Burnet County in Texas.

1 wage determination 28 trade rates

Popular Trades In Burnet County in Texas.

Trade Rates

Click any row to save it for later

Same trade names can appear multiple times when classification codes or coverage language differ. Compare the code badge, any italic scope text, and WD reference to identify the right line.
Trade & Classification Rate Fringe Total
ASBESTOS WORKER/HEAT & FROST INSULATOR Building
ASBE0087-002
$30.50 $8.89 $39.39
BOILERMAKER Building
BOIL0074-003
$33.17 $24.92 $58.09
BRICKLAYER Building
SUTX2009-010
$19.67 0.00 $19.67
CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Metal Stud Installation Building
SUTX2009-010
$13.13 0.00 $13.13
CEMENT MASON/CONCRETE FINISHER Building
SUTX2009-010
$13.27 0.00 $13.27
ELECTRICIAN Building
SUTX2009-010
$20.00 $3.11 $23.11
GLAZIER Building
SUTX2009-010
$17.20 $1.59 $18.79
HVAC MECHANIC Building
SUTX2009-010 (HVAC Duct and Pipe Installation)
$14.21 $0.77 $14.98
INSTALLER - OVERHEAD DOOR Building
SUTX2009-010
$11.63 $6.26 $17.89
IRONWORKER, REINFORCING AND STRUCTURAL Building
IRON0482-013
$28.30 $8.23 $36.53
LABORER: Common or General Building
SUTX2009-010
$9.73 0.00 $9.73
LABORER: Landscape & Irrigation Building
SUTX2009-010
$8.50 $0.22 $8.72
LABORER: Mason Tender - Brick Building
SUTX2009-010
$12.02 0.00 $12.02
LABORER: Mortar Mixer Building
SUTX2009-010
$12.00 0.00 $12.00
LABORER: Plaster Tender Building
SUTX2009-010
$9.00 0.00 $9.00
Laborers: Building
LABO0154-001 (Mason Tender - Cement/Concrete)
$25.27 $9.57 $34.84
OPERATOR: Backhoe/Excavator/Trackhoe Building
SUTX2009-010
$13.75 0.00 $13.75
OPERATOR: OPERATOR: Bulldozer Building
SUTX2009-010
$12.80 $0.43 $13.23
OPERATOR: OPERATOR: Crane Building
SUTX2009-010
$21.33 0.00 $21.33
OPERATOR: OPERATOR: Forklift Building
SUTX2009-010
$14.58 0.00 $14.58
OPERATOR: OPERATOR: Loader (Front End) Building
SUTX2009-010
$10.54 0.00 $10.54
OPERATOR: PAINTER: Brush, Roller and Spray Building
SUTX2009-010
$12.26 0.00 $12.26
OPERATOR: PLASTERER Building
SUTX2009-010
$15.50 0.00 $15.50
OPERATOR: ROOFER Building
SUTX2009-010
$13.64 $1.80 $15.44
OPERATOR: SHEET METAL WORKER, Excludes HVAC Duct Installation Building
SUTX2009-010
$17.00 0.00 $17.00
OPERATOR: TILE SETTER Building
SUTX2009-010
$15.00 0.00 $15.00
OPERATOR: TRUCK DRIVER Building
SUTX2009-010
$11.24 $0.35 $11.59
PLUMBER, Excludes HVAC Pipe Installation Building
PLUM0286-007
$37.15 $16.92 $54.07

Wage Determinations