OH20260078
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ABATEMENT WORKER: ASBESTOS Building SUOH2012-080 (Removal from Ceilings, Floors, and Walls) | $22.74 | $9.25 | $31.99 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0008-010 | $35.23 | $23.04 | $58.27 |
| BRICKLAYER Building BROH0055-006 | $33.24 | $19.62 | $52.86 |
| Bulldozer Building ENGI0018-043 | $44.02 | $16.41 | $60.43 |
| CARPENTER Building CARP0200-003 (Soft Floor Layer and Floor Laying - Hardwood Floors Only) | $35.94 | $23.59 | $59.53 |
| CARPENTER Building CARP0200-004 (Excludes Acoustical Ceiling Installation) | $35.94 | $23.59 | $59.53 |
| CARPENTER Building SUOH2012-080 (Acoustical Ceiling Installation Only) | $24.17 | $8.61 | $32.78 |
| CEMENT MASON/CONCRETE FINISHER Building SUOH2012-080 | $26.07 | $12.34 | $38.41 |
| DRYWALL FINISHER/TAPER Building SUOH2012-080 | $20.81 | $5.27 | $26.08 |
| DRYWALL HANGER AND METAL STUD INSTALLER Building SUOH2012-080 | $21.75 | $3.11 | $24.86 |
| ELECTRICIAN Building ELEC0038-004 (HVAC/Temperature Controls Installation Only) | $46.63 | $24.92 | $71.55 |
| ELECTRICIAN Building ELEC0683-004 (Low Voltage Wiring Only) | $43.00 | $26.37 | $69.37 |
| ELECTRICIAN Building ELEC0683-007 (Excludes Installation of HVAC/Temperature Controls and Low Voltage Wiring) | $43.00 | $26.37 | $69.37 |
| ELEVATOR MECHANIC Building ELEV0037-003 | $57.33 | $38.44 | $95.77 |
| GLAZIER Building SUOH2012-080 | $22.60 | $11.02 | $33.62 |
| IRONWORKER Building IRON0172-006 (Reinforcing and Structural) | $40.87 | $23.15 | $64.02 |
| IRONWORKER, ORNAMENTAL Building IRON0550-009 | $36.00 | $23.57 | $59.57 |
| LABORER Mason Tender - Brick & Cement/Concrete Building LABO0423-003 | $32.10 | $14.20 | $46.30 |
| LABORER: Common or General Building SUOH2012-080 | $21.90 | $8.60 | $30.50 |
| LABORER: Landscape & Irrigation Building SUOH2012-080 | $22.18 | $8.15 | $30.33 |
| LABORER: Pipelayer Building SUOH2012-080 | $23.98 | $8.58 | $32.56 |
| Mechanic Building ENGI0066-048 | $32.92 | $19.66 | $52.58 |
| Oiler Building ENGI0018-043 | $36.34 | $16.41 | $52.75 |
| OPERATOR: Forklift Building SUOH2012-080 | $22.79 | $12.76 | $35.55 |
| OPERATOR: Loader Building SUOH2012-080 | $29.66 | $12.61 | $42.27 |
| OPERATOR: Paver Building SUOH2012-080 (Asphalt, Aggregate, and Concrete) | $30.28 | $13.29 | $43.57 |
| OPERATOR: Roller Building SUOH2012-080 | $28.83 | $12.72 | $41.55 |
| PAINTER (Brush and Roller) Building SUOH2012-080 | $23.87 | $9.42 | $33.29 |
| PAINTER (Spray) Building PAIN1275-001 | $29.70 | $14.91 | $44.61 |
| PIPEFITTER Building PLUM0189-005 | $43.25 | $26.94 | $70.19 |
| PLUMBER Building SUOH2012-080 | $25.74 | $6.45 | $32.19 |
| POWER EQUIPMENT OPERATOR Backhoe/Excavator/Trackhoe; Bobcat/Skid Steer/Skid Loader; Concrete Pump; Crane Building ENGI0018-043 | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR Grader/Blade Building ENGI0066-048 | $32.42 | $19.66 | $52.08 |
| ROOFER Building SUOH2012-080 | $25.33 | $11.37 | $36.70 |
| SHEET METAL WORKER Building SHEE0024-028 (Excludes HVAC Duct and Unit Installation) | $33.53 | $26.36 | $59.89 |
| SHEET METAL WORKER Building SUOH2012-080 (HVAC Duct and HVAC Unit Installation Only) | $26.26 | $17.79 | $44.05 |
| SPRINKLER FITTER Building SFOH0669-009 (Fire Sprinklers) | $48.28 | $28.08 | $76.36 |
| TILE FINISHER Building BROH0055-007 | $28.31 | $10.45 | $38.76 |
| TILE SETTER Building BROH0055-007 | $29.92 | $16.77 | $46.69 |
| TRUCK DRIVER: Dump (All Types) Building SUOH2012-080 | $24.32 | $11.73 | $36.05 |
No trade rates match your search and filter selection.
Building