OH20260103
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0008-010 | $35.23 | $23.04 | $58.27 |
| BRICKLAYER Building BROH0018-003 | $33.30 | $18.28 | $51.58 |
| CARPENTER Building CARP0002-018 (Includes Acoustical Ceiling Installation, Drywall Hanging and Metal Stud Installation; Excludes Form Work) | $32.26 | $19.10 | $51.36 |
| CARPENTER (Form Work Only) Building CARP0002-016 | $32.26 | $19.10 | $51.36 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0132-018 | $33.50 | $16.05 | $49.55 |
| ELECTRICIAN Building ELEC0648-002 (Excludes Low Voltage Wiring) | $38.00 | $24.16 | $62.16 |
| ELECTRICIAN Building SUOH2012-105 (Low Voltage Wiring Only) | $22.62 | $8.76 | $31.38 |
| ELEVATOR MECHANIC Building ELEV0011-002 | $57.41 | $38.44 | $95.84 |
| GLAZIER Building PAIN0387-002 | $31.95 | $18.20 | $50.15 |
| Grader/Blade Building ENGI0066-045 | $32.42 | $19.66 | $52.08 |
| IRONWORKER, ORNAMENTAL Building IRON0044-020 | $37.77 | $23.90 | $61.67 |
| IRONWORKER, REINFORCING Building IRON0044-003 | $38.27 | $23.90 | $62.17 |
| IRONWORKER, STRUCTURAL Building SUOH2012-105 | $25.24 | $17.80 | $43.04 |
| LABORER Mason Tender - Brick Building LABO0265-019 | $26.60 | $18.75 | $45.35 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Building SUOH2012-105 | $26.19 | $8.99 | $35.18 |
| LABORER: Common or General Building SUOH2012-105 | $23.09 | $7.41 | $30.50 |
| LABORER: Landscape & Irrigation Building SUOH2012-105 | $23.60 | $0.87 | $24.47 |
| LABORER: Mason Tender - Cement/Concrete Building SUOH2012-105 | $23.87 | $9.80 | $33.67 |
| LABORER: Pipelayer Building SUOH2012-105 | $23.18 | $8.95 | $32.13 |
| Mechanic Building ENGI0066-045 | $32.92 | $19.66 | $52.58 |
| OPERATOR: Loader Building SUOH2012-105 | $29.66 | $12.61 | $42.27 |
| OPERATOR: Paver Building SUOH2012-105 (Asphalt, Aggregate, and Concrete) | $30.28 | $13.29 | $43.57 |
| OPERATOR: Roller Building SUOH2012-105 | $29.85 | $12.00 | $41.85 |
| PAINTER (Brush and Roller) Building PAIN0123-001 | $28.29 | $13.75 | $42.04 |
| PAINTER: Spray Building SUOH2012-105 | $22.78 | $12.40 | $35.18 |
| PIPEFITTER Building PLUM0392-004 (Includes HVAC Pipe Installation, Excludes HVAC Unit Installation) | $43.30 | $27.40 | $70.70 |
| PLASTERER Building PLAS0132-019 | $31.35 | $17.65 | $49.00 |
| PLUMBER Building PLUM0392-004 (Includes HVAC Unit Installation, Excludes HVAC Pipe Installation) | $43.30 | $27.40 | $70.70 |
| POWER EQUIPMENT OPERATOR Backhoe/Excavator/Trackhoe; Bulldozer; Crane Building ENGI0018-036 | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR Bobcat/Skid Steer/Skid Loader Building ENGI0018-037 | $44.14 | $16.41 | $60.55 |
| POWER EQUIPMENT OPERATOR Forklift Building ENGI0066-045 | $28.87 | $19.66 | $48.53 |
| ROOFER Building ROOF0042-007 | $33.00 | $19.42 | $52.42 |
| SHEET METAL WORKER Building SHEE0024-029 (Including HVAC Duct Installation Only) | $34.32 | $23.77 | $58.09 |
| SPRINKLER FITTER Building SFOH0669-009 (Fire Sprinklers) | $48.28 | $28.08 | $76.36 |
| TILE FINISHER Building SUOH2012-105 | $22.31 | $10.24 | $32.55 |
| TILE SETTER Building BROH0018-005 | $32.41 | $16.36 | $48.77 |
| TRUCK DRIVER: Dump (All Types) Building SUOH2012-105 | $24.32 | $11.73 | $36.05 |
No trade rates match your search and filter selection.
Building