MI20260001
rev 3Highway
122 trades
Applies to
Alcona, Alger, Allegan, Alpena, Antrim, Arenac, Baraga, Barry, Bay, Benzie +73 more
No saved rates yet
Click any row in a trade table to add it here for quick reference.
Get an email when wage determinations covering Lapeer County, Michigan are modified.
Free wage alerts plus occasional contractor resources from us and selected partners. Unsubscribe anytime. Privacy.
Click a row to save its rate for later, then export your selections from the Saved panel.
| Save | Trade & Classification | Rate | Fringe | Total |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR Residential ASBE0025-004 (MACOMB & WAYNE COUNTIES) | $40.74 | $32.59 | $73.33 | |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Residential ASBE0047-006 (LAPEER & LIVINGSTON COUNTIES) | $40.00 | $23.65 | $63.65 | |
| ASBESTOS WORKER/HEAT & FROST INSULATOR Building ASBE0047-002 | $40.00 | $23.65 | $63.65 | |
| BOILERMAKER Heavy BOIL0169-003 | $43.50 | $36.74 | $80.24 | |
| BOILERMAKER Building BOIL0169-001 | $43.50 | $36.74 | $80.24 | |
| CARPENTER Building CARP0706-005 (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION & SCAFFOLD BUILDING) | $36.46 | $23.69 | $60.15 | |
| CARPENTER Building CARP0706-006 (FLOOR LAYER - CARPET, RESILIENT & VINYL FLOORING) | $35.86 | $23.69 | $59.55 | |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET Residential CARP0706-013 (EXCLUDES FORMWORK) (LAPEER COUNTY) | $36.46 | $22.69 | $59.15 | |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET Residential CARP1004-010 (EXCLUDES FORMWORK) (LIVINGSTON COUNTY (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO & MARION)) | $36.21 | $21.06 | $57.27 | |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET Residential CARP1234-001 (EXCLUDES FORMWORK): SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS (LIVINGSTON (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOE & HARTLAND), MACOMB & WAYNE COUNTIES) | $29.19 | $15.76 | $44.95 | |
| CARPENTER, INCLUDES FLOOR LAYING-CARPET Residential CARP1234-001 (EXCLUDES FORMWORK): MULTI-FAMILY CONDOMINIUMS (LIVINGSTON (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOE & HARTLAND), MACOMB & WAYNE COUNTIES) | $31.58 | $16.27 | $47.85 | |
| CARPENTER, INCLUDES FORM WORK Heavy CARP0706-016 Scope differs by code/WD | $36.46 | $23.69 | $60.15 | |
| CARPENTER, INCLUDES FORM WORK Heavy CARP0706-016 Scope differs by code/WD | $36.46 | $23.69 | $60.15 | |
| CARPENTER: PILEDRIVER Highway CARP0004-005 (LIVINGSTON (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, HARTLAND, OCEOLA & TYRONE), MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES) | $41.37 | $28.69 | $70.06 | |
| CARPENTER: PILEDRIVER (REMAINDER OF STATE) Highway CARP0004-004 | $35.57 | $21.54 | $57.11 | |
| CEMENT MASON/CONCRETE FINISHER Residential SUMI2010-026 | $19.27 | $5.85 | $25.12 | |
| CEMENT MASON/CONCRETE FINISHER Heavy PLAS0016-029 | $27.77 | $12.88 | $40.65 | |
| CEMENT MASON/CONCRETE FINISHER Building PLAS0016-029 | $27.77 | $12.88 | $40.65 | |
| CEMENT MASON/CONCRETE FINISHER: ZONE 1 Highway PLAS0514-001 (GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, SAGINAW, WASHTENAW AND WAYNE COUNTIES) | $33.00 | $18.51 | $51.51 | |
| CEMENT MASON/CONCRETE FINISHER: ZONE 2 Highway PLAS0514-001 (ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $31.50 | $18.51 | $50.01 | |
| DRYWALL FINISHER/TAPER: DRYWALL SANDING Building PAIN1052-011 (WEST OF HWY. M-53) | $33.54 | $18.03 | $51.57 | |
| DRYWALL FINISHER/TAPER: HAND WORK Building PAIN1052-011 (WEST OF HWY. M-53) | $27.15 | $15.00 | $42.15 | |
| DRYWALL FINISHER/TAPER: MACHINE WORK Building PAIN1052-011 (WEST OF HWY. M-53) | $27.15 | $15.00 | $42.15 | |
| ELECTRICIAN Heavy ELEC0948-009 | $44.83 | $26.96 | $71.79 | |
| ELECTRICIAN Building ELEC0948-003 (EXCLUDES ALARM INSTALLATION & LOW VOLTAGE WIRING) | $44.83 | $26.96 | $71.79 | |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING Residential ELEC0058-006 (LIVINGSTON (TOWNSHIPS OF BRIGHTON, DEERFIELD, GENOA, HARTLAND, OCEOLA AND TYRONE), MACOMB & WAYNE COUNTIES) | $29.42 | $16.50 | $45.92 | |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING Residential ELEC0252-004 (LIVINGSTON COUNTY (TOWNSHIPS OF GREEN OAK, HAMBURG, PUTNAM AND UNADILLA)) | $36.65 | $20.38 | $57.03 | |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING Residential ELEC0665-011 (LIVINGSTON COUNTY (TOWNSHIPS OF COHOCTAH, CONWAY, HANDY, HOWELL, IOSCO AND MARION)) | $31.20 | $10.97 | $42.17 | |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING Residential ELEC0948-005 (LAPEER COUNTY) | $35.62 | $13.70 | $49.32 | |
| ELEVATOR MECHANIC Residential ELEV0036-001 (MACOMB & WAYNE COUNTIES) OF SERVICE, 6% FOR 6 MONTHS TO 5 YEARS SERVICE. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $65.01 | $38.44 | $103.45 | |
| ELEVATOR MECHANIC Residential ELEV0085-001 (LAPEER & LIVINGSTON COUNTIES) YEARS OF SERVICE, 6% FOR 6 MONTHS TO 5 YEARS SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND FRIDAY AFTER, AND CHRISTMAS DAY | $65.45 | $38.44 | $103.89 | |
| FLAG PERSON Highway SUMI2002-001 | $10.10 | 0.00 | $10.10 | |
| GLAZIER Residential SUMI2010-026 | $23.00 | $8.17 | $31.17 | |
| GLAZIER Building PAIN0826-002 | $37.41 | $18.99 | $56.40 | |
| IN OPERATING ALL POWER EQUIPMENT INCLUDING: LINE CONSTRUCTION: GROUNDMAN/DRIVER Highway ELEC0017-005 | $33.32 | $18.40 | $51.72 | |
| IN OPERATING ALL POWER EQUIPMENT INCLUDING: LINE CONSTRUCTION: JOURNEYMAN SIGNAL TECH, COMMUNICATIONS TECH, TOWER TECH & FIBER OPTIC SPLICERS Highway ELEC0017-005 | $49.26 | $23.66 | $72.92 | |
| IN OPERATING ALL POWER EQUIPMENT INCLUDING: LINE CONSTRUCTION: JOURNEYMAN SPECIALIST JOURNEYMAN SPECIALIST: REFERS TO A CREW OF ONLY ONE PERSON WORKING ALONE Highway ELEC0017-005 | $56.65 | $26.09 | $82.74 | |
| IN OPERATING ALL POWER EQUIPMENT INCLUDING: LINE CONSTRUCTION: OPERATOR A Highway ELEC0017-005 (SHALL BE PROFICIENT BACKHOE, EXCAVATOR, DIRECTIONAL BORE AND BOOM/DIGGER TRUCK.) | $41.71 | $21.16 | $62.87 | |
| INSTALLER - OVERHEAD DOOR Building SUMI2011-014 | $27.98 | 0.00 | $27.98 | |
