| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER Building BROK0005-004 | $26.92 | $13.09 | $40.01 |
| BRICKLAYER Residential BROK0005-001 | $25.92 | $11.89 | $37.81 |
| CARPENTER Building SUOK2012-029 (Acoustical Ceiling Installation Only) | $14.98 | 0.00 | $14.98 |
| CARPENTER Residential SUOK2017-002 | $14.18 | 0.00 | $14.18 |
| CARPENTER (Form Work Only) Building CARP0329-003 | $27.79 | $10.05 | $37.84 |
| CARPENTER (Includes Form Work) Highway SUOK2011-002 | $12.78 | $0.00 | $12.78 |
| CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation Building SUOK2012-029 | $16.61 | $3.00 | $19.61 |
| CEMENT MASON/CONCRETE FINISHER Highway SUOK2011-002 | $12.50 | $0.00 | $12.50 |
| CEMENT MASON/CONCRETE FINISHER Heavy SUOK2012-004 | $12.49 | $1.23 | $13.72 |
| CEMENT MASON/CONCRETE FINISHER Building SUOK2012-029 | $16.75 | 0.00 | $16.75 |
| CEMENT MASON/CONCRETE FINISHER Residential SUOK2017-002 | $18.57 | 0.00 | $18.57 |
| Common or General Highway SUOK2011-002 | $10.64 | $0.00 | $10.64 |
| DRYWALL FINISHER/TAPER Building SUOK2012-029 | $13.74 | 0.00 | $13.74 |
| DRYWALL HANGER, Includes Metal Stud Installation Building SUOK2012-029 | $14.38 | 0.00 | $14.38 |
| ELECTRICIAN Heavy SUOK2012-004 | $22.86 | $5.61 | $28.47 |
| ELECTRICIAN Building ELEC1141-010 (Excludes Low Voltage Wiring and Installation of Alarms) | $41.40 | $6.00 | $47.40 |
| ELECTRICIAN Building ELEC1141-030 (Low Voltage Wiring Only) | $24.26 | $6.00 | $30.26 |
| ELECTRICIAN Building SUOK2012-029 (Alarm Installation) | $20.97 | $5.22 | $26.19 |
| ELECTRICIAN, Includes Low Voltage Wiring Residential SUOK2017-002 | $23.14 | 0.00 | $23.14 |
| ELEVATOR MECHANIC Building ELEV0063-004 | $53.40 | $39.52 | $92.92 |
| FENCE ERECTOR Building SUOK2012-029 | $14.00 | 0.00 | $14.00 |
| FORM WORKER Heavy SUOK2012-004 | $11.77 | 0.00 | $11.77 |
| GLAZIER Building SUOK2012-029 | $12.02 | $2.42 | $14.44 |
| HVAC MECHANIC Building PLUM0344-019 (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct) | $38.25 | $15.54 | $53.79 |
| HVAC MECHANIC Residential SUOK2017-002 (HVAC Duct Installation Only) | $27.20 | $14.32 | $41.52 |
| HVAC MECHANIC Residential SUOK2017-002 (Installation of HVAC Unit Only) | $30.91 | $12.42 | $43.33 |
| IRONWORKER Heavy IRON0048-005 (Structural, Reinforcing, and Ornamental) | $32.10 | $17.38 | $49.48 |
| IRONWORKER Building IRON0048-014 (Ornamental and Structural) | $32.10 | $17.38 | $49.48 |
| IRONWORKER, REINFORCING Highway SUOK2011-002 | $13.00 | $0.00 | $13.00 |
| IRONWORKER, REINFORCING Building SUOK2012-029 | $17.11 | 0.00 | $17.11 |
| IRONWORKER, STRUCTURAL Highway SUOK2011-002 | $14.21 | $0.00 | $14.21 |
| IRONWORKER, STRUCTURAL Residential SUOK2017-002 | $17.10 | $4.22 | $21.32 |
| LABORER Asphalt Raker and Shoveler Highway SUOK2011-002 | $11.31 | $0.00 | $11.31 |
| LABORER: Common or General Heavy SUOK2012-004 | $11.02 | 0.00 | $11.02 |
| LABORER: Common or General Building SUOK2012-029 | $11.70 | 0.00 | $11.70 |
| LABORER: Common or General Residential SUOK2017-002 | $13.00 | 0.00 | $13.00 |
| LABORER: Landscape Building SUOK2012-029 | $13.75 | 0.00 | $13.75 |
| LABORER: Mason Tender - Brick Building SUOK2012-029 | $12.00 | 0.00 | $12.00 |
| LABORER: Mason Tender - Cement/Concrete Building SUOK2012-029 | $13.00 | $1.91 | $14.91 |
