WV20260030
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0080-002 | $38.05 | $30.87 | $68.92 |
| BOILERMAKER Building BOIL0667-005 | $47.13 | $28.93 | $76.06 |
| BRICK POINTER/CAULKER/CLEANER Building BRWV0009-001 | $31.65 | $25.56 | $57.21 |
| BRICKLAYER Building SUWV2012-028 | $27.50 | $12.35 | $39.85 |
| CARPENTER Building CARP0476-008 (All other work, excluding Drywall Hanging) | $29.74 | $23.51 | $53.25 |
| CARPENTER Building CARP1024-001 (Scaffold Builder Only) | $30.00 | $21.15 | $51.15 |
| CARPENTER Building CARP1911-004 (Floor Laying - Carpet, Hardwood, Resilient and Vinyl Only) | $30.00 | $21.15 | $51.15 |
| CARPENTER Building SUWV2012-028 (Drywall Hanging Only) | $25.08 | $12.58 | $37.66 |
| ELECTRICIAN Building SUWV2012-028 | $28.16 | $15.11 | $43.27 |
| GLAZIER Building PAIN1195-002 | $32.89 | $13.38 | $46.27 |
| Group 2 Building LABO0984-002 | $24.13 | $16.05 | $40.18 |
| Grouting Building LABO0453-003 | $22.11 | $17.25 | $39.36 |
| IRONWORKER (Ornamental) Building IRON0549-006 | $35.19 | $25.66 | $60.85 |
| IRONWORKER (Reinforcing) Building IRON0787-006 | $36.10 | $24.65 | $60.75 |
| IRONWORKER, STRUCTURAL Building SUWV2012-028 | $26.01 | $12.18 | $38.19 |
| LABORER Building LABO0543-003 | $25.41 | $16.75 | $42.16 |
| LABORER Concrete Saw Building LABO0453-003 (Hand Held/Walk Behind) | $22.76 | $16.75 | $39.51 |
| LABORER Group 1 Building LABO0984-002 | $24.13 | $16.05 | $40.18 |
| LABORER Wacker Roller Operator Building LABO0379-019 | $28.02 | $16.80 | $44.82 |
| LABORER: Demolition Building SUWV2012-028 | $20.58 | $9.47 | $30.05 |
| LABORER: Mason Tender - Brick Building SUWV2012-028 | $21.47 | $8.29 | $29.76 |
| LABORER: Mason Tender - Cement/Concrete Building SUWV2012-028 | $22.05 | $8.54 | $30.59 |
| MILLWRIGHT Building CARP0443-009 | $37.40 | $26.06 | $63.46 |
| OPERATOR: Bulldozer Building SUWV2012-028 | $30.24 | $10.26 | $40.50 |
| OPERATOR: Excavator Building SUWV2012-028 | $30.31 | $10.81 | $41.12 |
| OPERATOR: Forklift Building SUWV2012-028 | $33.09 | $3.00 | $36.09 |
| PAINTER Building PAIN0970-007 (Drywall Finishing/Taping) | $30.57 | $20.06 | $50.63 |
| PAINTER: Brush, Roller and Spray Building SUWV2012-028 | $22.03 | $9.95 | $31.98 |
| PIPEFITTER, Includes HVAC Pipe Installation Building SUWV2012-028 | $27.64 | $18.09 | $45.73 |
| POWER EQUIPMENT OPERATOR: GROUP 1 Building ENGI0132-007 | $46.56 | $22.05 | $68.61 |
| POWER EQUIPMENT OPERATOR: GROUP 2 Building ENGI0132-007 | $46.21 | $22.05 | $68.26 |
| POWER EQUIPMENT OPERATOR: GROUP 3 Building ENGI0132-007 | $45.21 | $22.05 | $67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 4 Building ENGI0132-007 | $34.71 | $22.05 | $56.76 |
| ROOFER Building SUWV2012-028 | $24.28 | $9.32 | $33.60 |
| SHEET METAL WORKER, Includes HVAC Duct Installation Building SUWV2012-028 | $25.61 | $15.68 | $41.29 |
| Truck Driver: Single and Double Axle Dump Trucks Building SUWV2012-028 | $28.52 | $3.00 | $31.52 |
No trade rates match your search and filter selection.
Building