NM20260034
rev 0Highway
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0076-008 | $36.66 | $11.83 | $48.49 |
| CARPENTER Building SUNM2016-005 (Drywall Finishing/Taping Only) | $19.64 | $3.91 | $23.55 |
| CARPENTER (Form Work Only) Heavy CARP1319-011 | $27.31 | $13.18 | $40.49 |
| CARPENTER (Includes Form Work) Highway SUNM2011-002 | $13.88 | $0.44 | $14.32 |
| CARPENTER, Excludes Drywall Finishing/Taping Building SUNM2016-005 | $20.86 | $6.25 | $27.11 |
| CARPENTER, Excludes Form Work Heavy SUNM2016-011 | $16.43 | 0.00 | $16.43 |
| CEMENT MASON/CONCRETE FINISHER Highway SUNM2011-002 | $14.60 | $0.26 | $14.86 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUNM2016-011 | $19.44 | $8.08 | $27.52 |
| CEMENT MASON/CONCRETE FINISHER Building SUNM2016-005 | $18.93 | $5.85 | $24.78 |
| ELECTRICIAN Highway SUNM2011-002 (Includes Traffic Signalization and Installation) | $25.06 | $8.56 | $33.62 |
| ELECTRICIAN Heavy ELEC0611-001 | $34.50 | $10.81 | $45.31 |
| ELECTRICIAN Building ELEC0611-022 | $40.30 | $13.41 | $53.71 |
| ELECTRICIAN (Boom Operator) Highway ELEC0611-003 | $29.79 | $12.74 | $42.53 |
| HIGHWAY/PARKING LOT STRIPING: Flagger/Cone Setter Highway SUNM2011-002 | $13.55 | $0.35 | $13.90 |
| HIGHWAY/PARKING LOT STRIPING: Includes Highway Line/Parking Lot Line Striping and Line Striping Truck Driver Highway SUNM2011-002 | $14.75 | $0.35 | $15.10 |
| HIGHWAY/PARKING LOT STRIPING: IRONWORKER, REINFORCING Highway SUNM2011-002 | $22.44 | $5.85 | $28.29 |
| HIGHWAY/PARKING LOT STRIPING: LABORER Common or General Highway SUNM2011-002 | $11.21 | $0.35 | $11.56 |
| HIGHWAY/PARKING LOT STRIPING: Mason Tender- Cement/Concrete Highway SUNM2011-002 | $10.25 | $0.35 | $10.60 |
| HIGHWAY/PARKING LOT STRIPING: Pipelayer Highway SUNM2011-002 | $17.13 | $5.04 | $22.17 |
| IRONWORKER, REINFORCING Heavy SUNM2016-011 | $27.80 | 0.00 | $27.80 |
| IRONWORKER, STRUCTURAL Building IRON0495-002 | $28.05 | $18.11 | $46.16 |
| LABORER: Common or General Heavy SUNM2016-011 | $15.34 | $3.63 | $18.97 |
| LABORER: Common or General Building SUNM2016-005 | $14.58 | $4.25 | $18.83 |
| LABORER: Mason Tender - Cement/Concrete Building SUNM2016-005 | $17.60 | 0.00 | $17.60 |
| LABORER: Pipelayer Heavy SUNM2016-011 | $16.67 | $3.04 | $19.71 |
| OPERATOR: Backhoe/Excavator/Trackhoe Heavy SUNM2016-011 | $21.12 | $6.18 | $27.30 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUNM2016-005 | $25.73 | $4.51 | $30.24 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Heavy SUNM2016-011 | $21.06 | 0.00 | $21.06 |
| OPERATOR: OPERATOR: Bulldozer Heavy SUNM2016-011 | $21.00 | 0.00 | $21.00 |
| OPERATOR: OPERATOR: Grader/Blade Heavy SUNM2016-011 | $19.02 | 0.00 | $19.02 |
| OPERATOR: OPERATOR: Loader Heavy SUNM2016-011 | $18.30 | 0.00 | $18.30 |
| OPERATOR: OPERATOR: Oiler Heavy SUNM2016-011 | $18.23 | 0.00 | $18.23 |
| OPERATOR: OPERATOR: Roller Heavy SUNM2016-011 | $18.83 | 0.00 | $18.83 |
| OPERATOR: PAINTER (Brush and Roller) Building SUNM2016-005 | $16.60 | $3.88 | $20.48 |
| OPERATOR: PAINTER: Spray Building SUNM2016-005 | $16.51 | $2.14 | $18.65 |
| OPERATOR: TRUCK DRIVER: Dump Truck Heavy SUNM2016-011 | $15.53 | 0.00 | $15.53 |
| PIPEFITTER Building PLUM0412-015 | $43.07 | $16.60 | $59.67 |
| PLUMBER Building PLUM0412-018 | $43.07 | $16.60 | $59.67 |
| POWER EQUIPMENT OPERATOR: Backhoe/Excavator/Trackhoe Highway SUNM2011-002 | $17.20 | $0.26 | $17.46 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUNM2011-002 | $12.00 | $0.26 | $12.26 |
| POWER EQUIPMENT OPERATOR: Broom/Sweeper Highway SUNM2011-002 | $16.67 | $1.57 | $18.24 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Highway SUNM2011-002 | $13.51 | $0.26 | $13.77 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Highway SUNM2011-002 | $17.64 | $1.51 | $19.15 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUNM2011-002 | $16.43 | $0.26 | $16.69 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUNM2011-002 | $23.24 | $1.51 | $24.75 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUNM2011-002 | $22.08 | $8.72 | $30.80 |
| POWER EQUIPMENT OPERATOR: Pickup Truck Highway SUNM2011-002 | $12.95 | $0.26 | $13.21 |
| POWER EQUIPMENT OPERATOR: Piledriver Highway SUNM2011-002 | $15.73 | $0.26 | $15.99 |
| POWER EQUIPMENT OPERATOR: Roller (Asphalt and Dirt) Highway SUNM2011-002 | $16.27 | $1.51 | $17.78 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUNM2011-002 | $15.22 | $0.26 | $15.48 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Dump Truck Highway SUNM2011-002 | $15.04 | $0.26 | $15.30 |
| POWER EQUIPMENT OPERATOR: Water Truck Highway SUNM2011-002 | $12.96 | $0.26 | $13.22 |
| Sheet Metal Worker Building SHEE0049-005 (Includes HVAC Duct Installation) | $37.50 | $18.51 | $56.01 |
No trade rates match your search and filter selection.
Highway
Heavy