Horry in South Carolina.

1 wage determination 42 trade rates

Popular Trades In Horry in South Carolina.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
Asphalt, Includes Asphalt Distributor, Shoveler and Spreader Horry Highway
SUSC2011-032
$11.54 $0.00 $11.54
CARPENTER Highway
SUSC2011-032 (Form Work Only) Berkeley, Dorchester
$13.50 $0.00 $13.50
CEMENT MASON/CONCRETE FINISHER Berkeley, Dorchester Highway
SUSC2011-032
$14.79 $0.00 $14.79
Charleston Highway
SUSC2011-032 Scope differs by code/WD
$13.07 $0.00 $13.07
Charleston Highway
SUSC2011-032 Scope differs by code/WD
$14.33 $0.00 $14.33
Charleston Highway
SUSC2011-032 Scope differs by code/WD
$10.16 $0.00 $10.16
Common or General Berkeley Highway
SUSC2011-032
$10.06 $0.00 $10.06
Dorchester Highway
SUSC2011-032
$11.69 $0.00 $11.69
Horry Highway
SUSC2011-032 Scope differs by code/WD
$14.29 $0.00 $14.29
Horry Highway
SUSC2011-032 Scope differs by code/WD
$14.62 $0.00 $14.62
Horry Highway
SUSC2011-032 Scope differs by code/WD
$9.72 $0.00 $9.72
Horry Highway
SUSC2011-032 Scope differs by code/WD
$12.63 $0.00 $12.63
IRONWORKER, REINFORCING Highway
SUSC2011-032
$15.35 $0.00 $15.35
LABORER Asphalt, Includes Asphalt Distributor, Raker, Shoveler, and Spreader Berkeley, Charleston, Dorchester Highway
SUSC2011-032
$11.62 $0.00 $11.62
Luteman Highway
SUSC2011-032
$11.61 $0.00 $11.61
Mason Tender- Cement/Concrete Highway
SUSC2011-032
$10.40 $0.00 $10.40
Pipelayer Highway
SUSC2011-032
$13.98 $0.00 $13.98
POWER EQUIPMENT OPERATOR: Backhoe/Excavator/Trackhoe Berkeley Highway
SUSC2011-032
$15.68 $0.00 $15.68
POWER EQUIPMENT OPERATOR: Bulldozer Highway
SUSC2011-032
$14.81 $0.00 $14.81
POWER EQUIPMENT OPERATOR: Charleston Highway
SUSC2011-032 Scope differs by code/WD
$16.09 $0.00 $16.09
POWER EQUIPMENT OPERATOR: Charleston Highway
SUSC2011-032 Scope differs by code/WD
$20.08 $0.00 $20.08
POWER EQUIPMENT OPERATOR: Charleston Highway
SUSC2011-032 Scope differs by code/WD
$19.21 $0.00 $19.21
POWER EQUIPMENT OPERATOR: Crane Berkeley, Dorchester Highway
SUSC2011-032
$20.00 $4.73 $24.73
POWER EQUIPMENT OPERATOR: Dorchester Highway
SUSC2011-032
$16.06 $0.00 $16.06
POWER EQUIPMENT OPERATOR: Grader/Blade Highway
SUSC2011-032
$14.61 $0.00 $14.61
POWER EQUIPMENT OPERATOR: Horry Highway
SUSC2011-032 Scope differs by code/WD
$15.04 $0.00 $15.04
POWER EQUIPMENT OPERATOR: Horry Highway
SUSC2011-032 Scope differs by code/WD
$20.58 $0.00 $20.58
POWER EQUIPMENT OPERATOR: Horry Highway
SUSC2011-032 Scope differs by code/WD
$19.48 $0.00 $19.48
POWER EQUIPMENT OPERATOR: Horry Highway
SUSC2011-032 Scope differs by code/WD
$13.29 $0.00 $13.29
POWER EQUIPMENT OPERATOR: Hydroseeder Highway
SUSC2011-032
$11.00 $0.00 $11.00
POWER EQUIPMENT OPERATOR: Loader (Front End/Track) Highway
SUSC2011-032
$16.80 $0.00 $16.80
POWER EQUIPMENT OPERATOR: Lowboy Truck Highway
SUSC2011-032
$15.55 $0.00 $15.55
POWER EQUIPMENT OPERATOR: Mechanic Berkeley, Dorchester Highway
SUSC2011-032
$19.07 $0.00 $19.07
POWER EQUIPMENT OPERATOR: Milling Machine Highway
SUSC2011-032
$11.84 $0.00 $11.84
POWER EQUIPMENT OPERATOR: Paver Berkeley, Charleston, Dorchester Highway
SUSC2011-032
$18.85 $0.00 $18.85
POWER EQUIPMENT OPERATOR: Roller Highway
SUSC2011-032
$15.17 $0.00 $15.17
POWER EQUIPMENT OPERATOR: Scraper Highway
SUSC2011-032
$12.71 $0.00 $12.71
POWER EQUIPMENT OPERATOR: Screed Highway
SUSC2011-032
$13.56 $0.00 $13.56
POWER EQUIPMENT OPERATOR: Tractor Highway
SUSC2011-032
$13.28 $0.00 $13.28
POWER EQUIPMENT OPERATOR: TRUCK DRIVER Dump Truck Highway
SUSC2011-032
$10.67 $0.00 $10.67
Traffic Control-Cone Setter Berkeley, Charleston, Dorechester Highway
SUSC2011-032
$13.19 $0.00 $13.19
Traffic Control-Flagger Highway
SUSC2011-032
$11.07 $0.00 $11.07

Wage Determinations

Highway

0 trades

Applies to

Berkeley, Charleston, Dorchester, Horry in South Carolina.