Payne County in Oklahoma.

2 wage determinations 48 trade rates

Popular Trades In Payne County in Oklahoma.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BOILERMAKER Building
BOIL0592-001
$33.70 $24.41 $58.11
BRICKLAYER Building
BROK0005-004
$26.92 $13.09 $40.01
CARPENTER Building
CARP0329-005 (Excludes Drywall Hanging, Form Work, and Metal Stud Installation)
$27.79 $10.05 $37.84
CARPENTER Building
SUOK2012-043 (Drywall Hanging and Metal Stud Installation Only)
$14.16 0.00 $14.16
CARPENTER (Form Work Only) Heavy
SUOK2012-009
$14.00 0.00 $14.00
CARPENTER (Form Work Only) Building
SUOK2012-043
$15.34 $5.50 $20.84
CEMENT MASON/CONCRETE FINISHER Building
SUOK2012-043
$16.10 0.00 $16.10
ELECTRICIAN Heavy
ELEC1002-005
$51.00 $8.75 $59.75
ELECTRICIAN Building
ELEC1141-007 Scope differs by code/WD
$41.40 $6.00 $47.40
ELECTRICIAN Building
ELEC1141-029 (Low Voltage Wiring and Alarm Installation Only)
$24.26 $6.00 $30.26
IRONWORKER, STRUCTURAL Heavy
IRON0584-020
$30.35 $16.83 $47.18
IRONWORKER, STRUCTURAL Building
IRON0048-011
$32.10 $17.38 $49.48
LABORER: Common or General Heavy
SUOK2012-009
$13.83 0.00 $13.83
LABORER: Common or General Building
SUOK2012-043
$9.00 0.00 $9.00
LABORER: Mason Tender - Brick Building
SUOK2012-043
$11.88 0.00 $11.88
LABORER: Mason Tender - Cement/Concrete Building
SUOK2012-043
$13.04 0.00 $13.04
LABORER: Pipelayer Heavy
SUOK2012-009
$11.00 $0.30 $11.30
LABORER: Pipelayer Building
SUOK2012-043
$13.03 0.00 $13.03
LABORER: Plaster Tender Building
SUOK2012-043
$10.17 0.00 $10.17
OPERATOR: Backhoe Heavy
SUOK2012-009
$18.00 $0.97 $18.97
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUOK2012-043
$19.34 $0.74 $20.08
OPERATOR: OPERATOR: Roller Building
SUOK2012-043
$13.80 $0.94 $14.74
OPERATOR: PAINTER: Brush, Roller and Spray Building
SUOK2012-043
$13.38 0.00 $13.38
OPERATOR: PAINTER: Drywall Finishing/Taping Building
SUOK2012-043
$11.90 0.00 $11.90
OPERATOR: PIPEFITTER, Excludes HVAC Pipe Installation Building
SUOK2012-043
$19.00 0.00 $19.00
OPERATOR: ROOFER Building
SUOK2012-043
$15.00 $0.29 $15.29
OPERATOR: Scraper Heavy
SUOK2012-009
$14.00 0.00 $14.00
OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct and Unit Installation Building
SUOK2012-043
$16.32 0.00 $16.32
PIPEFITTER Building
PLUM0344-007 (HVAC Pipe Installation Only)
$41.00 $16.03 $57.03
PLASTERER Building
PLAS0518-028
$33.62 $14.18 $47.80
PLUMBER Building
PLUM0344-006 (Excludes HVAC Pipe Installation)
$41.00 $16.03 $57.03
POWER EQUIPMENT OPERATOR: Group 1 Heavy
ENGI0627-016
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 1 Building
ENGI0627-012
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 2 Heavy
ENGI0627-016
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 2 Building
ENGI0627-012
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 3 Heavy
ENGI0627-016
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 3 Building
ENGI0627-012
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 4 Heavy
ENGI0627-016
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group 4 Building
ENGI0627-012
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group 5 Heavy
ENGI0627-016
$32.71 $19.05 $51.76
POWER EQUIPMENT OPERATOR: Group 6 Heavy
ENGI0627-016
$30.87 $19.05 $49.92
POWER EQUIPMENT OPERATOR: Group 8 Heavy
ENGI0627-016
$28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: Group 8 Building
ENGI0627-012
$28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: Group 9 Heavy
ENGI0627-016
$28.25 $19.05 $47.30
POWER EQUIPMENT OPERATOR: Group10 Heavy
ENGI0627-016
$27.25 $19.05 $46.30
POWER EQUIPMENT OPERATOR: Group10 Building
ENGI0627-012
$27.25 $19.05 $46.30
SHEET METAL WORKER Building
SHEE0124-009 (HVAC Duct and Unit Installation Only)
$33.38 $16.36 $49.74
TRUCK DRIVER Heavy
TEAM0516-006 (3) Flatbed Truck
$30.85 $16.65 $47.50

Wage Determinations