| INVOLVING A SWING STAGE, BOATSWAIN CHAIR OR SPIDER: PAINTER: ALL OTHER WORK, INCLUDING MAINTENANCE OF INDUSTRIAL PLANT Highway PAIN1803-003 (ALCONA, ALPENA, ANTRIM, ARENAC, BAY, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT, IOSCO, ISABELLA, KALKASKA, LAKE, LEELANAU, MANISTEE, MASON, MIDLAND, MISSAUKEE, MONTMORENCY AND OGEMAW COUNTIES; OSCEOLA COUNTY (NORTH OF HWY. #10); OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW AND WEXFORD COUNTIES) FOOTNOTES: SPRAY PAINTING, SANDBLASTING, BLOWDOWN ASSOCIATED WITH SPRAYING AND BLASTING, WATER BLASTING AND WORK INSIDE TANKS, VESSELS, TANK TRAILERS, RAILROAD CARS, SEWERS, SMOKE STACKS, BOILERS OR OTHER SPACES HAVING LIMITED EGRESS NOT INCLUDING BUILDINGS, OPENTOP TANKS, PITS, ETC.: $1.25 PER HOUR ADDITIONAL | $29.35 | $19.05 | $48.40 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $23.70 | $6.95 | $30.65 | |
| IRONWORKER - PRE-ENGINEERED METAL BUILDING ERECTOR: BAY, GENESEE, LAPEER, LIVINGSTON Highway IRON0025-002 (EAST OF BURKHARDT ROAD), MACOMB, MIDLAND, OAKLAND, SAGINAW, ST. CLAIR, THE UNIVERSITY OF MICHIGAN, WASHTENAW (EAST OF U.S. 23) & WAYNE (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES | $30.02 | $28.13 | $58.15 | |
| IRONWORKER, ORNAMENTAL Building SUMI2011-014 | $18.48 | $7.93 | $26.41 | |
| IRONWORKER, STRUCTURAL Residential IRON0025-004 | $36.55 | $35.93 | $72.48 | |
| IRONWORKER: ALL OTHER WORK Highway IRON0055-005 (LENAWEE AND MONROE COUNTIES) | $33.00 | $27.20 | $60.20 | |
| IRONWORKER: GENERAL CONTRACTS $10,000,000 OR GREATER Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $39.91 | $32.32 | $72.23 | |
| IRONWORKER: GENERAL CONTRACTS LESS THAN $10,000,000 Highway IRON0008-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | $39.91 | $32.32 | $72.23 | |
| IRONWORKER: INCLUDING PRE-ENGINEERED METAL BUILDING ERECTOR (BERRIEN AND CASS COUNTIES:) Highway IRON0292-003 | $31.75 | $22.84 | $54.59 | |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL Highway IRON0025-002 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) | $36.55 | $35.93 | $72.48 | |
| IRONWORKER: PRE-ENGINEERED METAL BUILDINGS Highway IRON0055-005 (LENAWEE AND MONROE COUNTIES) | $23.59 | $19.35 | $42.94 | |
| IRONWORKER: REINFORCING Highway IRON0025-002 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) | $36.55 | $32.87 | $69.42 | |
| IRONWORKER: REINFORCING Heavy IRON0025-006 | $36.55 | $33.37 | $69.92 | |
| IRONWORKER: REINFORCING Building IRON0025-019 | $36.55 | $33.37 | $69.92 | |
| IRONWORKER: STRUCTURAL Heavy IRON0025-006 | $36.55 | $35.93 | $72.48 | |
| IRONWORKER: STRUCTURAL Building IRON0025-019 Scope differs by code/WD | $36.55 | $35.93 | $72.48 | |
| IRONWORKER: STRUCTURAL Building IRON0025-022 (METAL BUILDING ERECTION ONLY) | $30.02 | $27.43 | $57.45 | |
| LABORER ((1) COMMON OR GENERAL) Heavy LABO0334-015 | $23.39 | $13.15 | $36.54 | |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) Heavy LABO0334-015 | $23.53 | $13.15 | $36.68 | |
| LABORER ((4) GRADE CHECKER) Heavy LABO0334-015 | $23.70 | $13.15 | $36.85 | |
| LABORER ((5) PIPELAYER) Heavy LABO0334-015 | $23.84 | $13.52 | $37.36 | |
| LABORER ((7) LANDSCAPE) Heavy LABO0334-015 | $18.29 | $12.85 | $31.14 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 2- MIXER OPERATOR Highway LABO0465-001 (LESS THAN 5 SACKS); AIR OR ELECTRIC TOOL OPERATOR (JACKHAMMER, ETC.); SPREADER; BOXPERSON (ASPHALT, STONE, GRAVEL); CONCRETE PADDLER; POWER CHAIN SAW OPERATOR; PAVING BATCH TRUCK DUMPER; TUNNEL MUCKER (HIGHWAY WORK ONLY); CONCRETE SAW (UNDER 40 H.P.) AND DRY PACK MACHINE; ROTO-MILL GROUNDS PERSON. (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $31.96 | $14.45 | $46.41 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 3- TUNNEL MINER Highway LABO0465-001 (HIGHWAY WORK ONLY); FINISHERS TENDERS; GUARD RAIL BUILDERS; HIGHWAY AND MEDIAN BARRIER INSTALLER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S (INCLUDING SOUND, RETAINING AND CRASH BARRIERS); FENCE ERECTOR; BOTTOM PERSON; POWEDER PERSON; WAGON DRILL AND AIR TRACK OPERATOR; DIAMOND AND CORE DRILLS; GRADE CHECKER; CERTIFIED WELDERS; CURB AND SIDE RAIL SETTER'S TENDER. (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $35.82 | $14.45 | $50.27 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 4- ASPHALT RAKER Highway LABO0465-001 (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $35.90 | $14.45 | $50.35 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 1: GROUP 5- PIPE LAYERS, OXY-GUN Highway LABO0465-001 (AREA 1: GENESE, MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES) | $36.11 | $14.45 | $50.56 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 2- MIXER OPERATOR Highway LABO0465-001 (LESS THAN 5 SACKS); AIR OR ELECTRIC TOOL OPERATOR (JACKHAMMER, ETC.); SPREADER; BOXPERSON (ASPHALT, STONE, GRAVEL); CONCRETE PADDLER; POWER CHAIN SAW OPERATOR; PAVING BATCH TRUCK DUMPER; TUNNEL MUCKER (HIGHWAY WORK ONLY); CONCRETE SAW (UNDER 40 H.P.) AND DRY PACK MACHINE; ROTO-MILL GROUNDS PERSON. (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $30.03 | $14.45 | $44.48 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 3- TUNNEL MINER Highway LABO0465-001 (HIGHWAY WORK ONLY); FINISHERS TENDERS; GUARD RAIL BUILDERS; HIGHWAY AND MEDIAN BARRIER INSTALLER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S (INCLUDING SOUND, RETAINING AND CRASH BARRIERS); FENCE ERECTOR; BOTTOM PERSON; POWEDER PERSON; WAGON DRILL AND AIR TRACK OPERATOR; DIAMOND AND CORE DRILLS; GRADE CHECKER; CERTIFIED WELDERS; CURB AND SIDE RAIL SETTER'S TENDER. (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $33.81 | $14.45 | $48.26 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 4- ASPHALT RAKER Highway LABO0465-001 (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $34.16 | $14.45 | $48.61 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 2: GROUP 5- PIPE LAYERS, OXY-GUN Highway LABO0465-001 (AREA 2: ALLEGAN, BARRY, BAY, BERRIEN, BRANCH, CALHOUN, CASS, CLINTON, EATON, GRATIOT, HILLSDALE, HURON, INGHAM, JACKSON, KALAMAZOO, LAPEER, LENAWEE, LIVINGSTON, MIDLAND, MUSKEGON, SAGINAW, SANILACK, SHIAWASSEE, ST. CLAIR, ST. JOSEPH, TUSCOLA, AND