OK20260044
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building BROK0005-004 | $26.92 | $13.09 | $40.01 |
| CARPENTER Building SUOK2012-024 (Drywall Hanging Only) | $15.07 | $1.22 | $16.29 |
| CARPENTER, Excludes Drywall Hanging, and Form Work Building SUOK2012-024 | $14.58 | $1.57 | $16.15 |
| CAULKER Building SUOK2012-024 | $20.00 | $1.61 | $21.61 |
| CEMENT MASON/CONCRETE FINISHER Building SUOK2012-024 | $14.26 | $1.27 | $15.53 |
| DRYWALL FINISHER/TAPER Building SUOK2012-024 | $13.00 | 0.00 | $13.00 |
| ELECTRICIAN Building ELEC0584-006 (Excludes Low Voltage Wiring and Installation of Alarms and Sound and Communication Systems) | $38.38 | $10.20 | $48.58 |
| ELECTRICIAN Building SUOK2012-024 (Alarm Installation) | $19.00 | $3.20 | $22.20 |
| ELECTRICIAN Building SUOK2012-024 (Low Voltage Wiring) | $20.79 | $3.85 | $24.64 |
| ELECTRICIAN Building SUOK2012-024 (Sound and Communications Systems Installation) | $20.66 | $2.64 | $23.30 |
| ELEVATOR MECHANIC Building ELEV0083-003 | $51.24 | $38.44 | $89.68 |
| FORM WORKER Building SUOK2012-024 | $13.77 | $0.38 | $14.15 |
| HVAC MECHANIC Building PLUM0430-019 (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct) | $36.65 | $16.03 | $52.68 |
| IRONWORKER Building IRON0584-025 (Ornamental, Reinforcing and Structural) | $30.35 | $16.83 | $47.18 |
| LABORER: Common or General Building SUOK2012-024 | $10.21 | 0.00 | $10.21 |
| LABORER: Mason Tender - Brick Building SUOK2012-024 | $12.52 | 0.00 | $12.52 |
| LABORER: Mason Tender - Cement/Concrete Building SUOK2012-024 | $13.00 | $1.91 | $14.91 |
| LABORER: Pipelayer Building SUOK2012-024 | $12.39 | 0.00 | $12.39 |
| OPERATOR: Asphalt Paver Building SUOK2012-024 | $16.88 | 0.00 | $16.88 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOK2012-024 | $17.23 | $4.08 | $21.31 |
| OPERATOR: OPERATOR: Bulldozer Building SUOK2012-024 | $20.64 | $2.35 | $22.99 |
| OPERATOR: OPERATOR: Grader/Blade Building SUOK2012-024 | $14.28 | $1.70 | $15.98 |
| OPERATOR: OPERATOR: Loader (Front End) Building SUOK2012-024 | $16.18 | 0.00 | $16.18 |
| OPERATOR: PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping Building SUOK2012-024 | $12.22 | 0.00 | $12.22 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUOK2012-024 | $22.18 | $5.06 | $27.24 |
| OPERATOR: SPRINKLER FITTER Building SUOK2012-024 (Fire Sprinklers) | $21.86 | $1.19 | $23.05 |
| OPERATOR: TRUCK DRIVER: Dump and Flatbed Truck Building SUOK2012-024 | $11.00 | 0.00 | $11.00 |
| PIPEFITTER Building PLUM0430-020 (Including HVAC Pipe Installation, excluding HVAC Unit Installation) | $36.65 | $16.03 | $52.68 |
| PLUMBER Building PLUM0430-010 (Excludes HVAC Pipe and Unit Installation) | $36.65 | $16.03 | $52.68 |
| POWER EQUIPMENT OPERATOR: Group 1 Building ENGI0627-020 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Building ENGI0627-020 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Building ENGI0627-020 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Building ENGI0627-020 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 8 Building ENGI0627-020 | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: Group10 Building ENGI0627-020 | $27.25 | $19.05 | $46.30 |
| ROOFER Building ROOF0143-001 | $26.30 | $10.34 | $36.64 |
| SHEET METAL WORKER Building SHEE0270-006 (HVAC Duct Installation Only) | $35.49 | $14.60 | $50.09 |
No trade rates match your search and filter selection.
Building