Tulsa County in Oklahoma.

2 wage determinations 58 trade rates

Popular Trades In Tulsa County in Oklahoma.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
BRICKLAYER Building
BROK0005-004
$26.92 $13.09 $40.01
CARPENTER Building
SUOK2012-033 (Drywall Hanging Only)
$15.08 $1.21 $16.29
CARPENTER, Excludes Drywall Hanging, and Form Work Building
SUOK2012-033
$14.96 $1.55 $16.51
CAULKER Building
SUOK2012-033
$20.00 $1.61 $21.61
CEMENT MASON/CONCRETE FINISHER Heavy
SUOK2012-006
$14.00 $3.95 $17.95
CEMENT MASON/CONCRETE FINISHER Building
SUOK2012-033
$13.72 $1.27 $14.99
DRYWALL FINISHER/TAPER Building
SUOK2012-033
$13.00 0.00 $13.00
ELECTRICIAN Heavy
ELEC1002-005
$51.00 $8.75 $59.75
ELECTRICIAN Building
ELEC0584-006 (Excludes Low Voltage Wiring and Installation of Alarms and Sound and Communication Systems)
$38.38 $10.20 $48.58
ELECTRICIAN Building
SUOK2012-033 (Alarm Installation)
$19.48 $3.34 $22.82
ELECTRICIAN Building
SUOK2012-033 (Low Voltage Wiring)
$20.65 $3.06 $23.71
ELECTRICIAN Building
SUOK2012-033 (Sound and Communications Systems Installation)
$21.11 $2.47 $23.58
ELEVATOR MECHANIC Building
ELEV0083-003
$51.24 $38.44 $89.68
FORM WORKER Heavy
SUOK2012-006
$11.77 0.00 $11.77
FORM WORKER Building
SUOK2012-033
$12.69 $0.38 $13.07
HVAC MECHANIC Building
PLUM0430-019 (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)
$36.65 $16.03 $52.68
IRONWORKER Heavy
IRON0584-019 (Structural, Reinforcing, and Ornamental)
$30.35 $16.83 $47.18
IRONWORKER Building
IRON0584-025 (Ornamental, Reinforcing and Structural)
$30.35 $16.83 $47.18
LABORER: Common or General Heavy
SUOK2012-006
$11.37 $2.53 $13.90
LABORER: Common or General Building
SUOK2012-033
$12.44 $2.71 $15.15
LABORER: Mason Tender - Brick Building
SUOK2012-033
$12.43 0.00 $12.43
LABORER: Mason Tender - Cement/Concrete Building
SUOK2012-033
$13.00 $1.91 $14.91
LABORER: Pipelayer Heavy
SUOK2012-006
$12.94 $2.42 $15.36
LABORER: Pipelayer Building
SUOK2012-033
$12.39 0.00 $12.39
OPERATOR: Asphalt Paver Building
SUOK2012-033
$16.25 0.00 $16.25
OPERATOR: Backhoe/Excavator Heavy
SUOK2012-006
$16.62 $3.10 $19.72
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUOK2012-033
$16.96 $4.22 $21.18
OPERATOR: Bulldozer Heavy
SUOK2012-006
$17.98 $1.75 $19.73
OPERATOR: Drill Heavy
SUOK2012-006
$17.15 $0.78 $17.93
OPERATOR: Grader/Blade Heavy
SUOK2012-006
$17.76 $3.87 $21.63
OPERATOR: Loader (Front End) Heavy
SUOK2012-006
$14.01 0.00 $14.01
OPERATOR: Mechanic Heavy
SUOK2012-006
$19.61 $9.39 $29.00
OPERATOR: OPERATOR: Bulldozer Building
SUOK2012-033
$21.07 $2.48 $23.55
OPERATOR: OPERATOR: Grader/Blade Building
SUOK2012-033
$14.28 $1.70 $15.98
OPERATOR: OPERATOR: Loader (Front End) Building
SUOK2012-033
$16.18 0.00 $16.18
OPERATOR: PAINTER: Brush, Roller and Spray, Excludes Drywall Finishing/Taping Building
SUOK2012-033
$12.22 0.00 $12.22
OPERATOR: Scraper Heavy
SUOK2012-006
$16.00 $1.55 $17.55
OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building
SUOK2012-033
$22.11 $4.93 $27.04
OPERATOR: SPRINKLER FITTER Building
SUOK2012-033 (Fire Sprinklers)
$21.86 $1.19 $23.05
OPERATOR: Trackhoe Heavy
SUOK2012-006
$16.28 $1.73 $18.01
OPERATOR: TRUCK DRIVER: Dump and Flatbed Truck Building
SUOK2012-033
$11.00 0.00 $11.00
PIPEFITTER Building
PLUM0430-020 (Including HVAC Pipe Installation, excluding HVAC Unit Installation)
$36.65 $16.03 $52.68
PLUMBER Building
PLUM0430-010 (Excludes HVAC Pipe and Unit Installation)
$36.65 $16.03 $52.68
POWER EQUIPMENT OPERATOR: Group 1 Heavy
ENGI0627-014
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 1 Building
ENGI0627-020
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 2 Heavy
ENGI0627-014
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 2 Building
ENGI0627-020
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 3 Heavy
ENGI0627-014
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 3 Building
ENGI0627-020
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 4 Heavy
ENGI0627-014
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group 4 Building
ENGI0627-020
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group 6 Heavy
ENGI0627-014
$30.87 $19.05 $49.92
POWER EQUIPMENT OPERATOR: Group 8 Building
ENGI0627-020
$28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: Group10 Heavy
ENGI0627-014
$27.25 $19.05 $46.30
POWER EQUIPMENT OPERATOR: Group10 Building
ENGI0627-020
$27.25 $19.05 $46.30
ROOFER Building
ROOF0143-001
$26.30 $10.34 $36.64
SHEET METAL WORKER Building
SHEE0270-006 (HVAC Duct Installation Only)
$35.49 $14.60 $50.09
TRUCK DRIVER: Dump Truck Heavy
SUOK2012-006
$14.64 $1.71 $16.35

Wage Determinations