WV20260011
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0002-002 | $46.50 | $29.43 | $75.93 |
| BOILERMAKER Building BOIL0667-005 | $47.13 | $28.93 | $76.06 |
| BRICKLAYER Bricklayer & Brick Pointer/Caulker/Cleaner Building BRWV0015-004 | $31.65 | $25.82 | $57.47 |
| CARPENTER Building CARP0436-001 (Including Drywall Hanging and Form Work) | $33.05 | $26.50 | $59.55 |
| CARPENTER Highway CARP0439-008 | $33.80 | $27.34 | $61.14 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0926-007 | $30.29 | $19.29 | $49.58 |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0926-001 | $35.77 | $27.54 | $63.31 |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0926-004 | $35.77 | $27.54 | $63.31 |
| ELECTRICIAN Building ELEC0596-006 | $43.77 | $27.72 | $71.49 |
| ELECTRICIAN Heavy ELEC0307-008 | $42.20 | $20.39 | $62.59 |
| GLAZIER Building PAIN1195-002 | $32.89 | $13.38 | $46.27 |
| Group 2 Building LABO0984-004 | $24.13 | $16.05 | $40.18 |
| IRONWORKER Building IRON0549-008 (Ornamental, Reinforcing, and Structural) | $35.19 | $25.66 | $60.85 |
| IRONWORKER Highway IRON0549-015 | $35.50 | $29.11 | $64.61 |
| IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL Heavy IRON0549-012 | $35.50 | $29.11 | $64.61 |
| LABORER Asphalt Raker Building LABO1149-004 | $25.92 | $16.88 | $42.80 |
| LABORER Group 1 Building LABO0984-004 | $24.13 | $16.05 | $40.18 |
| LABORER Mason Tender - Cement/Concrete Building LABO0379-007 | $24.13 | $16.20 | $40.33 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway LADC0001-007 | $29.00 | $17.40 | $46.40 |
| LABORER: Common or General Heavy SUWV2012-052 | $22.11 | $10.34 | $32.45 |
| LABORER: Common or General Highway SUWV2022-005 | $26.42 | $16.49 | $42.91 |
| LABORER: Grade Checker Highway LADC0001-004 | $29.00 | $17.40 | $46.40 |
| LABORER: GROUP 1 Heavy LABO0379-021 | $28.02 | $16.80 | $44.82 |
| LABORER: GROUP 2 Heavy LABO0379-021 | $25.26 | $16.80 | $42.06 |
| LABORER: Guardrail Installation Highway LADC0001-008 | $29.00 | $17.40 | $46.40 |
| LABORER: Laser Screed Operator Highway LADC0001-006 | $30.03 | $17.40 | $47.43 |
| LABORER: Mason Tender - Cement/Concrete Highway LADC0001-005 | $29.00 | $17.40 | $46.40 |
| LABORER: Pipelayer Heavy SUWV2012-052 | $22.34 | $10.95 | $33.29 |
| LABORER: Sign and Display Erector Highway LADC0001-009 | $29.00 | $17.40 | $46.40 |
| MASON - STONE Building BRWV0015-010 | $33.00 | $26.18 | $59.18 |
| MILLWRIGHT Building CARP0443-009 | $37.40 | $26.06 | $63.46 |
| OPERATOR: Backhoe Heavy SUWV2012-052 | $24.39 | $15.50 | $39.89 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway ENGI0132-003 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader Highway ENGI0132-004 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Broom/Sweeper Highway ENGI0132-005 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Bulldozer Highway ENGI0132-030 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Concrete Screed Highway SUWV2022-005 | $31.35 | $17.96 | $49.31 |
| OPERATOR: Crane Highway ENGI0132-002 | $40.35 | $20.30 | $60.65 |
| OPERATOR: Drill Highway ENGI0132-031 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Forklift Building SUWV2012-009 | $33.09 | $3.00 | $36.09 |
| OPERATOR: Forklift Highway ENGI0132-032 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Grader/Blade Highway ENGI0132-033 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Loader Highway SUWV2022-005 | $34.70 | $18.98 | $53.68 |
| OPERATOR: Mechanic Highway SUWV2022-005 | $35.04 | $20.10 | $55.14 |
| OPERATOR: Milling Machine Highway ENGI0132-034 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Paver/Spreader/Finish equipment Highway ENGI0132-035 (asphalt, aggregate, & concrete) | $37.59 | $20.30 | $57.89 |
| OPERATOR: Post Driver Highway ENGI0132-038 (Guardrail/Fences) | $37.59 | $20.30 | $57.89 |
| OPERATOR: Roller Highway SUWV2022-005 | $29.38 | $19.04 | $48.42 |
| PAINTER Building PAIN0091-012 (Brush, Roller and Spray) | $29.47 | $18.72 | $48.19 |
| PIPEFITTER Building PLUM0152-010 (Includes HVAC Pipe Installation) | $34.05 | $41.05 | $75.10 |
| PLUMBER Building PLUM0152-009 | $34.05 | $41.05 | $75.10 |
| POWER EQUIPMENT OPERATOR: GROUP 1 Building ENGI0132-006 | $46.56 | $22.05 | $68.61 |
| POWER EQUIPMENT OPERATOR: GROUP 1 Heavy ENGI0132-015 | $41.95 | $20.45 | $62.40 |
| POWER EQUIPMENT OPERATOR: GROUP 2 Building ENGI0132-006 | $46.21 | $22.05 | $68.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 Heavy ENGI0132-015 | $39.19 | $20.45 | $59.64 |
| POWER EQUIPMENT OPERATOR: GROUP 3 Building ENGI0132-006 | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 3 Heavy ENGI0132-015 | $38.08 | $20.45 | $58.53 |
| POWER EQUIPMENT OPERATOR: GROUP 4 Building ENGI0132-006 | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 4 Heavy ENGI0132-015 | $34.62 | $20.45 | $55.07 |
| ROOFER Building SUWV2012-009 | $24.28 | $9.32 | $33.60 |
| SHEET METAL WORKER Building SHEE0033-003 (Includes HVAC Duct Installation) | $34.92 | $29.70 | $64.62 |
| SPRINKLER FITTER Building SFWV0669-003 (Fire Sprinklers) | $43.26 | $28.90 | $72.16 |
| TRAFFIC CONTROL PERSON Highway LADC0001-002 | $27.91 | $17.40 | $45.31 |
| TRUCK DRIVER: Dump Truck Highway SUWV2022-005 | $28.78 | $18.42 | $47.20 |
| Truck Driver: Single and Double Axle Dump Trucks Building SUWV2012-009 | $28.52 | $3.00 | $31.52 |
| Truck Driver: Single and Double Axle Dump Trucks Heavy SUWV2012-052 | $22.76 | $10.90 | $33.66 |
No trade rates match your search and filter selection.
Building
Heavy
Highway