OK20260040
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER Building BOIL0592-001 | $33.70 | $24.41 | $58.11 |
| BRICKLAYER Building SUOK2012-020 | $20.00 | 0.00 | $20.00 |
| CARPENTER Building SUOK2012-020 (Acoustical Ceiling Installation Only) | $16.24 | 0.00 | $16.24 |
| CARPENTER Building SUOK2012-020 (Drywall Hanging Only) | $14.96 | 0.00 | $14.96 |
| CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, and Form Work Building SUOK2012-020 | $16.82 | $2.82 | $19.64 |
| CEMENT MASON/CONCRETE FINISHER Building SUOK2012-020 | $14.50 | 0.00 | $14.50 |
| ELECTRICIAN Building ELEC1141-007 Scope differs by code/WD | $41.40 | $6.00 | $47.40 |
| ELECTRICIAN Building ELEC1141-028 (Low Voltage Wiring, Alarm Installation, and Sound and Communications Systems Installation Only) | $24.26 | $6.00 | $30.26 |
| FLOOR LAYER Building SUOK2012-020 (Hardwood and Carpet) | $18.74 | $1.10 | $19.84 |
| FORM WORKER Building SUOK2012-020 | $16.79 | $3.12 | $19.91 |
| GLAZIER Building SUOK2012-020 | $15.27 | $1.46 | $16.73 |
| IRONWORKER, STRUCTURAL Building IRON0048-009 | $32.10 | $17.38 | $49.48 |
| LABORER: Common or General Building SUOK2012-020 | $11.00 | 0.00 | $11.00 |
| LABORER: Mason Tender - Brick Building SUOK2012-020 | $12.00 | 0.00 | $12.00 |
| LABORER: Mason Tender - Cement/Concrete Building SUOK2012-020 | $13.04 | 0.00 | $13.04 |
| LABORER: Pipelayer Building SUOK2012-020 | $11.65 | 0.00 | $11.65 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOK2012-020 | $16.83 | 0.00 | $16.83 |
| OPERATOR: OPERATOR: Forklift Building SUOK2012-020 | $18.02 | 0.00 | $18.02 |
| OPERATOR: PAINTER: Brush, Roller and Spray Building SUOK2012-020 | $12.32 | 0.00 | $12.32 |
| OPERATOR: ROOFER Building SUOK2012-020 | $15.00 | $0.29 | $15.29 |
| OPERATOR: SPRINKLER FITTER Building SUOK2012-020 (Fire Sprinklers) | $21.52 | $6.00 | $27.52 |
| PIPEFITTER Building PLUM0344-021 (Including installation of HVAC Electrical/Temperature Controls and HVAC Pipe Installation) | $41.00 | $16.03 | $57.03 |
| PLUMBER Building PLUM0344-006 (Excludes HVAC Pipe Installation) | $41.00 | $16.03 | $57.03 |
| POWER EQUIPMENT OPERATOR: Group 1 Building ENGI0627-019 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Building ENGI0627-019 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Building ENGI0627-019 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Building ENGI0627-019 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group10 Building ENGI0627-019 | $27.25 | $19.05 | $46.30 |
| SHEET METAL WORKER Building SHEE0124-014 (Including HVAC Duct Installation) | $33.38 | $16.36 | $49.74 |