| CARPENTER: PILEDRIVER (REMAINDER OF STATE) | 35.57 | 21.54 | 57.11 |
| CARPENTER: PILEDRIVER | 41.37 | 28.69 | 70.06 |
| LINE CONSTRUCTION: OPERATOR B | 38.98 | 20.26 | 59.24 |
| IN OPERATING ALL POWER EQUIPMENT INCLUDING: LINE C… | 41.71 | 21.16 | 62.87 |
| IN OPERATING ALL POWER EQUIPMENT INCLUDING: LINE C… | 56.65 | 26.09 | 82.74 |
| IN OPERATING ALL POWER EQUIPMENT INCLUDING: LINE C… | 49.26 | 23.66 | 72.92 |
| IN OPERATING ALL POWER EQUIPMENT INCLUDING: LINE C… | 33.32 | 18.40 | 51.72 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 35.78 | 28.25 | 64.03 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 32.29 | 15.40 | 47.69 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 46.77 | 28.25 | 75.02 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 49.97 | 28.25 | 78.22 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 51.61 | 28.25 | 79.86 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 50.61 | 28.25 | 78.86 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 50.97 | 28.25 | 79.22 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 52.70 | 28.25 | 80.95 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 9… | 51.70 | 28.25 | 79.95 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 7… | 52.15 | 28.25 | 80.40 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5… | 52.42 | 28.25 | 80.67 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3… | 53.92 | 28.25 | 82.17 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 55.42 | 28.25 | 83.67 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6… | 35.78 | 28.25 | 64.03 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6… | 35.78 | 28.25 | 64.03 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5… | 32.29 | 15.40 | 47.69 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5… | 32.29 | 15.40 | 47.69 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4… | 46.77 | 28.25 | 75.02 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4… | 46.77 | 28.25 | 75.02 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2… | 52.15 | 28.25 | 80.40 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2… | 52.15 | 28.25 | 80.40 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 55.02 | 28.25 | 83.27 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1… | 55.02 | 28.25 | 83.27 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 30.35 | 12.10 | 42.45 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 30.35 | 12.10 | 42.45 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 39.95 | 25.25 | 65.20 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 39.95 | 25.25 | 65.20 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 40.52 | 25.25 | 65.77 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 40.52 | 25.25 | 65.77 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 41.25 | 25.25 | 66.50 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 41.25 | 25.25 | 66.50 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 45.98 | 25.25 | 71.23 |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTIO… | 45.98 | 25.25 | 71.23 |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGH… | 37.77 | 25.25 | 63.02 |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGH… | 45.06 | 25.25 | 70.31 |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGH… | 46.21 | 25.25 | 71.46 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: REGULAR… | 47.12 | 25.00 | 72.12 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: OILER A… | 41.76 | 25.00 | 66.76 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: MECHANI… | 48.90 | 25.00 | 73.90 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE O… | 50.66 | 25.00 | 75.66 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE O… | 50.07 | 24.60 | 74.67 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE O… | 49.77 | 25.00 | 74.77 |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: COMPRES… | 43.30 | 25.00 | 68.30 |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND D… | 36.05 | 25.25 | 61.30 |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND D… | 39.78 | 25.25 | 65.03 |
| IRONWORKER: GENERAL CONTRACTS LESS THAN $10,000,00… | 39.91 | 32.32 | 72.23 |
| IRONWORKER: GENERAL CONTRACTS $10,000,000 OR GREAT… | 39.91 | 32.32 | 72.23 |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR | 23.70 | 6.95 | 30.65 |
| IRONWORKER: REINFORCING | 36.55 | 32.87 | 69.42 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | 36.55 | 35.93 | 72.48 |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR… | 30.02 | 28.13 | 58.15 |
| IRONWORKER: PRE-ENGINEERED METAL BUILDINGS | 23.59 | 19.35 | 42.94 |
