Choctaw in Oklahoma.

1 wage determination 33 trade rates

Popular Trades In Choctaw in Oklahoma.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BOILERMAKER Building
BOIL0592-001
$33.70 $24.41 $58.11
BRICKLAYER Building
SUOK2012-049
$20.00 0.00 $20.00
CARPENTER Building
SUOK2012-049 (Acoustical Ceiling Installation Only)
$16.24 0.00 $16.24
CARPENTER Building
SUOK2012-049 (Drywall Hanging Only)
$14.96 0.00 $14.96
CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, and Form Work Building
SUOK2012-049
$16.82 $2.82 $19.64
CEMENT MASON/CONCRETE FINISHER Building
SUOK2012-049
$14.50 0.00 $14.50
ELECTRICIAN Building
ELEC0301-005 Scope differs by code/WD
$26.60 $11.92 $38.52
ELECTRICIAN Building
ELEC0301-010 (Low Voltage Wiring, Alarm Installation and Sound and Communications Systems Installation Only)
$26.60 $11.92 $38.52
ELECTRICIAN Building
ELEC0584-010 Scope differs by code/WD
$38.38 $10.20 $48.58
ELECTRICIAN Building
ELEC0584-012 (Low Voltage Wiring, Alarm Installation and Sound and Communications Systems Installation Only)
$38.38 $10.20 $48.58
ELECTRICIAN Building
ELEC1141-014 Scope differs by code/WD
$41.40 $6.00 $47.40
ELECTRICIAN Building
ELEC1141-018 (Low Voltage Wiring, Alarm Installation and Sound and Communications Systems Installation Only)
$24.26 $6.00 $30.26
FLOOR LAYER Building
SUOK2012-049 (Hardwood and Carpet)
$18.74 $1.10 $19.84
FORM WORKER Building
SUOK2012-049
$16.79 $3.12 $19.91
GLAZIER Building
SUOK2012-049
$15.27 $1.46 $16.73
IRONWORKER, STRUCTURAL Building
IRON0584-010
$30.35 $16.83 $47.18
LABORER: Common or General Building
SUOK2012-049
$11.43 0.00 $11.43
LABORER: Mason Tender - Brick Building
SUOK2012-049
$12.00 0.00 $12.00
LABORER: Mason Tender - Cement/Concrete Building
SUOK2012-049
$13.04 0.00 $13.04
LABORER: Pipelayer Building
SUOK2012-049
$11.65 0.00 $11.65
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUOK2012-049
$16.83 0.00 $16.83
OPERATOR: OPERATOR: Forklift Building
SUOK2012-049
$18.02 0.00 $18.02
OPERATOR: PAINTER: Brush, Roller and Spray Building
SUOK2012-049
$12.32 0.00 $12.32
OPERATOR: ROOFER Building
SUOK2012-049
$15.00 $0.29 $15.29
OPERATOR: SPRINKLER FITTER Building
SUOK2012-049 (Fire Sprinklers)
$21.52 $6.00 $27.52
PIPEFITTER Building
PLUM0344-021 (Including installation of HVAC Electrical/Temperature Controls and HVAC Pipe Installation)
$41.00 $16.03 $57.03
PLUMBER Building
PLUM0344-006 (Excludes HVAC Pipe Installation)
$41.00 $16.03 $57.03
POWER EQUIPMENT OPERATOR: Group 1 Building
ENGI0627-018
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 2 Building
ENGI0627-018
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 3 Building
ENGI0627-018
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 4 Building
ENGI0627-018
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group10 Building
ENGI0627-018
$27.25 $19.05 $46.30
SHEET METAL WORKER Building
SHEE0270-009 (Including HVAC Duct Installation)
$35.49 $14.60 $50.09

Wage Determinations

Building

0 trades

Applies to

Atoka, Bryan, Choctaw in Oklahoma.