WV20260018
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0080-002 | $38.05 | $30.87 | $68.92 |
| BOILERMAKER Building BOIL0667-005 | $47.13 | $28.93 | $76.06 |
| BRICK POINTER/CAULKER/CLEANER Building BRWV0009-001 | $31.65 | $25.56 | $57.21 |
| BRICKLAYER Building SUWV2012-016 | $27.50 | $12.35 | $39.85 |
| CARPENTER Building CARP1024-001 (Scaffold Builder Only) | $30.00 | $21.15 | $51.15 |
| CARPENTER Building CARP1911-007 (Including Floor Laying - Carpet, Hardwood, Resilient and Vinyl) | $30.03 | $23.65 | $53.68 |
| CARPENTER Building SUWV2012-016 (Drywall Hanging Only) | $25.08 | $12.58 | $37.66 |
| CARPENTER Highway SUWV2022-008 | $27.72 | $19.44 | $47.16 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0926-007 Scope differs by code/WD | $30.29 | $19.29 | $49.58 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0926-008 Scope differs by code/WD | $34.77 | $26.66 | $61.43 |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0926-001 | $35.77 | $27.54 | $63.31 |
| CEMENT MASON/CONCRETE FINISHER Highway PLAS0926-004 | $35.77 | $27.54 | $63.31 |
| Concrete Saw Building LABO0453-006 (Hand Held/Walk Behind) | $22.76 | $16.75 | $39.51 |
| ELECTRICIAN Building ELEC0466-008 | $42.73 | $23.71 | $66.44 |
| ELECTRICIAN Heavy ELEC0307-008 | $42.20 | $20.39 | $62.59 |
| GLAZIER Building PAIN1195-002 | $32.89 | $13.38 | $46.27 |
| Grouting Building LABO0453-006 | $22.76 | $16.75 | $39.51 |
| IRONWORKER Highway SUWV2022-008 | $35.12 | $20.27 | $55.39 |
| IRONWORKER (Ornamental) Building IRON0549-006 | $35.19 | $25.66 | $60.85 |
| IRONWORKER (Reinforcing) Building IRON0787-006 | $36.10 | $24.65 | $60.75 |
| IRONWORKER, ORNAMENTAL Heavy IRON0549-011 | $35.50 | $29.11 | $64.61 |
| IRONWORKER, REINFORCING AND STRUCTURAL Heavy IRON0568-020 | $34.84 | $25.40 | $60.24 |
| IRONWORKER, STRUCTURAL Building SUWV2012-016 | $26.01 | $12.18 | $38.19 |
| LABORER Building LABO0543-003 | $25.41 | $16.75 | $42.16 |
| LABORER Common or General Building LABO0453-006 | $22.76 | $16.75 | $39.51 |
| LABORER Group 2 Building LABO0984-005 | $24.13 | $16.05 | $40.18 |
| LABORER Wacker Roller Operator Building LABO0379-019 | $28.02 | $16.80 | $44.82 |
| LABORER: (PIPELINE) Heavy LABO0379-041 | $25.26 | $16.50 | $41.76 |
| LABORER: Asphalt, Includes Raker, Shoveler, Spreader and Distributor Highway LADC0001-007 | $29.00 | $17.40 | $46.40 |
| LABORER: Common or General Highway SUWV2022-008 | $26.30 | $16.30 | $42.60 |
| LABORER: Demolition Building SUWV2012-016 | $20.58 | $9.47 | $30.05 |
| LABORER: Grade Checker Highway LADC0001-004 | $29.00 | $17.40 | $46.40 |
| LABORER: GROUP 1 Heavy LABO0379-043 | $27.35 | $16.50 | $43.85 |
| LABORER: GROUP 2 Heavy LABO0379-043 | $26.32 | $16.50 | $42.82 |
| LABORER: GROUP 3 Heavy LABO0379-043 | $25.26 | $16.50 | $41.76 |
| LABORER: Guardrail Installation Highway LADC0001-008 | $29.00 | $17.40 | $46.40 |
| LABORER: Laser Screed Operator Highway LADC0001-006 | $30.03 | $17.40 | $47.43 |
| LABORER: Mason Tender - Brick Building SUWV2012-016 | $21.47 | $8.29 | $29.76 |
| LABORER: Mason Tender - Cement/Concrete Building SUWV2012-016 | $22.05 | $8.54 | $30.59 |
| LABORER: Mason Tender - Cement/Concrete Highway LADC0001-005 | $29.00 | $17.40 | $46.40 |
| MASON - STONE Building BRWV0015-010 | $33.00 | $26.18 | $59.18 |
| MILLWRIGHT Building CARP0443-009 | $37.40 | $26.06 | $63.46 |
| MILLWRIGHT Heavy CARP0443-008 | $39.60 | $26.06 | $65.66 |