| IRONWORKER: ALL OTHER WORK | 33.00 | 27.20 | 60.20 |
| IRONWORKER: INCLUDING PRE-ENGINEERED METAL BUILDIN… | 31.75 | 22.84 | 54.59 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 26.21 | 16.62 | 42.83 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVEL A, B, … | 29.93 | 16.90 | 46.83 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 31.75 | 14.90 | 46.65 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 29.93 | 16.90 | 46.83 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 29.93 | 14.20 | 44.13 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 27.13 | 14.95 | 42.08 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 24.20 | 13.80 | 38.00 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 26.33 | 12.95 | 39.28 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 23.74 | 12.95 | 36.69 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B … | 21.88 | 13.26 | 35.14 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B,… | 25.18 | 12.90 | 38.08 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B,… | 17.45 | 12.75 | 30.20 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: CLASS B | 18.64 | 12.90 | 31.54 |
| LABORERS - HAZARDOUS WASTE ABATEMENT: CLASS A | 17.64 | 12.90 | 30.54 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1- TUN… | 30.13 | 22.75 | 52.88 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3- AIR… | 28.13 | 22.75 | 50.88 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1- TUN… | 32.13 | 17.95 | 50.08 |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3- AIR… | 28.00 | 17.45 | 45.45 |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER | 24.17 | 16.72 | 40.89 |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER | 25.25 | 16.72 | 41.97 |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER | 23.44 | 16.72 | 40.16 |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER | 22.45 | 16.72 | 39.17 |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER | 22.34 | 16.72 | 39.06 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 34.08 | 13.45 | 47.53 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 34.46 | 13.45 | 47.91 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 34.02 | 13.45 | 47.47 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 33.73 | 13.45 | 47.18 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 33.18 | 14.45 | 47.63 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 33.56 | 14.45 | 48.01 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 33.12 | 14.45 | 47.57 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 33.83 | 14.45 | 48.28 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 34.03 | 14.45 | 48.48 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 34.16 | 14.45 | 48.61 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 33.81 | 14.45 | 48.26 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 30.03 | 14.45 | 44.48 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 36.11 | 14.45 | 50.56 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 35.90 | 14.45 | 50.35 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 35.82 | 14.45 | 50.27 |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION… | 31.96 | 14.45 | 46.41 |
| PAINTER | 25.06 | 14.75 | 39.81 |
| PAINTER: SPRAY, SANDBLAST, SIGN PAINTING | 24.94 | 13.35 | 38.29 |
| PAINTER: BRUSH AND ROLLER | 23.74 | 13.35 | 37.09 |
| PAINTER | 25.49 | 13.74 | 39.23 |
| PAINTER | 25.49 | 13.74 | 39.23 |
| PAINTER | 25.49 | 13.74 | 39.23 |
| PAINTER | 24.66 | 14.99 | 39.65 |
| PAINTER | 23.79 | 12.02 | 35.81 |
| INVOLVING A SWING STAGE, BOATSWAIN CHAIR OR SPIDER… | 29.35 | 19.05 | 48.40 |
| CEMENT MASON/CONCRETE FINISHER: ZONE 2 | 31.50 | 18.51 | 50.01 |
| CEMENT MASON/CONCRETE FINISHER: ZONE 1 | 33.00 | 18.51 | 51.51 |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE: WE… | 33.03 | 20.19 | 53.22 |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE: PL… | 24.19 | 12.28 | 36.47 |
| FLAG PERSON | 10.10 | 0.00 | 10.10 |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER | 33.50 | 0.75 | 34.25 |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER | 33.40 | 0.75 | 34.15 |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS | 33.50 | 0.75 | 34.25 |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS | 33.40 | 0.75 | 34.15 |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS | 33.65 | 0.75 | 34.40 |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS | 33.55 | 0.75 | 34.30 |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1- T… | 24.12 | 19.04 | 43.16 |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1- T… | 23.82 | 19.04 | 42.86 |