VAN BUREN COUNTIES) | $34.03 | $14.45 | $48.48 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 2- MIXER OPERATOR Highway LABO0465-001 (LESS THAN 5 SACKS); AIR OR ELECTRIC TOOL OPERATOR (JACKHAMMER, ETC.); SPREADER; BOXPERSON (ASPHALT, STONE, GRAVEL); CONCRETE PADDLER; POWER CHAIN SAW OPERATOR; PAVING BATCH TRUCK DUMPER; TUNNEL MUCKER (HIGHWAY WORK ONLY); CONCRETE SAW (UNDER 40 H.P.) AND DRY PACK MACHINE; ROTO-MILL GROUNDS PERSON. (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.83 | $14.45 | $48.28 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 3- TUNNEL MINER Highway LABO0465-001 (HIGHWAY WORK ONLY); FINISHERS TENDERS; GUARD RAIL BUILDERS; HIGHWAY AND MEDIAN BARRIER INSTALLER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S (INCLUDING SOUND, RETAINING AND CRASH BARRIERS); FENCE ERECTOR; BOTTOM PERSON; POWEDER PERSON; WAGON DRILL AND AIR TRACK OPERATOR; DIAMOND AND CORE DRILLS; GRADE CHECKER; CERTIFIED WELDERS; CURB AND SIDE RAIL SETTER'S TENDER. (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.12 | $14.45 | $47.57 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 4- ASPHALT RAKER Highway LABO0465-001 (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.56 | $14.45 | $48.01 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 3: GROUP 5- PIPE LAYERS, OXY-GUN Highway LABO0465-001 (AREA 3: ALCONA, ALPENA, ANTRIM, ARENAC, BENZIE, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, IONIA, IOSCO, ISABELLA, KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA, MISSAUKEE, MONTCALM, MONTMORENCY, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PREQUE ISLE, ROSCOMMON, AND WEXFORD COUNTIES) | $33.18 | $14.45 | $47.63 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 2- MIXER OPERATOR Highway LABO0465-001 (LESS THAN 5 SACKS); AIR OR ELECTRIC TOOL OPERATOR (JACKHAMMER, ETC.); SPREADER; BOXPERSON (ASPHALT, STONE, GRAVEL); CONCRETE PADDLER; POWER CHAIN SAW OPERATOR; PAVING BATCH TRUCK DUMPER; TUNNEL MUCKER (HIGHWAY WORK ONLY); CONCRETE SAW (UNDER 40 H.P.) AND DRY PACK MACHINE; ROTO-MILL GROUNDS PERSON. (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $33.73 | $13.45 | $47.18 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 3- TUNNEL MINER Highway LABO0465-001 (HIGHWAY WORK ONLY); FINISHERS TENDERS; GUARD RAIL BUILDERS; HIGHWAY AND MEDIAN BARRIER INSTALLER; EARTH RETENTION BARRIER AND WALL AND M.S.E. WALL INSTALLER'S (INCLUDING SOUND, RETAINING AND CRASH BARRIERS); FENCE ERECTOR; BOTTOM PERSON; POWEDER PERSON; WAGON DRILL AND AIR TRACK OPERATOR; DIAMOND AND CORE DRILLS; GRADE CHECKER; CERTIFIED WELDERS; CURB AND SIDE RAIL SETTER'S TENDER. (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $34.02 | $13.45 | $47.47 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 4- ASPHALT RAKER Highway LABO0465-001 (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $34.46 | $13.45 | $47.91 | |
| LABORER- HIGHWAY, BRIDGE, AND AIRPORT CONSTRUCTION AREA 4: GROUP 5- PIPE LAYERS, OXY-GUN Highway LABO0465-001 (AREA 4: ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON, AND SCHOOL CRAFT COUNTIES) | $34.08 | $13.45 | $47.53 | |
| LABORER: ASBESTOS ABATEMENT Building LABO0259-002 (REMOVAL FROM FLOORS, WALLS & CEILINGS) | $39.08 | $15.92 | $55.00 | |
| LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE Residential LABO1076-004 (LIVINGSTON COUNTY (NORTH OF HIGHWAY M-59 AND EAST OF OAK GROVE ROAD)) | $38.00 | $18.25 | $56.25 | |
| LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LAPEER COUNTY) Residential LABO1075-008 | $29.46 | $16.10 | $45.56 | |
| LABORER: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (LIVINGSTON COUNTY) Residential LABO0499-009 | $38.11 | $15.45 | $53.56 | |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK/CEMENT/CONCRETE, PIPELAYER; SANDBLASTER Building LABO1075-002 | $29.46 | $16.10 | $45.56 | |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER Heavy LABO1075-010 (EXCLUDES OPEN CUT CONSTRUCTION) | $29.46 | $16.10 | $45.56 | |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER Building LABO0334-005 (OR EQUIVALENT) | $29.93 | $9.10 | $39.03 | |
| LABORER: PIPELAYER Residential SUMI2010-026 | $17.99 | $5.46 | $23.45 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: CLASS A Highway LABO0005-006 (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE, AND WEXFORD COUNTIES- ZONE 10) | $17.64 | $12.90 | $30.54 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: CLASS B Highway LABO0005-006 (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE, AND WEXFORD COUNTIES- ZONE 10) | $18.64 | $12.90 | $31.54 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVEL A, B, C Highway LABO0005-006 (OAKLAND COUNTY AND THE NORTHEAST PORTION OF LIVINGSTON COUNTY BORDERED BY OAK GROVE ROAD ON THE WEST AND M-59 ON THE SOUTH - ZONE 2) | $29.93 | $16.90 | $46.83 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C Highway LABO0005-006 (LIVINGSTON COUNTY (EAST OF OAK GROVE RD. AND SOUTH OF M-59, EXCLUDING THE CITY OF HOWELL); AND WASHTENAW COUNTY - ZONE 3) | $29.93 | $14.20 | $44.13 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C Highway LABO0005-006 (HILLSDALE, JACKSON AND LENAWEE COUNTIES - ZONE 4) | $27.13 | $14.95 | $42.08 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C Highway LABO0005-006 (GENESEE, LAPEER AND SHIAWASSEE COUNTIES - ZONE 7) | $24.20 | $13.80 | $38.00 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C Highway LABO0005-006 (CLINTON, EATON AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); LIVINGSTON COUNTY (WEST OF OAK GROVE RD., INCLUDING THE CITY OF HOWELL) - ZONE 6) | $26.33 | $12.95 | $39.28 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C Highway LABO0005-006 (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW AND TUSCOLA COUNTIES - ZONE 8) | $23.74 | $12.95 | $36.69 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C Highway LABO0005-006 (ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH AND VAN BUREN COUNTIES - ZONE 9) . | $21.88 | $13.26 | $35.14 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (MACOMB AND WAYNE COUNTIES - ZONE 1) Highway LABO0005-006 | $29.93 | $16.90 | $46.83 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (MONROE COUNTY - ZONE 4) Highway LABO0005-006 | $31.75 | $14.90 | $46.65 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B OR C. (SANILAC AND ST. CLAIR COUNTIES - ZONE 5) Highway LABO0005-006 | $26.21 | $16.62 | $42.83 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B, OR C Highway LABO0005-006 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES - ZONE 11) | $25.18 | $12.90 | $38.08 | |
