| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICK POINTER/CAULKER/CLEANER Building BROH0046-007 | $36.53 | $24.03 | $60.56 |
| BRICKLAYER Building BROH0046-007 | $36.53 | $24.03 | $60.56 |
| CARPENTER Building SUOH2012-056 (Excluding Drywall Hanging and Metal Stud Installation, and Soft Floor Laying) | $25.17 | $14.56 | $39.73 |
| CEMENT MASON/CONCRETE FINISHER Building BROH0046-008 | $34.53 | $23.04 | $57.57 |
| ELECTRICIAN Building ELEC0008-014 (Excludes Low Voltage Wiring and Installation of Alarms/HVAC Temperature Controls) | $48.40 | $23.06 | $71.46 |
| ELECTRICIAN Building ELEC0038-004 (HVAC/Temperature Controls Installation Only) | $46.63 | $24.92 | $71.55 |
| ELECTRICIAN Building SUOH2012-056 (Low Voltage Wiring Only) | $20.91 | $8.20 | $29.11 |
| ELEVATOR MECHANIC Building ELEV0037-003 | $57.33 | $38.44 | $95.77 |
| Forklift Building ENGI0018-023 | $42.98 | $16.41 | $59.39 |
| IRONWORKER Building IRON0550-011 (Ornamental and Structural) | $36.00 | $23.57 | $59.57 |
| LABORER Common or General; Mason Tender - Cement/Concrete Building LABO0500-005 | $32.35 | $16.42 | $48.77 |
| LABORER: Pipelayer Building SUOH2012-056 | $18.37 | $4.79 | $23.16 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOH2012-056 | $30.20 | $12.96 | $43.16 |
| OPERATOR: OPERATOR: Bobcat/Skid Steer/Skid Loader Building SUOH2012-056 | $20.56 | $7.13 | $27.69 |
| OPERATOR: OPERATOR: Bulldozer Building SUOH2012-056 | $24.19 | $8.24 | $32.43 |
| OPERATOR: OPERATOR: Loader Building SUOH2012-056 | $19.87 | $5.91 | $25.78 |
| OPERATOR: OPERATOR: Paver Building SUOH2012-056 (Asphalt, Aggregate, and Concrete) | $25.85 | $10.42 | $36.27 |
| OPERATOR: OPERATOR: Roller Building SUOH2012-056 | $22.16 | $8.07 | $30.23 |
| OPERATOR: PAINTER (Brush and Roller) Building SUOH2012-056 | $20.91 | $10.49 | $31.40 |
| OPERATOR: PLUMBER Building SUOH2012-056 | $32.69 | $18.70 | $51.39 |
| OPERATOR: SPRINKLER FITTER Building SUOH2012-056 (Fire Sprinklers) | $28.89 | $10.53 | $39.42 |
| OPERATOR: TRUCK DRIVER: Dump (All Types) Building SUOH2012-056 | $18.88 | $4.14 | $23.02 |
| PAINTER Building PAIN0841-004 (Drywall Finishing/Taping Only) Drywall Taper | $33.43 | $18.15 | $51.58 |
| PIPEFITTER Building PLUM0050-009 (Excludes HVAC Pipe Installation) | $51.00 | $32.56 | $83.56 |
| PLASTERER Building PLAS0132-014 | $31.68 | $15.46 | $47.14 |
| POWER EQUIPMENT OPERATOR Crane Building ENGI0018-023 | $44.14 | $16.41 | $60.55 |
| ROOFER Building ROOF0044-003 | $40.15 | $21.28 | $61.43 |
| SHEET METAL WORKER Building SHEE0033-042 (Excluding HVAC Duct and Unit Installation) | $38.36 | $29.59 | $67.95 |
| SOFT FLOOR LAYER Building CARP0373-001 | $37.52 | $23.50 | $61.02 |
| TILE FINISHER Building BROH0046-007 | $30.78 | $23.04 | $53.82 |
| TILE SETTER Building BROH0046-007 | $36.53 | $24.03 | $60.56 |