MI20260129
rev 0Building
0 trades
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Click any row to save it for later
| Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building SUMI2011-054 | $19.82 | $7.31 | $27.13 |
| BOILERMAKER Building BOIL0169-002 | $43.50 | $37.64 | $81.14 |
| BRICKLAYER Building BRMI0009-012 | $35.83 | $22.33 | $58.16 |
| CARPENTER Building CARP0100-007 (Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation) | $31.50 | $21.15 | $52.65 |
| CARPENTER (All Other Work) Building CARP0100-010 | $31.50 | $21.15 | $52.65 |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0016-041 | $22.02 | $12.38 | $34.40 |
| ELECTRICIAN Building ELEC0275-007 (Excludes Low Voltage Wiring) | $34.41 | $9.27 | $43.68 |
| ELECTRICIAN Building ELEC0498-014 (Excluding Low Voltage) | $36.62 | $9.65 | $46.27 |
| FLOOR LAYER: Carpet Building SUMI2011-054 | $19.59 | $7.57 | $27.16 |
| GLAZIER Building SUMI2011-054 | $16.95 | $4.74 | $21.69 |
| IRONWORKER (REINFORCING) Building IRON0025-005 | $36.55 | $29.51 | $66.06 |
| IRONWORKER (STRUCTURAL) Building IRON0025-005 | $36.55 | $29.51 | $66.06 |
| IRONWORKER, STRUCTURAL Building IRON0025-009 (Metal Building Erection Only) | $30.02 | $27.43 | $57.45 |
| LABORER Common or General; Sandblaster Building LABO0355-018 | $23.34 | $11.60 | $34.94 |
| LABORER: Landscape Building SUMI2011-054 | $12.84 | 0.00 | $12.84 |
| Mason Tender - Brick/Cement/Concrete Building LABO0355-018 | $30.72 | $12.95 | $43.67 |
| MILLWRIGHT Building CARP1102-005 | $40.04 | $26.47 | $66.51 |
| OPERATOR: Bulldozer Building SUMI2011-054 | $22.34 | $1.22 | $23.56 |
| OPERATOR: Grader/Blade Building SUMI2011-054 | $24.04 | $6.03 | $30.07 |
| OPERATOR: Roller Building SUMI2011-054 | $28.02 | $7.07 | $35.09 |
| OPERATOR: Tractor Building SUMI2011-054 | $19.60 | $7.31 | $26.91 |
| PAINTER: Brush, Roller and Spray Building PAIN1803-001 | $29.23 | $19.11 | $48.34 |
| PAINTER: Drywall Finishing/Taping Building PAIN1803-001 | $30.22 | $22.22 | $52.44 |
| PIPEFITTER Building PLUM0174-006 (Excluding HVAC Pipe & System Installation) | $37.89 | $23.67 | $61.56 |
| PIPEFITTER Building PLUM0174-006 (HVAC Pipe Installation Only) | $37.09 | $22.52 | $59.61 |
| Pipelayer Building LABO0355-018 | $19.80 | $12.85 | $32.65 |
| PLASTERER Building PLAS0016-041 | $21.18 | $12.43 | $33.61 |
| PLUMBER Building PLUM0174-006 (Excluding HVAC Pipe & System Installation) | $37.89 | $23.67 | $61.56 |
| POWER EQUIPMENT OPERATOR: GROUP 1 Building ENGI0324-028 | $47.28 | $25.25 | $72.53 |
| POWER EQUIPMENT OPERATOR: GROUP 2 Building ENGI0324-028 | $43.93 | $25.25 | $69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 3 Building ENGI0324-028 | $41.28 | $25.25 | $66.53 |
| POWER EQUIPMENT OPERATOR: GROUP 4 Building ENGI0324-028 | $39.57 | $25.25 | $64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 5 Building ENGI0324-028 | $33.71 | $25.25 | $58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 6 Building ENGI0324-028 | $31.23 | $25.25 | $56.48 |
| ROOFER Building SUMI2011-054 | $15.73 | $7.41 | $23.14 |
| SHEET METAL WORKER Building SHEE0007-005 (Excluding HVAC Duct & System Installation) | $35.41 | $15.86 | $51.27 |
| SHEET METAL WORKER Building SHEE0007-005 (HVAC Duct & System Installation) | $35.41 | $15.86 | $51.27 |
| SPRINKLER FITTER Building SFMI0669-003 (Fire Sprinklers) | $41.34 | $27.39 | $68.73 |
| TILE SETTER Building BRMI0009-012 | $35.83 | $22.33 | $58.16 |
| TRUCK DRIVER, Includes Dump and Tandem Truck Building SUMI2011-054 | $15.65 | $3.12 | $18.77 |
| TRUCK DRIVER: Flatbed Truck Building SUMI2011-054 | $16.80 | $3.97 | $20.77 |
No trade rates match your search and filter selection.
Building