Cleveland County in Oklahoma.

2 wage determinations 52 trade rates

Popular Trades In Cleveland County in Oklahoma.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER Building
BROK0005-004
$26.92 $13.09 $40.01
BRICKLAYER Residential
BROK0005-001
$25.92 $11.89 $37.81
CARPENTER Building
SUOK2012-022 (Acoustical Ceiling Installation Only)
$14.13 0.00 $14.13
CARPENTER Residential
SUOK2017-001
$14.18 0.00 $14.18
CARPENTER (Form Work Only) Building
CARP0329-003
$27.79 $10.05 $37.84
CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation Building
SUOK2012-022
$15.58 $2.90 $18.48
CEMENT MASON/CONCRETE FINISHER Building
SUOK2012-022
$16.72 0.00 $16.72
CEMENT MASON/CONCRETE FINISHER Residential
SUOK2017-001
$18.46 0.00 $18.46
DRYWALL FINISHER/TAPER Building
SUOK2012-022
$16.70 $1.61 $18.31
DRYWALL HANGER, Includes Metal Stud Installation Building
SUOK2012-022
$11.50 0.00 $11.50
ELECTRICIAN Building
ELEC1141-029 (Low Voltage Wiring and Alarm Installation Only)
$24.26 $6.00 $30.26
ELECTRICIAN, Excludes Low Voltage Wiring and Installation of Alarms Building
SUOK2012-022
$20.81 $6.03 $26.84
ELECTRICIAN, Includes Low Voltage Wiring Residential
SUOK2017-001
$19.57 0.00 $19.57
ELEVATOR MECHANIC Building
ELEV0063-004
$53.40 $39.52 $92.92
FENCE ERECTOR Building
SUOK2012-022
$16.00 0.00 $16.00
GLAZIER Building
SUOK2012-022
$12.02 $2.42 $14.44
HVAC MECHANIC Building
SUOK2012-022 (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)
$21.64 $6.46 $28.10
HVAC MECHANIC Residential
SUOK2017-001 (HVAC Duct Installation Only)
$27.20 $14.32 $41.52
HVAC MECHANIC Residential
SUOK2017-001 (Installation of HVAC Unit Only)
$30.08 $12.42 $42.50
IRONWORKER Building
IRON0048-014 (Ornamental and Structural)
$32.10 $17.38 $49.48
IRONWORKER, REINFORCING Building
SUOK2012-022
$17.11 0.00 $17.11
IRONWORKER, STRUCTURAL Residential
SUOK2017-001
$17.10 $4.22 $21.32
LABORER: Common or General Building
SUOK2012-022
$10.86 0.00 $10.86
LABORER: Common or General Residential
SUOK2017-001
$13.00 0.00 $13.00
LABORER: Landscape Building
SUOK2012-022
$13.75 0.00 $13.75
LABORER: Mason Tender - Brick Building
SUOK2012-022
$12.00 0.00 $12.00
LABORER: Mason Tender - Cement/Concrete Building
SUOK2012-022
$13.00 $1.91 $14.91
LABORER: Pipelayer Building
SUOK2012-022
$13.40 0.00 $13.40
LABORER: Plaster Tender Building
SUOK2012-022
$12.20 0.00 $12.20
MILLWRIGHT Building
CARP0216-002
$32.75 $11.91 $44.66
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUOK2012-022
$21.25 $4.35 $25.60
OPERATOR: Backhoe/Excavator/Trackhoe Residential
SUOK2017-001
$17.02 $10.00 $27.02
OPERATOR: OPERATOR: Bulldozer Building
SUOK2012-022
$20.64 $2.35 $22.99
OPERATOR: OPERATOR: Grader/Blade Building
SUOK2012-022
$14.04 $1.70 $15.74
OPERATOR: OPERATOR: Loader (Front End) Building
SUOK2012-022
$16.18 0.00 $16.18
OPERATOR: OPERATOR: Paver Building
SUOK2012-022 (Asphalt, Aggregate, and Concrete)
$13.38 $1.54 $14.92
OPERATOR: PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping Building
SUOK2012-022
$11.53 0.00 $11.53
OPERATOR: PLASTERER Building
SUOK2012-022
$17.00 0.00 $17.00
OPERATOR: PLUMBER Residential
SUOK2017-001
$33.14 0.00 $33.14
OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building
SUOK2012-022
$19.45 $6.38 $25.83
OPERATOR: TRUCK DRIVER: Dump and Flatbed Truck Building
SUOK2012-022
$11.60 0.00 $11.60
PIPEFITTER Building
PLUM0344-023 (Including HVAC Pipe Installation, excluding HVAC Unit Installation)
$41.00 $16.03 $57.03
PLUMBER Building
PLUM0344-012 (Excludes HVAC Pipe and Unit Installation)
$41.00 $16.03 $57.03
POWER EQUIPMENT OPERATOR: Group 1 Building
ENGI0627-020
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 2 Building
ENGI0627-020
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 3 Building
ENGI0627-020
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 4 Building
ENGI0627-020
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group 8 Building
ENGI0627-020
$28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: Group10 Building
ENGI0627-020
$27.25 $19.05 $46.30
ROOFER Building
ROOF0143-001
$26.30 $10.34 $36.64
SHEET METAL WORKER Building
SHEE0124-010 (HVAC Duct Installation Only)
$33.38 $16.36 $49.74
SPRINKLER FITTER Building
SFOK0669-002 (Fire Sprinklers)
$39.05 $25.77 $64.82

Wage Determinations