Washita in Oklahoma.

3 wage determinations 90 trade rates

Popular Trades In Washita in Oklahoma.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
Asphalt Raker and Shoveler Highway
SUOK2011-005
$10.49 $0.00 $10.49
BOILERMAKER Building
BOIL0592-001
$33.70 $24.41 $58.11
BRICKLAYER Building
BROK0005-004
$26.92 $13.09 $40.01
CARPENTER Highway
SUOK2011-005 (Excludes Form Work) Caddo County
$12.18 $0.00 $12.18
CARPENTER Building
SUOK2012-050
$15.71 $5.50 $21.21
CARPENTER (Form Work Only) Heavy
SUOK2012-014
$14.00 0.00 $14.00
CEMENT MASON/CONCRETE FINISHER Building
SUOK2012-050
$16.10 0.00 $16.10
ELECTRICIAN Heavy
ELEC1002-005
$51.00 $8.75 $59.75
ELECTRICIAN Building
ELEC1141-022 (Excludes Low Voltage Wiring and Installation of Alarms)
$41.40 $6.00 $47.40
ELECTRICIAN Building
SUOK2012-050 (Alarm Installation)
$17.50 $2.27 $19.77
ELECTRICIAN Building
SUOK2012-050 (Low Voltage Wiring)
$19.73 $4.55 $24.28
FORM WORKER Remaining Counties Highway
SUOK2011-005
$11.46 $0.00 $11.46
GUARDRAIL INSTALLER Highway
SUOK2011-005 (Includes Guardrail/Post Driver Work)
$9.70 $0.00 $9.70
IRONWORKER, REINFORCING Highway
SUOK2011-005
$13.63 $0.00 $13.63
IRONWORKER, STRUCTURAL Heavy
IRON0048-006
$32.10 $17.38 $49.48
IRONWORKER, STRUCTURAL Building
IRON0048-009
$32.10 $17.38 $49.48
LABORER Air/Power Tool Operator Highway
SUOK2011-005 (Includes Handheld Concrete Saws and Chipping Guns)
$12.79 $0.00 $12.79
LABORER: Common or General Heavy
SUOK2012-014
$10.00 0.00 $10.00
LABORER: Common or General Building
SUOK2012-050
$11.60 $0.84 $12.44
LABORER: Mason Tender - Brick Building
SUOK2012-050
$11.88 0.00 $11.88
LABORER: Mason Tender - Cement/Concrete Building
SUOK2012-050
$13.04 0.00 $13.04
LABORER: Pipelayer Heavy
SUOK2012-014
$11.00 $0.30 $11.30
LABORER: Pipelayer Building
SUOK2012-050
$13.03 0.00 $13.03
OPERATOR: Backhoe Heavy
SUOK2012-014
$18.00 $0.97 $18.97
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUOK2012-050
$19.34 $0.74 $20.08
OPERATOR: PAINTER: Brush, Roller and Spray Building
SUOK2012-050
$12.15 0.00 $12.15
OPERATOR: ROOFER Building
SUOK2012-050
$15.00 $0.29 $15.29
OPERATOR: Scraper Heavy
SUOK2012-014
$14.00 0.00 $14.00
OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building
SUOK2012-050
$16.32 0.00 $16.32
PIPEFITTER Building
PLUM0344-022 (Including HVAC Pipe and Unit Installation)
$41.00 $16.03 $57.03
Pipelayer Highway
SUOK2011-005
$11.83 $0.00 $11.83
PLUMBER Building
PLUM0344-006 (Excludes HVAC Pipe Installation)
$41.00 $16.03 $57.03
POWER EQUIPMENT OPERATOR: Asphalt Paver Screed Highway
SUOK2011-005
$13.19 $0.00 $13.19
POWER EQUIPMENT OPERATOR: Asphalt Paving Machine Highway
SUOK2011-005
$12.32 $0.00 $12.32
POWER EQUIPMENT OPERATOR: Asphalt Plant Highway
SUOK2011-005
$14.70 $0.00 $14.70
POWER EQUIPMENT OPERATOR: Bobcat/Skid Loader Highway
SUOK2011-005
$12.06 $0.00 $12.06
POWER EQUIPMENT OPERATOR: Broom Highway
SUOK2011-005
$11.02 $0.00 $11.02
POWER EQUIPMENT OPERATOR: Bulldozer Highway
SUOK2011-005
$13.69 $0.00 $13.69
POWER EQUIPMENT OPERATOR: Concrete Paving Machine Highway
SUOK2011-005
$14.42 $0.00 $14.42
POWER EQUIPMENT OPERATOR: Concrete Saw Highway
SUOK2011-005
$12.46 $0.00 $12.46
POWER EQUIPMENT OPERATOR: Crane Highway
SUOK2011-005
$16.61 $0.00 $16.61
POWER EQUIPMENT OPERATOR: Distributor Truck Highway
SUOK2011-005
$12.24 $0.00 $12.24
POWER EQUIPMENT OPERATOR: Dump Truck Highway
SUOK2011-005
$12.84 $0.00 $12.84
POWER EQUIPMENT OPERATOR: Excavator Highway
SUOK2011-005
$15.45 $0.00 $15.45
POWER EQUIPMENT OPERATOR: Flatbed Truck Highway
SUOK2011-005
$15.30 $0.00 $15.30
POWER EQUIPMENT OPERATOR: Group 1 Heavy
ENGI0627-016
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 1 Building
ENGI0627-012
$38.09 $19.05 $57.14
POWER EQUIPMENT OPERATOR: Group 2 Heavy
ENGI0627-016
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 2 Building
ENGI0627-012
$36.14 $19.05 $55.19