| OPERATOR: Backhoe/Excavator/Trackhoe Highway SUWV2022-008 | $34.18 | $19.04 | $53.22 |
| OPERATOR: Bobcat/Skid Steer/Skid Loader Highway ENGI0132-004 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Bulldozer Building SUWV2012-016 | $30.24 | $10.26 | $40.50 |
| OPERATOR: Bulldozer Highway ENGI0132-030 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Crane Highway ENGI0132-002 | $40.35 | $20.30 | $60.65 |
| OPERATOR: Drill Highway ENGI0132-031 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Excavator Building SUWV2012-016 | $30.31 | $10.81 | $41.12 |
| OPERATOR: Forklift Building SUWV2012-016 | $33.09 | $3.00 | $36.09 |
| OPERATOR: Forklift Highway ENGI0132-032 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Grader/Blade Highway ENGI0132-033 | $37.59 | $20.30 | $57.89 |
| OPERATOR: Loader Six Highway ENGI0132-001 (6) cubic yards capacity and over | $40.35 | $20.30 | $60.65 |
| OPERATOR: Milling Machine Highway ENGI0132-034 | $37.59 | $20.30 | $57.89 |
| OPERATOR: OPERATOR: Broom/Sweeper Highway SUWV2022-008 | $30.70 | $18.38 | $49.08 |
| OPERATOR: OPERATOR: Concrete Screed Highway SUWV2022-008 | $27.83 | $18.71 | $46.54 |
| OPERATOR: OPERATOR: Mechanic Highway SUWV2022-008 | $34.20 | $19.75 | $53.95 |
| OPERATOR: Paver/Spreader/Finish equipment Highway ENGI0132-035 (asphalt, aggregate, & concrete) | $37.59 | $20.30 | $57.89 |
| OPERATOR: Post Driver Highway ENGI0132-038 (Guardrail/Fences) | $37.59 | $20.30 | $57.89 |
| OPERATOR: Roller Highway ENGI0132-039 | $36.48 | $20.30 | $56.78 |
| OPERATOR: TRAFFIC CONTROL: Flagger Highway SUWV2022-008 | $25.41 | $16.50 | $41.91 |
| OPERATOR: TRUCK DRIVER: Dump Truck Highway SUWV2022-008 | $27.76 | $16.15 | $43.91 |
| PAINTER Building PAIN0970-007 (Drywall Finishing/Taping) | $30.57 | $20.06 | $50.63 |
| PAINTER: Brush, Roller and Spray Building SUWV2012-016 | $22.03 | $9.95 | $31.98 |
| PIPEFITTER, Includes HVAC Pipe Installation Building SUWV2012-016 | $27.64 | $18.09 | $45.73 |
| PIPELINE: Laborer-Pipelayer Heavy SUWV2012-055 | $21.86 | $10.89 | $32.75 |
| PLASTERER Building PLAS0926-008 | $31.97 | $25.36 | $57.33 |
| POWER EQUIPMENT OPERATOR: GROUP 1 Building ENGI0132-007 | $46.56 | $22.05 | $68.61 |
| POWER EQUIPMENT OPERATOR: GROUP 1 Heavy ENGI0132-014 | $41.95 | $20.45 | $62.40 |
| POWER EQUIPMENT OPERATOR: GROUP 2 Building ENGI0132-007 | $46.21 | $22.05 | $68.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 Heavy ENGI0132-014 Scope differs by code/WD | $39.19 | $20.45 | $59.64 |
| POWER EQUIPMENT OPERATOR: GROUP 2 Heavy ENGI0132-027 Scope differs by code/WD | $39.19 | $20.45 | $59.64 |
| POWER EQUIPMENT OPERATOR: GROUP 3 Building ENGI0132-007 | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 3 Heavy ENGI0132-014 | $38.08 | $20.45 | $58.53 |
| POWER EQUIPMENT OPERATOR: GROUP 4 Building ENGI0132-007 | $34.71 | $22.05 | $56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 4 Heavy ENGI0132-014 | $34.62 | $20.45 | $55.07 |
| POWER EQUIPMENT OPERATOR: Single and Double Axle Dump Trucks Heavy ENGI0132-029 | $41.95 | $20.45 | $62.40 |
| ROOFER Building SUWV2012-016 | $24.28 | $9.32 | $33.60 |
| SHEET METAL WORKER Building SHEE0033-013 (Includes HVAC Duct Installation) | $32.07 | $27.52 | $59.59 |
| TRAFFIC CONTROL: Maintenance Person Highway LADC0001-003 | $27.91 | $17.40 | $45.31 |
| Truck Driver: Single and Double Axle Dump Trucks Building SUWV2012-016 | $28.52 | $3.00 | $31.52 |
No trade rates match your search and filter selection.
Building
Heavy
Highway