| LABORER: Pipelayer Heavy SUOK2012-004 | $11.13 | 0.00 | $11.13 |
| LABORER: Pipelayer Building SUOK2012-029 | $12.39 | 0.00 | $12.39 |
| LABORER: Plaster Tender Building SUOK2012-029 | $11.00 | 0.00 | $11.00 |
| Landscape Highway SUOK2011-002 | $9.63 | $0.00 | $9.63 |
| MILLWRIGHT Building CARP0216-002 | $32.75 | $11.91 | $44.66 |
| OPERATOR: Backhoe/Excavator Heavy SUOK2012-004 | $18.17 | $6.28 | $24.45 |
| OPERATOR: Backhoe/Excavator/Trackhoe Building SUOK2012-029 | $21.25 | $4.35 | $25.60 |
| OPERATOR: Backhoe/Excavator/Trackhoe Residential SUOK2017-002 | $16.12 | $10.00 | $26.12 |
| OPERATOR: Drill Heavy SUOK2012-004 | $17.15 | $0.78 | $17.93 |
| OPERATOR: Grader/Blade Heavy SUOK2012-004 | $17.76 | $3.87 | $21.63 |
| OPERATOR: Loader (Front End) Heavy SUOK2012-004 | $13.51 | 0.00 | $13.51 |
| OPERATOR: Mechanic Heavy SUOK2012-004 | $19.61 | $9.39 | $29.00 |
| OPERATOR: OPERATOR: Bulldozer Building SUOK2012-029 | $20.64 | $2.35 | $22.99 |
| OPERATOR: OPERATOR: Forklift Building SUOK2012-029 | $20.55 | 0.00 | $20.55 |
| OPERATOR: OPERATOR: Grader/Blade Building SUOK2012-029 | $14.28 | $1.70 | $15.98 |
| OPERATOR: OPERATOR: Loader (Front End) Building SUOK2012-029 | $16.18 | 0.00 | $16.18 |
| OPERATOR: OPERATOR: Paver Building SUOK2012-029 (Asphalt, Aggregate, and Concrete) | $13.38 | $1.54 | $14.92 |
| OPERATOR: PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping Building SUOK2012-029 | $12.42 | 0.00 | $12.42 |
| OPERATOR: PLASTERER Building SUOK2012-029 | $16.10 | 0.00 | $16.10 |
| OPERATOR: PLUMBER Residential SUOK2017-002 | $33.14 | 0.00 | $33.14 |
| OPERATOR: Scraper Heavy SUOK2012-004 | $16.00 | $1.55 | $17.55 |
| OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building SUOK2012-029 | $17.57 | $4.64 | $22.21 |
| OPERATOR: Trackhoe Heavy SUOK2012-004 | $17.50 | $2.78 | $20.28 |
| OPERATOR: TRUCK DRIVER: Dump and Flatbed Truck Building SUOK2012-029 | $11.60 | 0.00 | $11.60 |
| PIPEFITTER Building PLUM0344-024 (Including HVAC Pipe Installation) | $41.00 | $16.03 | $57.03 |
| Pipelayer Highway SUOK2011-002 | $12.84 | $0.00 | $12.84 |
| PLUMBER Building PLUM0344-006 (Excludes HVAC Pipe Installation) | $41.00 | $16.03 | $57.03 |
| POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway SUOK2011-002 | $12.44 | $0.00 | $12.44 |
| POWER EQUIPMENT OPERATOR: Asphalt Paving Machine Highway SUOK2011-002 | $14.34 | $0.00 | $14.34 |
| POWER EQUIPMENT OPERATOR: Backhoe/Trackhoe Highway SUOK2011-002 | $13.78 | $0.00 | $13.78 |
| POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway SUOK2011-002 | $12.79 | $0.00 | $12.79 |
| POWER EQUIPMENT OPERATOR: Broom Highway SUOK2011-002 | $11.97 | $0.00 | $11.97 |
| POWER EQUIPMENT OPERATOR: Bulldozer Highway SUOK2011-002 | $15.09 | $0.00 | $15.09 |
| POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway SUOK2011-002 | $13.61 | $0.00 | $13.61 |
| POWER EQUIPMENT OPERATOR: Concrete Saw Highway SUOK2011-002 | $11.69 | $0.00 | $11.69 |
| POWER EQUIPMENT OPERATOR: Crane Highway SUOK2011-002 | $17.03 | $0.00 | $17.03 |
| POWER EQUIPMENT OPERATOR: Distributor Truck Highway SUOK2011-002 | $13.81 | $0.00 | $13.81 |
| POWER EQUIPMENT OPERATOR: Excavator Highway SUOK2011-002 | $15.85 | $0.00 | $15.85 |