POWER EQUIPMENT OPERATOR: Group 3 Heavy
ENGI0627-016
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 3 Building
ENGI0627-012
$35.40 $19.05 $54.45
POWER EQUIPMENT OPERATOR: Group 4 Heavy
ENGI0627-016
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group 4 Building
ENGI0627-012
$34.07 $19.05 $53.12
POWER EQUIPMENT OPERATOR: Group 5 Heavy
ENGI0627-016
$32.71 $19.05 $51.76
POWER EQUIPMENT OPERATOR: Group 6 Heavy
ENGI0627-016
$30.87 $19.05 $49.92
POWER EQUIPMENT OPERATOR: Group 8 Heavy
ENGI0627-016
$28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: Group 8 Building
ENGI0627-012
$28.77 $19.05 $47.82
POWER EQUIPMENT OPERATOR: Group 9 Heavy
ENGI0627-016
$28.25 $19.05 $47.30
POWER EQUIPMENT OPERATOR: Group10 Heavy
ENGI0627-016
$27.25 $19.05 $46.30
POWER EQUIPMENT OPERATOR: Group10 Building
ENGI0627-012
$27.25 $19.05 $46.30
POWER EQUIPMENT OPERATOR: Loader (Front End) Highway
SUOK2011-005
$12.21 $0.00 $12.21
POWER EQUIPMENT OPERATOR: Lowboy/Float Highway
SUOK2011-005
$16.02 $0.00 $16.02
POWER EQUIPMENT OPERATOR: Mechanic Highway
SUOK2011-005
$16.89 $0.00 $16.89
POWER EQUIPMENT OPERATOR: Milling Machine Highway
SUOK2011-005
$11.81 $0.00 $11.81
POWER EQUIPMENT OPERATOR: Mixer Highway
SUOK2011-005
$14.56 $0.00 $14.56
POWER EQUIPMENT OPERATOR: Off the Road Truck Highway
SUOK2011-005
$11.84 $0.00 $11.84
POWER EQUIPMENT OPERATOR: Oiler Highway
SUOK2011-005
$13.84 $0.00 $13.84
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-005 Scope differs by code/WD
$13.71 $0.00 $13.71
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-005 Scope differs by code/WD
$13.30 $0.00 $13.30
POWER EQUIPMENT OPERATOR: Remaining Counties Highway
SUOK2011-005 Scope differs by code/WD
$12.61 $0.00 $12.61
POWER EQUIPMENT OPERATOR: Roller Highway
SUOK2011-005 (Asphalt) Caddo County
$12.73 $0.00 $12.73
POWER EQUIPMENT OPERATOR: Roller (Dirt Compaction) Highway
SUOK2011-005
$10.22 $0.00 $10.22
POWER EQUIPMENT OPERATOR: Rotomill Highway
SUOK2011-005
$17.33 $0.00 $17.33
POWER EQUIPMENT OPERATOR: Scraper Highway
SUOK2011-005
$12.82 $0.00 $12.82
POWER EQUIPMENT OPERATOR: Single Axle Truck Highway
SUOK2011-005 (Includes Pilot Car)
$12.30 $0.00 $12.30
POWER EQUIPMENT OPERATOR: Straight Truck Highway
SUOK2011-005
$15.92 $0.00 $15.92
POWER EQUIPMENT OPERATOR: Striping Machine Highway
SUOK2011-005
$12.11 $0.00 $12.11
POWER EQUIPMENT OPERATOR: Tandem Axle/Semi Trailer Highway
SUOK2011-005
$13.53 $0.00 $13.53
POWER EQUIPMENT OPERATOR: Tractor/Box Blade Highway
SUOK2011-005
$9.79 $0.00 $9.79
POWER EQUIPMENT OPERATOR: Transfer Material Machine Highway
SUOK2011-005
$12.38 $0.75 $13.13
POWER EQUIPMENT OPERATOR: Trencher Highway
SUOK2011-005
$14.66 $0.00 $14.66
POWER EQUIPMENT OPERATOR: TRUCK DRIVER Concrete Truck Highway
SUOK2011-005
$14.22 $0.00 $14.22
POWER EQUIPMENT OPERATOR: Water Truck Highway
SUOK2011-005
$12.00 $0.00 $12.00
Remaining Counties Highway
SUOK2011-005 Scope differs by code/WD
$12.57 $0.00 $12.57
Remaining Counties Highway
SUOK2011-005 Scope differs by code/WD
$12.53 $0.00 $12.53
Remaining Counties Highway
SUOK2011-005 Scope differs by code/WD
$10.29 $0.00 $10.29
SHEET METAL WORKER Building
SHEE0124-010 (HVAC Duct Installation Only)
$33.38 $16.36 $49.74
Traffic Control Highway
SUOK2011-005 (Includes Flagger, Setting Up and Moving Cones/Barrels)
$10.39 $0.00 $10.39
TRUCK DRIVER Heavy
TEAM0516-006 (3) Flatbed Truck
$30.85 $16.65 $47.50
Vibrating Plate Highway
SUOK2011-005
$12.70 $0.00 $12.70

Wage Determinations

Highway

0 trades

Applies to

Beckham, Caddo, Cotton, Custer, Greer, Harmon, Jackson, Jefferson, Kiowa, Roger Mills +3 more

Heavy

0 trades

Applies to

Beckham, Caddo, Cotton, Custer, Greer, Harmon, Jackson, Jefferson, Kiowa, Roger Mills +3 more

Building

0 trades

Applies to

Caddo, Cotton, Greer, Harmon, Jefferson, Kiowa, Roger Mills, Tillman, Washita in Oklahoma.