PA20260075
rev 3Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR MECHANICAL- Duct, Pipe & Mechanical System Insulation and Industrial Work Building ASBE0002-005 (Including Duct and Pipe) | $46.50 | $29.43 | $75.93 |
| BOILERMAKER Building BOIL0154-007 | $48.28 | $33.17 | $81.45 |
| BRICKLAYER Building BRPA0009-055 (Including Pointing, Caulking, Cleaning, and Brick Refractory Work) | $35.28 | $24.49 | $59.77 |
| Broom/Sweeper, Compressor, Concrete Pump, Highlift, Hoist, Pump, Roller, Tugboat, Forklift Building ENGI0066-040 (ridden or self-propelled) | $35.62 | $24.05 | $59.67 |
| CARPENTER Building CARP0142-014 (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation, Floor Laying-Hardwood Floors, Carpet, Form Work, and Scaffold Building) | $38.92 | $20.06 | $58.98 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0526-015 | $31.77 | $21.89 | $53.66 |
| Common or General Building LABO0833-001 | $27.82 | $20.39 | $48.21 |
| ELECTRICIAN Building ELEC0005-019 (HVAC/Temperature Controls Installation Only) | $49.11 | $36.79 | $85.90 |
| ELECTRICIAN Building ELEC0712-010 (Includes Alarm Installation and Low Voltage Wiring and Installation of Sound and Communication Systems; Excludes HVAC Temperature Control Installation) | $51.45 | $29.77 | $81.22 |
| FLOOR LAYER: Vinyl Flooring Building SUPA2011-033 | $28.11 | $7.03 | $35.14 |
| GLAZIER Building PAIN0751-006 | $35.65 | $29.73 | $65.38 |
| LABORER Asbestos Abatement Building LABO0833-001 (Removal from Floors, Walls, & Ceilings) | $27.97 | $20.39 | $48.36 |
| LABORER Mason Tender - Cement/Concrete Building LABO0125-005 | $30.24 | $12.05 | $42.29 |
| LABORER: Asphalt Raker Building SUPA2011-033 | $20.92 | $9.09 | $30.01 |
| LABORER: Landscape Building SUPA2011-033 | $18.10 | 0.00 | $18.10 |
| LABORER: Luteman Building SUPA2011-033 | $21.13 | $8.23 | $29.36 |
| Loader Building ENGI0066-040 | $41.69 | $24.05 | $65.74 |
| MASON - STONE Building BRPA0009-055 | $35.28 | $24.49 | $59.77 |
| Mason Tender- Brick Building LABO0833-001 | $30.97 | $20.39 | $51.36 |
| MILLWRIGHT Building CARP0443-004 | $43.00 | $23.44 | $66.44 |
| Oiler Building ENGI0066-040 | $32.83 | $24.05 | $56.88 |
| PAINTER Building PAIN0057-033 (Brush, Roller, and Spray, excluding work on Industrial sites) | $30.56 | $23.72 | $54.28 |
| PAINTER Building PAIN0057-033 (Drywall Finishing/Taping) | $32.39 | $23.26 | $55.65 |
| PAINTER Building PAIN0057-034 (INDUSTRIAL: Brush and Roller Only) | $36.01 | $23.72 | $59.73 |
| PAINTER Building PAIN0057-034 (INDUSTRIAL: Spray and Sandblaster Only) | $36.01 | $23.72 | $59.73 |
| PILEDRIVERMAN Building CARP0274-003 | $43.13 | $23.42 | $66.55 |
| PIPEFITTER Building PLUM0449-005 (Includes HVAC Pipe Installation, Excludes Work on Industrial Sites) | $48.15 | $29.17 | $77.32 |
| PIPEFITTER (Industrial) Building PLUM0449-004 | $52.50 | $30.17 | $82.67 |
| PLASTERER Building PLAS0526-026 | $30.69 | $18.99 | $49.68 |
| PLUMBER Building PLUM0027-003 | $48.65 | $25.47 | $74.12 |
| ROOFER Building ROOF0037-005 (Excludes Metal Roof Installation and Waterproofing) | $41.21 | $21.46 | $62.67 |
| ROOFER: Waterproofing Only Building SUPA2011-033 | $25.07 | $7.33 | $32.40 |
| SHEET METAL WORKER Building SHEE0012-011 (Includes HVAC Duct and Metal Roof Installation) | $39.50 | $30.79 | $70.29 |
| SPRINKLER FITTER Building SFPA0669-004 (Fire Sprinklers) | $49.75 | $30.26 | $80.01 |
| Structural; Metal Buildings: IRONWORKER Building IRON0003-025 (Ornamental, Reinforcing, Rigger and Metal Siding/Wall Panels Installation) | $38.89 | $34.54 | $73.43 |
| TILE FINISHER Building BRPA0009-011 | $28.76 | $17.16 | $45.92 |
| TILE SETTER Building BRPA0009-011 | $35.64 | $21.63 | $57.27 |
| TRUCK DRIVER: Dump Truck Building SUPA2011-033 | $23.36 | $7.60 | $30.96 |
No trade rates match your search and filter selection.
Building