| LABORERS - HAZARDOUS WASTE ABATEMENT: LEVELS A, B, OR C Highway LABO0005-006 (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE, AND WEXFORD COUNTIES- ZONE 10) | $17.45 | $12.75 | $30.20 | |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER Highway LABO0334-001 (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 1 - MACOMB, OAKLAND AND WAYNE COUNTIES) | $24.17 | $16.72 | $40.89 | |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER Highway LABO0334-001 (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 2 - LIVINGSTON COUNTY (EAST OF M-151 (OAK GROVE RD.)); MONROE AND WASHTENAW COUNTIES) | $25.25 | $16.72 | $41.97 | |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER Highway LABO0334-001 (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 3 - CLINTON, EATON, GENESEE, HILLSDALE AND INGHAM COUNTIES; IONIA COUNTY (CITY OF PORTLAND); JACKSON, LAPEER AND LENAWEE COUNTIES; LIVINGSTON COUNTY (WEST OF M-151 OAK GROVE RD.); SANILAC, ST. CLAIR AND SHIAWASSEE COUNTIES) | $23.44 | $16.72 | $40.16 | |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER Highway LABO0334-001 (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 4 - ALCONA, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CLARE, CRAWFORD, EMMET, GLADWIN, GRAND TRAVERSE, GRATIOT AND HURON COUNTIES; IONIA COUNTY (EXCEPT THE CITY OF PORTLAND); IOSCO, ISABELLA, KALAMAZOO, KALKASKA, KENT, LAKE,LEELANAU, MANISTEE, MASON, MECOSTA, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOOMMON, SAGINAW, ST. JOSEPH, TUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $22.45 | $16.72 | $39.17 | |
| LABORERS - OPEN CUT: GROUP 5- PIE LAYER Highway LABO0334-001 (INCLUDING CROCK, METAL PIPE, MULTI-PLATE OR OTHER CONDUITS). CONSTRUCTION LABORER SCOPE OF WORK: OPEN CUT CONSTRUCTION WORK SHALL BE CONSTRUED TO MEAN WORK WHICH REQUIRES THE EXCAVATION OF EARTH INCLUDING INDUSTRIAL, COMMERCIAL AND RESIDENTIAL BUILDING SITE EXCAVATION AND PREPARATION, LAND BALANCING, DEMOLITION AND REMOVAL OF CONCRETE AND UNDERGROUND APPURTENANCES, GRADING, PAVING, SEWERS, UTILITIES AND IMPROVEMENTS; RETENTION, OXIDATION, FLOCCULATION AND IRRIGATION FACILITIES, AND ALSO INCLUDING BUT NOT LIMITED TO UNDERGROUND PIPING, CONDUITS, STEEL SHEETING FOR UNDERGROUND CONSTRUCTION, AND ALL WORK INCIDENTAL THERETO, AND GENERAL EXCAVATION. FOR ALL AREAS EXCEPT THE UPPER PENINSULA, OPEN CUT CONSTRUCTION WORK SHALL ALSO BE CONSTRUED TO MEAN WATERFRONT WORK, PIERS, DOCKS, SEAWALLS, BREAKWALLS, MARINAS AND ALL INCIDENTAL WORK. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS, OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION WORK AND EXCAVATION FOR THE BUILDING ITSELF AND BACK FILLING INSIDE OF AND WITHIN 5 FT. OF THE BUILDING AND FOUNDATIONS, FOOTINGS AND PIERS FOR THE BUILDING. OPEN CUT CONSTRUCTION WORK SHALL NOT INCLUDE ANY WORK COVERED UNDER TUNNEL, SHAFT AND CAISSON WORK. (ZONE 5 - ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) | $22.34 | $16.72 | $39.06 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1- TUNNEL, SHAFT AND CAISSON LABORER, DUMP, SHANTY, HOG HOUSE TENDER, TESTING Highway LABO0259-001 (ON GAS) AND WATCHMAN. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $30.13 | $22.75 | $52.88 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 1- TUNNEL, SHAFT AND CAISSON LABORER, DUMP, SHANTY, HOG HOUSE TENDER, TESTING Highway LABO0259-001 (ON GAS) AND WATCHMAN. SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $32.13 | $17.95 | $50.08 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3- AIR TOOL OPERATOR Highway LABO0259-001 (JACKHAMMER, BUSH HAMMER AND GRINTER), FIRST BOTTOM, SECOND BOTTOM, CAGE TENDER, CAR PUSHER, CARRIER, CONCRETE, CONCRETE FORM, CONCRETE REPAIR, CEMENT INVERT LABORER, CEMENT FINISHER, CONCRETE SHOVELER, CONVEYOR, FLOOR, GASOLINE AND ELECTRIC TOOL OPERATOR, GUNITE, GROUT OPERATOR, WELDER, HEADING DINKY PERSON, INSIDE LOCK TENDER, PEA GRAVEL OPERATOR, PUMP, OUTSIDE LOCK TENDER, SCAFFOLD, TOP SIGNAL PERSON, SWITCH PERSON, TRACK, TUGGER, UTILITY PERSON, VIBRATOR, WINCH OPERATOR, PIPE JACKING, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.). SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. (AREA 1: MACOMB, OAKLAND, AND WAYNE COUNTIES) | $28.13 | $22.75 | $50.88 | |
| LABORERS - TUNNEL, SHAFT AND CAISSON: GROUP 3- AIR TOOL OPERATOR Highway LABO0259-001 (JACKHAMMER, BUSH HAMMER AND GRINTER), FIRST BOTTOM, SECOND BOTTOM, CAGE TENDER, CAR PUSHER, CARRIER, CONCRETE, CONCRETE FORM, CONCRETE REPAIR, CEMENT INVERT LABORER, CEMENT FINISHER, CONCRETE SHOVELER, CONVEYOR, FLOOR, GASOLINE AND ELECTRIC TOOL OPERATOR, GUNITE, GROUT OPERATOR, WELDER, HEADING DINKY PERSON, INSIDE LOCK TENDER, PEA GRAVEL OPERATOR, PUMP, OUTSIDE LOCK TENDER, SCAFFOLD, TOP SIGNAL PERSON, SWITCH PERSON, TRACK, TUGGER, UTILITY PERSON, VIBRATOR, WINCH OPERATOR, PIPE JACKING, WAGON DRILL AND AIR TRACK OPERATOR AND CONCRETE SAW OPERATOR (UNDER 40 H.P.). SCOPE OF WORK: TUNNEL, SHAFT, AND CAISSON WORK OF EVERY TYPE AND DESCRIPTION AND ALL OPERATIONS INCIDENTAL THERETO, INCLUDING, BUT NOT LIMITED TO, SHAFTS AND TUNNELS FOR SEWERS , WATER, SUBWAYS, TRANSPORTATION, DIVERSION, SEWERAGE, CAVERNS, SHELTERS, AQUAFERS, RESERVOIRS, MISSILE SILOS AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION.(AREA 2: REMAINING COUNTIES) | $28.00 | $17.45 | $45.45 | |
