Butler County in Ohio.

1 wage determination 37 trade rates

Popular Trades In Butler County in Ohio.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0008-010
$35.23 $23.04 $58.27
BRICKLAYER Building
SUOH2012-073
$24.73 $4.71 $29.44
CARPENTER Building
CARP0002-008 (Accoustical Ceiling Installation Only)
$32.26 $19.10 $51.36
CARPENTER Building
CARP0002-015 (Includes Drywall Hanging and Metal Stud Installation; Excludes Form Work)
$32.26 $19.10 $51.36
CEMENT MASON/CONCRETE FINISHER Building
SUOH2012-073
$32.38 $2.58 $34.96
ELECTRICIAN Building
ELEC0648-002 (Excludes Low Voltage Wiring)
$38.00 $24.16 $62.16
ELECTRICIAN Building
SUOH2012-073 (Low Voltage Wiring Only)
$22.62 $8.76 $31.38
ELEVATOR MECHANIC Building
ELEV0011-002
$57.41 $38.44 $95.84
GLAZIER Building
PAIN0387-002
$31.95 $18.20 $50.15
Grader/Blade Building
ENGI0066-045
$32.42 $19.66 $52.08
IRONWORKER Building
IRON0044-019 (Ornamental and Structural)
$37.77 $23.90 $61.67
IRONWORKER, REINFORCING Building
IRON0044-003
$38.27 $23.90 $62.17
LABORER Common or General; Form Work Building
LABO0534-002
$32.49 $14.45 $46.94
LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Building
SUOH2012-073
$26.19 $8.99 $35.18
LABORER: Landscape & Irrigation Building
SUOH2012-073
$23.60 $0.87 $24.47
LABORER: Mason Tender - Cement/Concrete Building
SUOH2012-073
$23.87 $9.80 $33.67
LABORER: Pipelayer Building
SUOH2012-073
$23.18 $8.95 $32.13
Mason Tender - Brick Building
LABO0534-002
$32.82 $14.45 $47.27
Mechanic Building
ENGI0066-045
$32.92 $19.66 $52.58
OPERATOR: Loader Building
SUOH2012-073
$29.66 $12.61 $42.27
OPERATOR: Paver Building
SUOH2012-073 (Asphalt, Aggregate, and Concrete)
$30.28 $13.29 $43.57
OPERATOR: Roller Building
SUOH2012-073
$29.85 $12.00 $41.85
PAINTER (Brush and Roller) Building
PAIN0123-001
$28.29 $13.75 $42.04
PAINTER: Spray Building
SUOH2012-073
$22.78 $12.40 $35.18
PIPEFITTER Building
PLUM0392-004 (Includes HVAC Pipe Installation, Excludes HVAC Unit Installation)
$43.30 $27.40 $70.70
PLASTERER Building
PLAS0132-019
$31.35 $17.65 $49.00
PLUMBER Building
PLUM0392-004 (Includes HVAC Unit Installation, Excludes HVAC Pipe Installation)
$43.30 $27.40 $70.70
POWER EQUIPMENT OPERATOR Bobcat/Skid Steer/Skid Loader Building
ENGI0018-037
$44.14 $16.41 $60.55
POWER EQUIPMENT OPERATOR Bulldozer; Crane Building
ENGI0018-038
$44.14 $16.41 $60.55
POWER EQUIPMENT OPERATOR Forklift Building
ENGI0066-045
$28.87 $19.66 $48.53
ROOFER Building
ROOF0042-007
$33.00 $19.42 $52.42
SHEET METAL WORKER Building
SHEE0024-025 (HVAC Duct Installation Only)
$31.23 $25.79 $57.02
SHEET METAL WORKER Building
SHEE0024-030 (Excluding HVAC Duct Installation)
$34.32 $23.77 $58.09
SPRINKLER FITTER Building
SFOH0669-009 (Fire Sprinklers)
$48.28 $28.08 $76.36
TILE FINISHER Building
BROH0018-009
$27.87 $16.31 $44.18
TILE SETTER Building
BROH0018-005
$32.41 $16.36 $48.77
TRUCK DRIVER: Dump (All Types) Building
SUOH2012-073
$24.32 $11.73 $36.05

Wage Determinations