| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building BROK0005-004 | $26.92 | $13.09 | $40.01 |
| CARPENTER Building SUOK2012-027 (Acoustical Ceiling Installation Only) | $14.45 | 0.00 | $14.45 |
| CARPENTER Building SUOK2012-027 (Drywall Hanging and Metal Stud Installation Only) | $14.08 | 0.00 | $14.08 |
| CARPENTER (Form Work Only) Building CARP0329-003 | $27.79 | $10.05 | $37.84 |
| CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation Building SUOK2012-027 | $16.31 | $2.96 | $19.27 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUOK2012-003 | $12.49 | $1.23 | $13.72 |
| CEMENT MASON/CONCRETE FINISHER Building SUOK2012-027 | $16.72 | 0.00 | $16.72 |
| DRYWALL FINISHER/TAPER Building SUOK2012-027 | $14.25 | 0.00 | $14.25 |
| ELECTRICIAN Heavy SUOK2012-003 | $22.00 | $4.76 | $26.76 |
| ELECTRICIAN Building ELEC1141-007 Scope differs by code/WD | $41.40 | $6.00 | $47.40 |
| ELECTRICIAN Building ELEC1141-029 (Low Voltage Wiring and Alarm Installation Only) | $24.26 | $6.00 | $30.26 |
| ELEVATOR MECHANIC Building ELEV0063-004 | $53.40 | $39.52 | $92.92 |
| FENCE ERECTOR Building SUOK2012-027 | $16.00 | 0.00 | $16.00 |
| FORM WORKER Heavy SUOK2012-003 | $11.77 | 0.00 | $11.77 |
| GLAZIER Building SUOK2012-027 | $12.02 | $2.42 | $14.44 |
| HVAC MECHANIC Building SUOK2012-027 (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct) | $21.64 | $6.46 | $28.10 |
| IRONWORKER Building IRON0048-014 (Ornamental and Structural) | $32.10 | $17.38 | $49.48 |
| IRONWORKER, REINFORCING Building SUOK2012-027 | $17.11 | 0.00 | $17.11 |
| IRONWORKER, STRUCTURAL Heavy IRON0048-006 | $32.10 | $17.38 | $49.48 |
| LABORER: Common or General Heavy SUOK2012-003 | $11.81 | $1.09 | $12.90 |
| LABORER: Common or General Building SUOK2012-027 | $11.40 | 0.00 | $11.40 |
| LABORER: Landscape Building SUOK2012-027 | $13.75 | 0.00 | $13.75 |
| LABORER: Mason Tender - Brick Building SUOK2012-027 | $12.00 | 0.00 | $12.00 |
| LABORER: Mason Tender - Cement/Concrete Building SUOK2012-027 | $13.00 | $1.91 | $14.91 |
| LABORER: Pipelayer Heavy SUOK2012-003 | $11.13 | 0.00 | $11.13 |
| LABORER: Pipelayer Building SUOK2012-027 | $12.39 | 0.00 | $12.39 |
| LABORER: Plaster Tender Building SUOK2012-027 | $12.00 | 0.00 | $12.00 |
| MILLWRIGHT Building CARP0216-002 | $32.75 | $11.91 | $44.66 |
| OPERATOR: Backhoe/Excavator Heavy SUOK2012-003 | $18.17 | $6.28 | $24.45 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOK2012-027 | $21.25 | $4.35 | $25.60 |
| OPERATOR: Drill Heavy SUOK2012-003 | $17.15 | $0.78 | $17.93 |
| OPERATOR: Grader/Blade Heavy SUOK2012-003 | $17.76 | $3.87 | $21.63 |
| OPERATOR: Loader (Front End) Heavy SUOK2012-003 | $13.51 | 0.00 | $13.51 |
| OPERATOR: Mechanic Heavy SUOK2012-003 | $19.61 | $9.39 | $29.00 |
| OPERATOR: OPERATOR: Bulldozer Building SUOK2012-027 | $20.64 | $2.35 | $22.99 |
| OPERATOR: OPERATOR: Grader/Blade Building SUOK2012-027 | $14.28 | $1.70 | $15.98 |
| OPERATOR: OPERATOR: Loader (Front End) Building SUOK2012-027 | $16.18 | 0.00 | $16.18 |
| OPERATOR: OPERATOR: Paver Building SUOK2012-027 (Asphalt, Aggregate, and Concrete) | $13.38 | $1.54 | $14.92 |
| OPERATOR: PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping Building SUOK2012-027 | $12.17 | 0.00 | $12.17 |
| OPERATOR: PLASTERER Building SUOK2012-027 | $17.50 | 0.00 | $17.50 |
| OPERATOR: Scraper Heavy SUOK2012-003 | $16.00 | $1.55 | $17.55 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUOK2012-027 | $19.45 | $6.38 | $25.83 |
| OPERATOR: Trackhoe Heavy SUOK2012-003 | $17.50 | $2.78 | $20.28 |
| OPERATOR: TRUCK DRIVER: Dump and Flatbed Truck Building SUOK2012-027 | $11.60 | 0.00 | $11.60 |
| PIPEFITTER Building PLUM0344-023 (Including HVAC Pipe Installation, excluding HVAC Unit Installation) | $41.00 | $16.03 | $57.03 |
| PLUMBER Building PLUM0344-012 (Excludes HVAC Pipe and Unit Installation) | $41.00 | $16.03 | $57.03 |
| POWER EQUIPMENT OPERATOR: Group 1 Heavy ENGI0627-015 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 1 Building ENGI0627-020 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Heavy ENGI0627-015 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 2 Building ENGI0627-020 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Heavy ENGI0627-015 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 3 Building ENGI0627-020 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Heavy ENGI0627-015 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 4 Building ENGI0627-020 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 6 Heavy ENGI0627-015 | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: Group 8 Building ENGI0627-020 | $28.77 | $19.05 | $47.82 |
| POWER EQUIPMENT OPERATOR: Group10 Heavy ENGI0627-015 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Group10 Building ENGI0627-020 | $27.25 | $19.05 | $46.30 |
| ROOFER Building ROOF0143-001 | $26.30 | $10.34 | $36.64 |
| SHEET METAL WORKER Building SHEE0124-010 (HVAC Duct Installation Only) | $33.38 | $16.36 | $49.74 |
| SPRINKLER FITTER Building SFOK0669-002 (Fire Sprinklers) | $39.05 | $25.77 | $64.82 |
| TRUCK DRIVER: Dump Truck Heavy SUOK2012-003 | $16.50 | $0.74 | $17.24 |