OH20260021
rev 0Residential
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0084-004 | $39.02 | $26.40 | $65.42 |
| BRICK POINTER/CAULKER/CLEANER Building BROH0046-005 | $26.20 | $13.89 | $40.09 |
| BRICKLAYER Building BROH0008-006 | $33.48 | $23.51 | $56.99 |
| CARPENTER Residential SUOH2012-023 | $19.90 | $6.25 | $26.15 |
| CARPENTER Building SUOH2012-038 (Excluding Drywall Hanging and Metal Stud Installation, and Soft Floor Laying) | $23.19 | $10.50 | $33.69 |
| CEMENT MASON/CONCRETE FINISHER Residential BROH0046-001 | $34.53 | $23.04 | $57.57 |
| ELECTRICIAN Building ELEC0038-004 (HVAC/Temperature Controls Installation Only) | $46.63 | $24.92 | $71.55 |
| ELECTRICIAN Building SUOH2012-038 (Low Voltage Wiring Only) | $20.91 | $8.20 | $29.11 |
| ELECTRICIAN 1 to 3 stories Residential ELEC0064-005 | $24.00 | $13.49 | $37.49 |
| ELECTRICIAN, Excludes Low Voltage Wiring and Installation of HVAC/Temperature Controls Building SUOH2012-038 | $29.72 | $15.79 | $45.51 |
| ELEVATOR MECHANIC Building ELEV0037-003 | $57.33 | $38.44 | $95.77 |
| Forklift Building ENGI0018-023 | $42.98 | $16.41 | $59.39 |
| IRONWORKER Building IRON0550-011 (Ornamental and Structural) | $36.00 | $23.57 | $59.57 |
| LABORER Mason Tender - Cement/Concrete Building LABO0500-004 | $32.35 | $16.42 | $48.77 |
| LABORER: Common or General Residential SUOH2012-023 | $17.40 | $6.25 | $23.65 |
| LABORER: Pipelayer Building SUOH2012-038 | $18.37 | $4.79 | $23.16 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOH2012-038 | $30.20 | $12.96 | $43.16 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUOH2012-038 | $20.56 | $7.13 | $27.69 |
| OPERATOR: OPERATOR: Bulldozer Building SUOH2012-038 | $24.19 | $8.24 | $32.43 |
| OPERATOR: OPERATOR: Loader Building SUOH2012-038 | $19.87 | $5.91 | $25.78 |
| OPERATOR: OPERATOR: Paver Building SUOH2012-038 (Asphalt, Aggregate, and Concrete) | $25.85 | $10.42 | $36.27 |
| OPERATOR: OPERATOR: Roller Building SUOH2012-038 | $22.16 | $8.07 | $30.23 |
| OPERATOR: PAINTER (Brush and Roller) Building SUOH2012-038 | $20.91 | $10.49 | $31.40 |
| OPERATOR: PLUMBER Building SUOH2012-038 | $32.69 | $18.70 | $51.39 |
| OPERATOR: SPRINKLER FITTER Building SUOH2012-038 (Fire Sprinklers) | $28.89 | $10.53 | $39.42 |
| OPERATOR: TRUCK DRIVER: Dump (All Types) Building SUOH2012-038 | $18.88 | $4.14 | $23.02 |
| PAINTER Building PAIN0841-004 (Drywall Finishing/Taping Only) Drywall Taper | $33.43 | $18.15 | $51.58 |
| PIPEFITTER Building PLUM0050-009 (Excludes HVAC Pipe Installation) | $51.00 | $32.56 | $83.56 |
| POWER EQUIPMENT OPERATOR Residential ENGI0018-026 (Backhoe/Excavator) | $37.14 | $15.20 | $52.34 |
| POWER EQUIPMENT OPERATOR Crane Residential ENGI0066-028 | $36.92 | $24.06 | $60.98 |
| POWER EQUIPMENT OPERATOR Crane Building ENGI0018-023 | $44.14 | $16.41 | $60.55 |
| ROOFER Building ROOF0044-003 | $40.15 | $21.28 | $61.43 |
| SHEET METAL WORKER Residential SUOH2012-023 (HVAC Duct Installation Only) | $19.13 | $11.72 | $30.85 |
| SHEET METAL WORKER Building SHEE0033-042 (Excluding HVAC Duct and Unit Installation) | $38.36 | $29.59 | $67.95 |
| SOFT FLOOR LAYER Building CARP0373-001 | $37.52 | $23.50 | $61.02 |
| TILE FINISHER Building BROH0046-005 | $31.50 | $16.23 | $47.73 |
| TILE SETTER Building BROH0046-005 | $36.07 | $19.49 | $55.56 |
No trade rates match your search and filter selection.
Residential
Building