| POWER EQUIPMENT OPERATOR: Flatbed Truck Highway SUOK2011-002 | $14.69 | $0.00 | $14.69 |
| POWER EQUIPMENT OPERATOR: Grader/Blade Highway SUOK2011-002 | $16.36 | $0.00 | $16.36 |
| POWER EQUIPMENT OPERATOR: Group 1 Heavy ENGI0627-015 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 1 Building ENGI0627-023 | $38.09 | $19.05 | $57.14 |
| POWER EQUIPMENT OPERATOR: Group 2 Heavy ENGI0627-015 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 2 Building ENGI0627-023 | $36.14 | $19.05 | $55.19 |
| POWER EQUIPMENT OPERATOR: Group 3 Heavy ENGI0627-015 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 3 Building ENGI0627-023 | $35.40 | $19.05 | $54.45 |
| POWER EQUIPMENT OPERATOR: Group 4 Heavy ENGI0627-015 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 4 Building ENGI0627-023 | $34.07 | $19.05 | $53.12 |
| POWER EQUIPMENT OPERATOR: Group 6 Heavy ENGI0627-015 | $30.87 | $19.05 | $49.92 |
| POWER EQUIPMENT OPERATOR: Group10 Heavy ENGI0627-015 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Group10 Building ENGI0627-023 | $27.25 | $19.05 | $46.30 |
| POWER EQUIPMENT OPERATOR: Loader (Front End) Highway SUOK2011-002 | $12.95 | $0.00 | $12.95 |
| POWER EQUIPMENT OPERATOR: Lowboy/Float Highway SUOK2011-002 | $13.90 | $0.00 | $13.90 |
| POWER EQUIPMENT OPERATOR: Mechanic Highway SUOK2011-002 | $15.61 | $0.00 | $15.61 |
| POWER EQUIPMENT OPERATOR: Milling Machine Highway SUOK2011-002 | $14.62 | $0.00 | $14.62 |
| POWER EQUIPMENT OPERATOR: Mixer Highway SUOK2011-002 | $14.43 | $0.00 | $14.43 |
| POWER EQUIPMENT OPERATOR: Off the Road Truck Highway SUOK2011-002 | $14.39 | $0.00 | $14.39 |
| POWER EQUIPMENT OPERATOR: Oiler Highway SUOK2011-002 | $14.06 | $0.00 | $14.06 |
| POWER EQUIPMENT OPERATOR: Pickup Truck Highway SUOK2011-002 | $12.48 | $0.00 | $12.48 |
| POWER EQUIPMENT OPERATOR: Roller (Asphalt) Highway SUOK2011-002 | $13.02 | $0.00 | $13.02 |
| POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway SUOK2011-002 | $12.36 | $0.00 | $12.36 |
| POWER EQUIPMENT OPERATOR: Scraper Highway SUOK2011-002 | $13.55 | $0.00 | $13.55 |
| POWER EQUIPMENT OPERATOR: Striping Machine Highway SUOK2011-002 | $12.56 | $0.00 | $12.56 |
| POWER EQUIPMENT OPERATOR: Tandem Axle/Semi Trailer Highway SUOK2011-002 | $14.64 | $0.00 | $14.64 |
| POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway SUOK2011-002 | $16.50 | $0.00 | $16.50 |
| POWER EQUIPMENT OPERATOR: Trencher Highway SUOK2011-002 | $13.66 | $0.00 | $13.66 |
| POWER EQUIPMENT OPERATOR: TRUCK DRIVER Dump Truck Highway SUOK2011-002 | $13.08 | $0.00 | $13.08 |
| POWER EQUIPMENT OPERATOR: Water Truck Highway SUOK2011-002 | $12.00 | $0.00 | $12.00 |
| Power Tool Operator Highway SUOK2011-002 (Includes Chipping Guns and Handheld Concrete Saws) | $12.89 | $0.00 | $12.89 |
| ROOFER Building ROOF0143-001 | $26.30 | $10.34 | $36.64 |
| SHEET METAL WORKER Building SHEE0124-010 (HVAC Duct Installation Only) | $33.38 | $16.36 | $49.74 |
| SPRINKLER FITTER Building SFOK0669-002 (Fire Sprinklers) | $39.05 | $25.77 | $64.82 |
| Traffic Control Highway SUOK2011-002 (Includes Flagger, Setting Up and Moving Cones/Barrels) | $11.69 | $0.00 | $11.69 |
| Traffic signal installer Highway SUOK2011-002 | $17.37 | $0.00 | $17.37 |
| TRUCK DRIVER: Dump Truck Heavy SUOK2012-004 | $16.50 | $0.74 | $17.24 |