PA20260055
rev 2Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR INDUSTRIAL; MECHANICAL- Duct, Pipe & Mechanical System Insulation Building ASBE0002-006 | $46.50 | $29.43 | $75.93 |
| BOILERMAKER Building BOIL0154-007 | $48.28 | $33.17 | $81.45 |
| BRICKLAYER Building BRPA0009-052 (Brick Refractory/Brick Placement Worker Only) | $37.30 | $24.46 | $61.76 |
| BRICKLAYER Building BRPA0009-052 (Including Pointing, Caulking, and Cleaning) | $36.55 | $24.46 | $61.01 |
| CARPENTER Building CARP0423-014 (Includes Drywall Hanging, Metal Stud Installation, Floor Laying-Vinyl, Form Work, Acoustical Ceiling Installation, Floor Laying-Hardwood and Carpet, and Scaffold Building) | $34.76 | $20.64 | $55.40 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0526-015 | $31.77 | $21.89 | $53.66 |
| ELECTRICIAN Building ELEC0005-015 (Includes Installation of Sound and Communication System and Low Voltage Wiring; Excludes HVAC Temperature Control Installation and Alarm Installation) | $49.11 | $36.79 | $85.90 |
| ELECTRICIAN Building ELEC0712-007 (Alarm Installation Only) | $51.45 | $29.77 | $81.22 |
| ELECTRICIAN Building SUPA2011-013 (HVAC/Temperature Controls Installation Only) | $29.05 | $16.89 | $45.94 |
| GLAZIER Building PAIN0751-002 | $25.40 | $25.47 | $50.87 |
| IRONWORKER Building IRON0207-009 (Metal Roof Installation Only) | $36.26 | $28.16 | $64.42 |
| IRONWORKER, RIGGER Building IRON0003-018 | $38.89 | $34.54 | $73.43 |
| IRONWORKER, STRUCTURAL, REINFORCING AND ORNAMENTAL Building IRON0003-026 | $38.89 | $34.54 | $73.43 |
| LABORER Building LABO0910-005 (Common or General; Concrete Worker) | $26.82 | $19.39 | $46.21 |
| LABORER: Mason Tender - Cement/Concrete Building SUPA2011-013 | $18.41 | $6.45 | $24.86 |
| Loader Building ENGI0066-038 | $41.69 | $24.05 | $65.74 |
| MASON - STONE Building BRPA0009-052 | $36.55 | $24.46 | $61.01 |
| MECHANICAL INSULATOR, Including Duct and Pipe and Excluding work on Industrial sites Building SUPA2011-013 | $30.60 | $17.16 | $47.76 |
| MILLWRIGHT Building CARP0443-004 | $43.00 | $23.44 | $66.44 |
| Oiler Building ENGI0066-038 | $32.83 | $24.05 | $56.88 |
| PAINTER Building PAIN0041-003 (Spray Only, excludes work on Industrial sites) | $27.95 | $16.12 | $44.07 |
| PAINTER Building PAIN0057-031 (INDUSTRIAL: Spray Only) | $36.01 | $23.72 | $59.73 |
| PAINTER: Brush and Roller Only Building PAIN0057-001 | $30.56 | $23.72 | $54.28 |
| PAINTER: Drywall Finishing/Taping Only Building PAIN0057-001 | $32.39 | $23.26 | $55.65 |
| PIPEFITTER Building PLUM0354-021 (Excludes HVAC Pipe Installation and Work on Industrial Sites) | $40.02 | $26.55 | $66.57 |
| PIPEFITTER Building PLUM0449-003 (HVAC Pipe Installation Only) | $48.15 | $29.17 | $77.32 |
| PIPEFITTER (Industrial) Building PLUM0354-008 | $47.75 | $26.55 | $74.30 |
| PLASTERER Building PLAS0526-026 | $30.69 | $18.99 | $49.68 |
| PLUMBER Building PLUM0354-015 | $40.02 | $26.55 | $66.57 |
| POWER EQUIPMENT OPERATOR Backhoe/Excavator/Trackhoe, Bobcat/Skid Steer/Skid Loader, Paver Building ENGI0066-038 (Asphalt, Aggregate, and Concrete), Bulldozer, Crane*, Drill Rig Caissons, Man Lift/Outside Elevator | $41.69 | $24.05 | $65.74 |
| Roller, Forklift Building ENGI0066-038 (ridden or self-propelled) | $35.62 | $24.05 | $59.67 |
| ROOFER, Excludes Installation of Metal Roofs Building SUPA2011-013 | $24.13 | $11.95 | $36.08 |
| SHEET METAL WORKER Building SHEE0012-009 (Includes HVAC Duct Installation, Excludes Metal Flashing Installation) | $39.50 | $30.79 | $70.29 |
| SHEET METAL WORKER Building SUPA2011-013 (Metal Flashing Installation only) | $31.43 | $20.05 | $51.48 |
| SPRINKLER FITTER Building SFPA0669-004 (Fire Sprinklers) | $49.75 | $30.26 | $80.01 |
| TILE FINISHER Building BRPA0009-011 | $28.76 | $17.16 | $45.92 |
| TILE SETTER Building BRPA0009-011 | $35.64 | $21.63 | $57.27 |
| TRUCK DRIVER: Dump Truck Building SUPA2011-013 | $24.98 | $11.88 | $36.86 |
No trade rates match your search and filter selection.
Building