Form Work Building SUNM2010-016 | $19.27 | $4.29 | $23.56 |
| CEMENT MASON/CONCRETE FINISHER Building SUNM2010-016 | $16.27 | $3.94 | $20.21 |
| DRYWALL FINISHER/TAPER Building SUNM2010-016 | $18.34 | $4.38 | $22.72 |
| ELECTRICIAN Zone 1 Building ELEC0611-019 | $40.30 | $13.41 | $53.71 |
| FLOOR LAYER: Carpet Building SUNM2010-016 | $18.05 | $4.49 | $22.54 |
| GLAZIER Building SUNM2010-016 | $20.15 | $3.63 | $23.78 |
| IRONWORKER, REINFORCING Building SUNM2010-016 | $19.75 | $8.71 | $28.46 |
| IRONWORKER, STRUCTURAL AND ORNAMENTAL Building IRON0495-010 | $28.05 | $18.11 | $46.16 |
| Laborer, Mason Tender Brick Building LABO0016-005 (3) | $23.69 | $7.89 | $31.58 |
| LABORER: Asphalt Raker Building SUNM2010-016 | $10.25 | 0.00 | $10.25 |
| LABORER: Common or General Building SUNM2010-016 | $13.78 | $3.56 | $17.34 |
| LABORER: Landscape & Irrigation Building SUNM2010-016 | $12.42 | $1.47 | $13.89 |
| LABORER: Mason Tender - Cement/Concrete Building SUNM2010-016 | $11.51 | $0.85 | $12.36 |
| LABORER: Pipelayer Building SUNM2010-016 | $13.78 | $2.20 | $15.98 |
| OPERATOR: Backhoe Building SUNM2010-016 | $18.79 | $3.47 | $22.26 |
| OPERATOR: Crane Building SUNM2010-016 | $24.38 | $4.60 | $28.98 |
| OPERATOR: Forklift Building SUNM2010-016 | $20.86 | $4.60 | $25.46 |
| OPERATOR: Grader/Blade Building SUNM2010-016 | $20.33 | $4.94 | $25.27 |
| OPERATOR: Loader (Front End) Building SUNM2010-016 | $19.76 | $4.84 | $24.60 |
| PAINTER: Brush and Roller, Excludes Drywall Finishing/Taping Building PAIN0823-007 | $24.00 | $7.00 | $31.00 |
| PAINTER: Spray Building SUNM2010-016 (Excludes Drywall Finishing/Taping) | $15.47 | $2.09 | $17.56 |
| PIPEFITTER Building PLUM0412-007 (Including HVAC Pipe Installation) | $43.07 | $16.60 | $59.67 |
| PLASTERER Building SUNM2010-016 | $17.65 | $5.29 | $22.94 |
| PLUMBER Building PLUM0412-007 (Excluding HVAC Pipe Installation) | $43.07 | $16.60 | $59.67 |
| Power Equipment Operator Building ENGI0953-013 (2) Roller(Dirt and Grade Compaction) | $26.75 | $4.65 | $31.40 |
| ROOFER Building SUNM2010-016 | $18.84 | 0.00 | $18.84 |
| Sheet Metal Worker Building SHEE0049-012 (HVAC Duct and System Installation Only) | $37.50 | $18.51 | $56.01 |
| SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building SUNM2010-016 | $22.01 | $9.65 | $31.66 |
| SPRINKLER FITTER Building SUNM2010-016 (Fire Sprinklers) | $20.00 | $4.16 | $24.16 |
| TILE FINISHER Building SUNM2010-016 | $14.02 | 0.00 | $14.02 |
| TILE SETTER Building SUNM2010-016 | $14.30 | $1.02 | $15.32 |
| TRUCK DRIVER: Dump Truck Building SUNM2010-016 | $11.00 | 0.00 | $11.00 |
| TRUCK DRIVER: Pickup Truck Building SUNM2010-016 | $15.91 | $3.13 | $19.04 |
| TRUCK DRIVER: Water Truck Building SUNM2010-016 | $15.16 | $4.69 | $19.85 |
No trade rates match your search and filter selection.
Building