OH20260095
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0045-004 | $37.00 | $28.27 | $65.27 |
| BRICKLAYER Building BROH0046-006 | $36.53 | $24.03 | $60.56 |
| CARPENTER Building CARP0248-010 (Drywall Hanging and Metal Stud Installation Only) | $28.22 | $17.77 | $45.99 |
| CARPENTER Building SUOH2012-097 (Excluding Drywall Hanging and Metal Stud Installation) | $24.65 | $9.95 | $34.60 |
| CEMENT MASON/CONCRETE FINISHER Building SUOH2012-097 | $26.45 | $13.46 | $39.91 |
| DRYWALL FINISHER/TAPER Building SUOH2012-097 | $20.77 | $7.52 | $28.29 |
| ELECTRICIAN Building ELEC0008-015 (Excludes Low Voltage Wiring) | $48.40 | $23.06 | $71.46 |
| ELECTRICIAN Building ELEC0008-017 (Low Voltage Wiring Only) | $27.81 | $16.23 | $44.04 |
| ELECTRICIAN: CABLE PULLER Building ELEC0008-016 (Voice/Data/Video) | $13.02 | $14.19 | $27.21 |
| Fireproofer Building PAIN0007-004 | $34.66 | $23.88 | $58.54 |
| GLAZIER Building PAIN0948-002 | $36.50 | $25.06 | $61.56 |
| Grader/Blade Building ENGI0066-045 | $32.42 | $19.66 | $52.08 |
| IRONWORKER, ORNAMENTAL Building IRON0044-020 | $37.77 | $23.90 | $61.67 |
| IRONWORKER, REINFORCING Building SUOH2012-097 | $28.11 | $17.83 | $45.94 |
| IRONWORKER, STRUCTURAL Building IRON0055-012 (Including Metal Building Structural Frame Installation) | $35.50 | $29.20 | $64.70 |
| LABORER Common or General; Mason Tender - Cement/Concrete Building LABO0500-005 | $32.35 | $16.42 | $48.77 |
| LABORER: Mason Tender - Brick Building SUOH2012-097 | $18.39 | $11.04 | $29.43 |
| LABORER: Pipelayer Building SUOH2012-097 | $23.98 | $8.58 | $32.56 |
| Mechanic Building ENGI0066-045 | $32.92 | $19.66 | $52.58 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOH2012-097 | $29.99 | $10.13 | $40.12 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUOH2012-097 | $30.26 | $12.58 | $42.84 |
| OPERATOR: OPERATOR: Bulldozer Building SUOH2012-097 | $28.07 | $11.15 | $39.22 |
| OPERATOR: OPERATOR: Loader Building SUOH2012-097 | $29.66 | $12.61 | $42.27 |
| OPERATOR: OPERATOR: Paver Building SUOH2012-097 (Asphalt, Aggregate, and Concrete) | $30.28 | $13.29 | $43.57 |
| OPERATOR: OPERATOR: Roller Building SUOH2012-097 | $28.83 | $12.72 | $41.55 |
| OPERATOR: TRUCK DRIVER: Dump (All Types) Building SUOH2012-097 | $24.32 | $11.73 | $36.05 |
| PAINTER Brush and Roller Building PAIN0007-004 | $33.66 | $23.88 | $57.54 |
| PIPEFITTER Building PLUM0050-013 (Includes HVAC Pipe Installation) | $51.00 | $32.56 | $83.56 |
| PLASTERER Building PLAS0526-017 | $27.45 | $15.56 | $43.01 |
| PLUMBER Building PLUM0050-013 (Excludes HVAC Pipe Installation) | $51.00 | $32.56 | $83.56 |
| POWER EQUIPMENT OPERATOR Crane Building ENGI0018-044 | $44.02 | $16.41 | $60.43 |
| POWER EQUIPMENT OPERATOR Forklift Building ENGI0066-045 | $28.87 | $19.66 | $48.53 |
| ROOFER Building ROOF0134-006 | $29.07 | $19.84 | $48.91 |
| SHEET METAL WORKER Building SHEE0033-048 (Including HVAC Duct Installation) | $39.58 | $35.15 | $74.73 |
| Spray Building PAIN0007-004 | $34.66 | $23.88 | $58.54 |
| SPRINKLER FITTER Building SFOH0669-009 (Fire Sprinklers) | $48.28 | $28.08 | $76.36 |
| TERRAZZO WORKER/SETTER Building BROH0046-013 | $36.53 | $24.03 | $60.56 |
| TILE FINISHER Building BROH0046-013 | $30.78 | $23.04 | $53.82 |
| TILE SETTER Building BROH0046-013 | $36.53 | $24.03 | $60.56 |
No trade rates match your search and filter selection.
Building