| LABORERS: COMMON OR GENERAL; FORMWORK; MASON TENDER - CEMENT/CONCRETE (MACOMB AND WAYNE COUNTIES) Residential LABO1191-001 | $38.00 | $18.25 | $56.25 | |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) Heavy LABO0334-009 | $29.93 | $9.10 | $39.03 | |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER Heavy LABO0334-009 | $27.71 | $9.10 | $36.81 | |
| LANDSCAPE LABORER: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) Residential LABO0334-020 | $29.93 | $9.10 | $39.03 | |
| LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER Residential LABO0334-020 | $27.71 | $9.10 | $36.81 | |
| LINE CONSTRUCTION: LINEMEN/CABLE SPLICER Heavy ELEC0017-003 | $61.06 | $25.11 | $86.17 | |
| LINE CONSTRUCTION: OPERATOR B Highway ELEC0017-005 (SHALL BE PROFICIENT IN OPERATING ANY 2 OF THE ABOVE MENTIONED PIECES OF EQUIPMENT LISTED UNDER OPERATOR A.) | $38.98 | $20.26 | $59.24 | |
| MILLWRIGHT Building CARP1102-002 | $42.92 | $39.13 | $82.05 | |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK Heavy ENGI0326-011 (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK Heavy ENGI0326-011 (NON-SWINGING) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK Heavy ENGI0326-011 (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.46 | $25.25 | $60.71 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: COMPRESSOR, WELDER AND FORKLIFT Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $43.30 | $25.00 | $68.30 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 120' OR LONGER Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $49.77 | $25.00 | $74.77 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 140' OR LONGER Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $50.07 | $24.60 | $74.67 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: CRANE OPERATOR, MAIN BOOM & JIB 220' OR LONGER Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $50.66 | $25.00 | $75.66 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1- CRANE OPERATOR WITH MAIN BOOM & JIB 400', 300', OR 220' OR LONGER Highway ENGI0324-004 (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $55.02 | $28.25 | $83.27 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1- CRANE OPERATOR WITH MAIN BOOM & JIB 400', 300', OR 220' OR LONGER Highway ENGI0324-004 (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $55.02 | $28.25 | $83.27 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 1- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 400' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $55.42 | $28.25 | $83.67 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 10- TOWER CRANE & DERRICK OPERATOR Highway ENGI0324-003 (WHERE OPERATOR'S WORK STATION IS 50 FT. OR MORE ABOVE FIRST SUB-LEVEL) ON A CRANE THAT REQUIRES AN OILER (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.70 | $28.25 | $80.95 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 11- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 120' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.97 | $28.25 | $79.22 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 13- CRANE OPERATOR; JOB MECHANIC AND 3 DRUM HOIST AND EXCAVATOR Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.61 | $28.25 | $78.86 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 14- CRANE OPERATOR ON A CRANE THAT REQUIRES AN OILER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.61 | $28.25 | $79.86 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 15- HOISTING OPERATOR; 2 DRUM HOIST AND RUBBER TIRED BACKHOE Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $49.97 | $28.25 | $78.22 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 16- FORKLIFT AND 1 DRUM HOIST Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $46.77 | $28.25 | $75.02 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 17- COMPRESSOR OR WELDER OPERATOR Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $32.29 | $15.40 | $47.69 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 18- OILER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $35.78 | $28.25 | $64.03 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2- CRANE OPERATOR WITH MAIN BOOM & JIB 140' OR LONGER, TOWER CRANE; GANTRY CRANE; WHIRLEY DERRICK Highway ENGI0324-004 (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $52.15 | $28.25 | $80.40 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 2- CRANE OPERATOR WITH MAIN BOOM & JIB 140' OR LONGER, TOWER CRANE; GANTRY CRANE; WHIRLEY DERRICK Highway ENGI0324-004 (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $52.15 | $28.25 | $80.40 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 3- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 300' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $53.92 | $28.25 | $82.17 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4- AIR TUGGER Highway ENGI0324-004 (SINGLE DRUM), MATERIAL HOIST PUMP 6"" OR OVER, ELEVATORS, BROKK CONCRETE BREAKER. (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $46.77 | $28.25 | $75.02 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 4- AIR TUGGER Highway ENGI0324-004 (SINGLE DRUM), MATERIAL HOIST PUMP 6"" OR OVER, ELEVATORS, BROKK CONCRETE BREAKER. (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $46.77 | $28.25 | $75.02 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 220' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.42 | $28.25 | $80.67 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5-AIR COMPRESSOR, WELDER, GENERATORS, CONVEYORS Highway ENGI0324-004 (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $32.29 | $15.40 | $47.69 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 5-AIR COMPRESSOR, WELDER, GENERATORS, CONVEYORS Highway ENGI0324-004 (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $32.29 | $15.40 | $47.69 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6- OILER AND FIRE TENDER Highway ENGI0324-004 (AREA 2: ANTRIM, BREEZE, CHARLEVOIX, EMMET, GRAND TRAVERSE, KALKASKA, LEELANAU, MISSAUKEE, AND WEXFORD COUNTIES) 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $35.78 | $28.25 | $64.03 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 6-OILER AND FIRE TENDER Highway ENGI0324-004 (AREA 1: ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, EATON, HILLSDALE, IONIA, KALAMAZOO, KENT, LAKE, MANISTEE, MASON, MECOSTA, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA, OTTAWA, ST. JOSEPH, AND VAN BUREN COUNTIES) FOOTNOTE: CRANE OPERATOR WITH MAIN BOOM AND JIB 300; OR LONGER: $1.50 ADDITIONAL TO THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400; OR LONGER: $3.00 ADDITIONAL TO THE GROUP 1 RATE. PAID HOLIDYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $35.78 | $28.25 | $64.03 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 7- ENGINEER WHEN OPERATING COMBINATION OF BOOM AND JIB 140' OR LONGER Highway ENGI0324-003 (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.15 | $28.25 | $80.40 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: GROUP 9- TOWER CRANE & DERRICK OPERATOR Highway ENGI0324-003 (WHERE OPERATOR'S WORK STATION IS 50 FT. OR MORE ABOVE FIRST SUB-LEVEL) (ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON, CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO, ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB, MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC, SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:) FOOTNOTE: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.70 | $28.25 | $79.95 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: MECHANIC WITH TRUCK AND TOOLS Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $48.90 | $25.00 | $73.90 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: OILER AND FIREMAN Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $41.76 | $25.00 | $66.76 | |
| OPERATOR: POWER EQUIPMENT, STEEL ERECTION: REGULAR OPERATOR Highway ENGI0324-007 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES:) | $47.12 | $25.00 | $72.12 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 5- FIRE PERSON, OILER (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $30.35 | $12.10 | $42.45 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 5- FIRE PERSON, OILER (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $30.35 | $12.10 | $42.45 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 4- BOILER; CONCRETE SAW (40 HP OR OVER); CURING MACHINE (SELF-PROPELLED); FARM TRACTOR (WITH ATTACHMENT); FINISHING MACHINE (CONCRETE); HYDRAULIC PIPE PUSHING MACHINE; MULCHING EQUIPMENT; PUMPS (2 OR MORE UP TO 4-IN. DISCHARGE, IF USED 3 OR MORE HOURS A DAY, GAS OR DIESEL POWERED0-EXCLUDING SUBMERSIBLE PUMPS); ROLLER (OTHER THAN ASPHALT); STUMP REMOVER; TRENCHER (SERVICE); VIBRATING COMPACTION EQUIPMENT, SELF-PROPELLED (6 FT. WIDE OR OVER); SWEEPER (WAYNE TYPE); WATER WAGON AND EXTEND-A BOOM FORKLIFT. (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $39.95 | $25.25 | $65.20 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 4- BOILER; CONCRETE SAW (40 HP OR OVER); CURING MACHINE (SELF-PROPELLED); FARM TRACTOR (WITH ATTACHMENT); FINISHING MACHINE (CONCRETE); HYDRAULIC PIPE PUSHING MACHINE; MULCHING EQUIPMENT; PUMPS (2 OR MORE UP TO 4-IN. DISCHARGE, IF USED 3 OR MORE HOURS A DAY, GAS OR DIESEL POWERED0-EXCLUDING SUBMERSIBLE PUMPS); ROLLER (OTHER THAN ASPHALT); STUMP REMOVER; TRENCHER (SERVICE); VIBRATING COMPACTION EQUIPMENT, SELF-PROPELLED (6 FT. WIDE OR OVER); SWEEPER (WAYNE TYPE); WATER WAGON AND EXTEND-A BOOM FORKLIFT. (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $39.95 | $25.25 | $65.20 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 3- AIR COMPRESSORS (600 CFM OR LARGER); AIR COMPRESSORS (2 OR MORE-LESS THAN 600 CFM); BOOM TRUCK (NON-SWINGING, NON-POWERED TYPE BOOM); CONCRETE BREAKER (SELF-PROPELLED OR TRUCK MOUNTED-INCLUDES COMPRESSOR); CONCRETE PAVER (1 DRUM-1/2 YD. OR LARGER); ELEVATOR (OTHER THAN PASSENGER); MAINTENACNE PERSON; PUMP (2 OR MORE-4-IN. UP TO 6-IN. DISCHARGE- GAS OR DIESEL POWERED- EXCLUDING SUBMERSIBLE PUMPS); PUMPCRETE MACHINE (AND SIMILAR EQUIPMENT); WAGON DRILL (MULTIPLE); WELDING MACHINE OR GENERATOR( 2 OR MORE- 300 AMP. OR LARGER - GAS OR DIESEL POWERED). (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $40.52 | $25.25 | $65.77 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 3- AIR COMPRESSORS (600 CFM OR LARGER); AIR COMPRESSORS (2 OR MORE-LESS THAN 600 CFM); BOOM TRUCK (NON-SWINGING, NON-POWERED TYPE BOOM); CONCRETE BREAKER (SELF-PROPELLED OR TRUCK MOUNTED-INCLUDES COMPRESSOR); CONCRETE PAVER (1 DRUM-1/2 YD. OR LARGER); ELEVATOR (OTHER THAN PASSENGER); MAINTENACNE PERSON; PUMP (2 OR MORE-4-IN. UP TO 6-IN. DISCHARGE- GAS OR DIESEL POWERED- EXCLUDING SUBMERSIBLE PUMPS); PUMPCRETE MACHINE (AND SIMILAR EQUIPMENT); WAGON DRILL (MULTIPLE); WELDING MACHINE OR GENERATOR( 2 OR MORE- 300 AMP. OR LARGER - GAS OR DIESEL POWERED). (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $40.52 | $25.25 | $65.77 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 2- BOOM TRUCK (POWER SWING TYPE BOOM); CRUSHER; HOIST; PUMP (1 OR MORE - 6-IN. DISCHARGE OR LARGER- GAS OR DIESEL- POWERED OR POWERED BY GENERATOR OF 300 AMPERES OR MORE- INCLUSIVE OF GENERATOR); SIDE BOOM TRACTOR (SMALLER THAN TYPE D-4 OR EQUIVALENT); TRACTOR (PNEU-TIRED, OTHER THAN BACKHOE OR FRONT END LOADER); TRENCHER (8-FT. DIGGING CAPACITY AND SMALLER); VAC TRUCK AND END DUMP OPERATOR. (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $41.25 | $25.25 | $66.50 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 2- BOOM TRUCK (POWER SWING TYPE BOOM); CRUSHER; HOIST; PUMP (1 OR MORE - 6-IN. DISCHARGE OR LARGER- GAS OR DIESEL- POWERED OR POWERED BY GENERATOR OF 300 AMPERES OR MORE- INCLUSIVE OF GENERATOR); SIDE BOOM TRACTOR (SMALLER THAN TYPE D-4 OR EQUIVALENT); TRACTOR (PNEU-TIRED, OTHER THAN BACKHOE OR FRONT END LOADER); TRENCHER (8-FT. DIGGING CAPACITY AND SMALLER); VAC TRUCK AND END DUMP OPERATOR. (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $41.25 | $25.25 | $66.50 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 1- BACKFILLER TAMPER; BACKHOE; BATCH PLANT OPERATOR (CONCRETE); CLAMSHELL; CONCRETE PAVER (2 DRUMS OR LARGER); CONVERYOR LOADER (EUCLID TYPE); CRANE (CRAWLER, TRUCK TYPE OR PILE DRIVING); DOZER; DRAGLINE; ELEVATING