OH20260084
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0003-002 | $43.88 | $26.93 | $70.81 |
| BRICK POINTER/CAULKER/CLEANER Building BROH0005-007 | $38.13 | $20.19 | $58.32 |
| BRICKLAYER Building BROH0016-003 | $38.01 | $20.64 | $58.65 |
| CARPENTER Building CARP0435-001 (Drywall Hanging and Metal Stud Installation Only) | $37.52 | $23.50 | $61.02 |
| CARPENTER: Building SUOH2012-086 (Excluding Drywall Hanging and Metal Stud Installation, Soft Floor Laying, and Form Work) | $28.26 | $12.11 | $40.37 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0404-001 | $35.58 | $23.71 | $59.29 |
| ELECTRICIAN Building ELEC0038-005 (Low Voltage Wiring Only) | $33.05 | $14.91 | $47.96 |
| ELECTRICIAN Building ELEC0038-010 (Including HVAC/Temperature Controls and Alarm Installation; Excluding Low Voltage Wiring) | $46.63 | $24.92 | $71.55 |
| ELEVATOR MECHANIC Building ELEV0017-002 | $63.79 | $38.44 | $102.22 |
| GLAZIER Building PAIN0181-001 | $34.82 | $20.80 | $55.62 |
| Grader/Blade Building ENGI0066-045 | $32.42 | $19.66 | $52.08 |
| IRONWORKER Ornamental, Reinforcing, & Structural Building IRON0017-011 | $36.83 | $29.01 | $65.84 |
| LABORER Common or General; Mason Tender - Brick & Cement/Concrete Building LABO0310-002 | $31.89 | $22.66 | $54.55 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Building SUOH2012-086 | $24.53 | $14.55 | $39.08 |
| Mechanic Building ENGI0066-045 | $32.92 | $19.66 | $52.58 |
| Oiler Building ENGI0018-042 | $36.93 | $16.41 | $53.34 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOH2012-086 | $30.95 | $10.20 | $41.15 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUOH2012-086 | $32.88 | $12.26 | $45.14 |
| OPERATOR: OPERATOR: Bulldozer Building SUOH2012-086 | $21.15 | $8.72 | $29.87 |
| OPERATOR: OPERATOR: Loader Building SUOH2012-086 | $29.66 | $12.61 | $42.27 |
| OPERATOR: OPERATOR: Paver Building SUOH2012-086 (Asphalt, Aggregate, and Concrete) | $31.48 | $12.80 | $44.28 |
| OPERATOR: OPERATOR: Roller Building SUOH2012-086 | $31.48 | $12.80 | $44.28 |
| OPERATOR: PAINTER: Spray Building SUOH2012-086 | $22.78 | $12.40 | $35.18 |
| OPERATOR: TRUCK DRIVER: Dump (All Types) Building SUOH2012-086 | $24.32 | $11.73 | $36.05 |
| PAINTER Building PAIN0707-003 (Drywall Finishing/Taping Only) | $35.45 | $20.20 | $55.65 |
| PAINTER (Brush and Roller) Building PAIN0707-002 | $32.35 | $19.45 | $51.80 |
| PILEDRIVERMAN Building CARP1090-001 | $36.34 | $27.50 | $63.84 |
| PIPEFITTER Building PLUM0120-009 (Includes HVAC Pipe Installation) | $49.17 | $28.55 | $77.72 |
| PLASTERER Building PLAS0031-018 (Including FLOOR LAYER: Floor Coating/Epoxy) | $29.51 | $15.67 | $45.18 |
| PLUMBER Building PLUM0055-002 (Excludes HVAC Pipe Installation) | $44.86 | $30.03 | $74.89 |
| POWER EQUIPMENT OPERATOR Crane Building ENGI0018-042 | $46.71 | $16.41 | $63.12 |
| POWER EQUIPMENT OPERATOR Forklift Building ENGI0066-045 | $28.87 | $19.66 | $48.53 |
| ROOFER Building ROOF0044-003 | $40.15 | $21.28 | $61.43 |
| SHEET METAL WORKER Building SHEE0033-044 (Including HVAC Duct and Unit Installation) | $43.06 | $30.11 | $73.17 |
| SOFT FLOOR LAYER Building CARP0373-001 | $37.52 | $23.50 | $61.02 |
| SPRINKLER FITTER Building PLUM0120-009 (Fire Sprinklers) | $49.17 | $28.55 | $77.72 |
| TILE FINISHER Building BROH0005-009 | $31.50 | $16.23 | $47.73 |
| TILE SETTER Building BROH0036-001 | $36.07 | $19.49 | $55.56 |
No trade rates match your search and filter selection.
Building