GRADER; ENDLOADER; GRADALL (AND SIMILAR TYPE MACHINE); GRADER; MECHANIC; POWER SHOVEL; ROLLER (ASPHALT); SCRAPER (SELF-PROPELLED OR TRACTOR DRAWN); SIDE BOOM TRACTOR (TYPE D-4 OR EQUIVALENT AND LARGER); SLIP FORM PAVER; SLOPE PAVER; TRENCHER (OVER 8 FT. DIGGING CAPACITY); WELL DRILLING RIG; CONCRETE PUMP WITH BOOM OPERATOR; HYDRO EXCAVATOR. (AREA 2: ALCONA, ALLEGAN, ALGER, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY, BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX, CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA, DICKINSON, EATON, EMMET, GLADWIN, GOGEBIC, GRAND TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA, IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT, KWEENAW, LAKW, LEELANAU, LENAWEE, LUCE, MACKINAC, MANISTEE, MARQUETTE, MASON, MECOSTA, MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MUSKEGON, NEWAYGO, OCEANA, OGEMAW, ONTONAGON, OSCEOLA, OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, SANILAC, SCHOOLCRAFT, SHIAWASSEE, ST. JOSEPH, RUSCOLA, VAN BUREN, AND WEXFORD COUNTIES) | $45.98 | $25.25 | $71.23 | |
| OPERATOR: POWER EQUIPMENT, UNDERGROUND CONSTRUCTION Highway ENGI0324-005 (INCLUDING SEWER): GROUP 1 (AREA 1: GENESEE, LAPEER, LIVINGSTON, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASTENAW, AND WAYNE COUNTIES) | $45.98 | $25.25 | $71.23 | |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER Residential ENGI0325-028 (LAPEER & LIVINGSTON COUNTIES) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $48.98 | $25.25 | $74.23 | |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE WITH BOOM AND JIB OR LEADS 400' OR LONGER Residential ENGI0325-006 (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. | $51.29 | $25.35 | $76.64 | |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK Residential ENGI0325-028 (LAPEER & LIVINGSTON COUNTIES) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $45.68 | $25.25 | $70.93 | |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM AND JIB OR LEADS 300' OR LONGER Residential ENGI0325-006 (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. | $49.79 | $25.35 | $75.14 | |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; BULLDOZER; CRANE; GRADER/BLADE; LOADER; AND SCRAPER Residential ENGI0325-028 (LAPEER & LIVINGSTON COUNTIES) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $44.00 | $25.25 | $69.25 | |
| OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER Residential ENGI0325-006 (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. | $48.29 | $25.35 | $73.64 | |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/ SKID LOADER Residential ENGI0325-028 (LAPEER & LIVINGSTON COUNTIES) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $41.32 | $25.25 | $66.57 | |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK Building ENGI0324-011 (OVER 20' LIFT) 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | |
| OPERATOR: POWER EQUIPMENT: GROUP 4 CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER Residential ENGI0325-006 (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. | $47.99 | $25.35 | $73.34 | |
| OPERATOR: POWER EQUIPMENT: GROUP 5 BOOM TRUCK Building ENGI0324-011 (NON-SWINGING) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $39.57 | $25.25 | $64.82 | |
| OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM AND JIB OR LEADS 120' OR LONGER Residential ENGI0325-006 (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. | $47.17 | $25.35 | $72.52 | |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK Building ENGI0324-011 (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $33.71 | $25.25 | $58.96 | |
| OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR Residential ENGI0325-006 (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. . | $46.31 | $25.35 | $71.66 | |
| OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR; BOBCAT/SKID LOADER; BULLDOZER; GRADER/BLADE; SCRAPER; LOADER Residential ENGI0325-006 (MACOMB & WAYNE COUNTIES) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. | $45.34 | $25.35 | $70.69 | |
| PAINTER Highway PAIN0022-002 (HILLSDALE, JACKSON AND LENAWEE COUNTIES; LIVINGSTON COUNTY (EAST OF THE EASTERN CITY LIMITS OF HOWELL, NOT INCLUDING THE CITY OF HOWELL, NORTH TO THE GENESEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE); MACOMB, MONROE, OAKLAND, WASHTENAW AND WAYNE COUNTIES). FOOTNOTES: FOR ALL SPRAY WORK AND JOURNEYMAN RIGGING FOR SPRAY WORK, ALSO BLOWING OFF, $0.80 PER HOUR ADDITIONAL (APPLIES ONLY TO WORKERS DOING RIGGING FOR SPRAY WORK ON OFF THE FLOOR WORK. DOES NOT INCLUDE SETTING UP OR MOVING RIGGING ON FLOOR SURFACES, NOR DOES IT APPLY TO WORKERS ENGAGED IN COVERING UP OR TENDING SPRAY EQUIPMENT. FOR ALL SANDBLASTING AND SPRAY WORK PERFORMED ON HIGHWAY BRIDGES, OVERPASSES, TANKS OR STEEL, $0.80 PER HOUR ADDITIONAL. FOR ALL BRUSHING, CLEANING AND OTHER PREPARATORY WORK (OTHER THAN SPRAYING OR STEEPLEJACK WORK) AT SCAFFOLD HEIGHTS OF FIFTY (50) FEET FROM THE GROUND OR HIGHER, $0.50 PER HOUR ADDITIONAL. FOR ALL PREPARATORIAL WORK AND PAINTING PERFORMED ON OPEN STEEL UNDER FORTY (40) FEET WHEN NO SCAFFOLDING IS INVOLVED, $0.50 PER HOUR ADDITIONAL. FOR ALL SWING STAGE WORK-WINDOW JACKS AND WINDOW BELTS-EXTERIOR AND INTERIOR, $0.50 PER HOUR ADDITIONAL. FOR ALL SPRAY WORK AND SANDBLASTER WORK TO A SCAFFOLD HEIGHT OF FORTY (40) FEET ABOVE THE FLOOR LEVEL, $0.80 PER HOUR ADDITIONAL. FOR ALL PREPARATORIAL WORK AND PAINTING ON ALL HIGHWAY BRIDGES OR OVERPASSES UP TO FORTY (40) FEET IN HEIGHT, $0.50 PER HOUR ADDITIONAL. FOR ALL STEEPLEJACK WORK PERFORMED WHERE THE ELEVATION IS FORTY (40) FEET OR MORE, $1.25 PER HOUR ADDITIONAL | $25.06 | $14.75 | $39.81 | |
| PAINTER Highway PAIN0845-003 (CLINTON COUNTY; EATON COUNTY (DOES NOT INCLUDE THE TOWNSHIPS OF BELLEVUE AND OLIVET); INGHAM COUNTY; IONIA COUNTY (EAST OF HWY. M 66); LIVINGSTON COUNTY (WEST OF THE EASTERN CITY LIMITS OF HOWELL, INCLUDING THE CITY OF HOWELL, NORTH TO THE GENESEE COUNTY LINE AND SOUTH TO THE WASHTENAW COUNTY LINE); AND SHIAWASSEE COUNTY (TOWNSHIPS OF BENNINGTON, LAINGSBURY AND PERRY)) | $25.49 | $13.74 | $39.23 | |
| PAINTER Highway PAIN0845-015 (MUSKEGON COUNTY; NEWAYGO COUNTY (EXCEPT THE TOWNSHIPS OF BARTON, BIG PRAIRIE, BROOKS, CROTON, ENSLEY, EVERETT, GOODWELL, GRANT, HOME, MONROE, NORWICH AND WILCOX); OCEANA COUNTY; OTTAWA COUNTY (EXCEPT THE TOWNSHIPS OF ALLENDALE, BLENDONE, CHESTER, GEORGETOWN, HOLLAND, JAMESTOWN, OLIVE, PARK, POLKTON, PORT SHELDON, TALLMADGE, WRIGHT AND ZEELAND):) | $25.49 | $13.74 | $39.23 | |
| PAINTER Highway PAIN0845-018 (ALLEGAN COUNTY (TOWNSHIPS OF DORR, FILLMORE, HEATH, HOPKINS, LAKETOWN, LEIGHTON, MANLIUS, MONTEREY, OVERISEL, SALEM, SAUGATUCK AND WAYLAND); IONIA COUNTY (WEST OF HWY. M-66); KENT, MECOSTA AND MONTCALM COUNTIES; NEWAYGO COUNTY (TOWNSHIPS OF BARTON, BIG PRAIRIE, BROOKS, CROTON, ENSLEY, EVERETT, GOODWELL, GRANT, HOME, MONROE, NORWICH AND WILCOX); OSCEOLA COUNTY (SOUTH OF HWY. #10); OTTAWA COUNTY (TOWNSHIPS OF ALLENDALE, BLENDONE, CHESTER, GEORGETOWN, HOLLAND, JAMESTOWN, OLIVE, PARK, POLK | $25.49 | $13.74 | $39.23 | |
| PAINTER Highway PAIN1011-003 (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT COUNTIES) FOOTNOTES: HIGH PAY (BRIDGES, OVERPASSES, WATERTOWER): 30 TO 80 FT.: $.65 PER HOUR ADDITIONAL. 80 FT. AND OVER: $1.30 PER HOUR ADDITIONAL | $24.66 | $14.99 | $39.65 | |
| PAINTER Highway PAIN1474-002 (HURON COUNTY; LAPEER COUNTY (EAST OF HWY. M-53); ST. CLAIR, SANILAC AND TUSCOLA COUNTIES) ADDITIONAL. WORK WITH ANY HAZARDOUS MATERIAL: $1.00 PER HOUR ADDITIONAL. SANDBLASTING, STEAM CLEANING AND ACID CLEANING: $1.00 PER HOUR ADDITIONAL. LADDER WORK AT OR ABOVE 40 FT., SCAFFOLD WORK AT OR ABOVE 40 FT., SWING STAGE, BOATSWAIN CHAIR, WINDOW JACKS AND ALL WORK PERFORMED OVER A FALLING HEIGHT OF 40 FT.: $1.00 PER HOUR ADDITIONAL. SPRAY GUN WORK, PICK PULLERS AND THOSE HANDLING NEEDLES, BLOWING OFF BY AIR PRESSURE, AND ANY PERSON RIGGING (SETTING UP AND MOVING OFF THE GROUND): $1.00 PER HOUR ADDITIONAL. STEEPLEJACK, TANKS, GAS HOLDERS, STACKS, FLAG POLES, RADIO TOWERS AND BEACONS, POWER LINE TOWERS, BRIDGES, ETC.: $1.00 PER HOUR ADDITIONAL, PAID FROM THE GROUND UP | $23.79 | $12.02 | $35.81 | |
| PAINTER: BRUSH & ROLER (WEST OF HWY. M-53) Heavy PAIN1052-010 | $32.58 | $18.12 | $50.70 | |
| PAINTER: BRUSH & ROLER (WEST OF HWY. M-53) Building PAIN1052-007 | $32.58 | $18.12 | $50.70 | |
| PAINTER: BRUSH & ROLLER (EAST OF HWY. M-53) Heavy PAIN1474-006 | $23.79 | $12.02 | $35.81 | |
| PAINTER: BRUSH AND ROLLER Highway PAIN0312-001 (EXCLUDES: ALLEGAN COUNTY (TOWNSHIPS OF DORR, FILLMORE, HEATH, HOPKINS, LAKETOWN, LEIGHTON, MANLIUS, MONTEREY, OVERISEL, SALEM, SAUGATUCK AND WAYLAND); INCLUDES: BARRY, BERRIEN, BRANCH, CALHOUN, CASS, HILLSDALE, KALAMAZOO, ST. JOSEPH, VAN BUREN) | $23.74 | $13.35 | $37.09 | |
| PAINTER: BRUSH AND ROLLER Residential PAIN0022-008 (LIVINGSTON (EAST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY), MACOMB & WAYNE COUNTIES) | $20.14 | $14.72 | $34.86 | |
| PAINTER: BRUSH AND ROLLER Residential PAIN0845-025 (LIVINGSTON COUNTY (CITY OF HOWELL & WEST OF HOWELL, NORTH TO GENESEE COUNTY & SOUTH TO WASHTENAW COUNTY)) | $21.84 | $18.63 | $40.47 | |
| PAINTER: BRUSH AND ROLLER Residential PAIN1052-005 (LAPEER COUNTY (WEST OF HWY. M-53)) | $22.25 | $11.10 | $33.35 | |
| PAINTER: BRUSH AND ROLLER Residential PAIN1474-001 (LAPEER COUNTY (EAST OF HWY. M-53)) | $23.79 | $12.02 | $35.81 | |
| PAINTER: BRUSH, ROLLER AND SPRAY Building PAIN1474-004 (EAST OF HWY. M-53) | $23.79 | $12.02 | $35.81 | |
| PAINTER: DRYWALL FINISHING/TAPING Building PAIN1474-004 (EAST OF HWY. M-53) | $23.79 | $12.02 | $35.81 | |
| PAINTER: SPRAY (EAST OF HWY. M-53) Heavy PAIN1474-006 | $24.79 | $12.02 | $36.81 | |
| PAINTER: SPRAY (WEST OF HWY. M-53) Heavy PAIN1052-010 | $31.01 | $17.19 | $48.20 | |
| PAINTER: SPRAY (WEST OF HWY. M-53) Building PAIN1052-007 | $31.01 | $17.29 | $48.30 | |
| PAINTER: SPRAY, SANDBLAST, SIGN PAINTING Highway PAIN0312-001 (EXCLUDES: ALLEGAN COUNTY (TOWNSHIPS OF DORR, FILLMORE, HEATH, HOPKINS, LAKETOWN, LEIGHTON, MANLIUS, MONTEREY, OVERISEL, SALEM, SAUGATUCK AND WAYLAND); INCLUDES: BARRY, BERRIEN, BRANCH, CALHOUN, CASS, HILLSDALE, KALAMAZOO, ST. JOSEPH, VAN BUREN) | $24.94 | $13.35 | $38.29 | |
| PILEDRIVERMAN Heavy CARP0706-016 Scope differs by code/WD | $24.32 | $18.65 | $42.97 | |
| PILEDRIVERMAN Heavy CARP0706-016 Scope differs by code/WD | $24.32 | $18.65 | $42.97 | |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION Building PLUM0370-003 | $46.61 | $22.95 | $69.56 | |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY Residential PLUM0190-008 (LIVINGSTON COUNTY (TOWNSHIPS OF GREEN OAK AND HAMBURG)) | $44.31 | 0.00 | $44.31 | |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY Residential PLUM0190-008 (LIVINGSTON COUNTY (TOWNSHIPS OF GREEN OAK AND HAMBURG)) | $44.31 | 0.00 | $44.31 | |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY Residential PLUM0333-011 (LIVINGSTON COUNTY (EXCEPT THE TOWNSHIPS OF BRIGHTON, GREEN OAK AND HAMBURG):) | $31.35 | $22.90 | $54.25 | |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY Residential PLUM0370-005 (LAPEER COUNTY) | $26.46 | $20.60 | $47.06 | |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY Residential PLUM0636-006 (LIVINGSTON (TOWNSHIP OF BRIGHTON), MACOMB & WAYNE COUNTIES) | $41.61 | $29.35 | $70.96 | |
| PLASTERER Building PLAS0067-004 | $30.63 | $14.07 | $44.70 | |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION Building PLUM0370-003 | $46.61 | $22.95 | $69.56 | |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION Residential PLUM0098-007 (LIVINGSTON (TOWNSHIP OF BRIGHTON), MACOMB & WAYNE COUNTIES) | $27.06 | $23.52 | $50.58 | |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION Residential PLUM0190-008 (LIVINGSTON COUNTY (TOWNSHIPS OF GREEN OAK AND HAMBURG)) | $42.26 | $23.70 | $65.96 | |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION Residential PLUM0190-008 (LIVINGSTON COUNTY (TOWNSHIPS OF GREEN OAK AND HAMBURG)) | $42.26 | $23.70 | $65.96 | |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION Residential PLUM0333-011 (LIVINGSTON COUNTY (EXCEPT THE TOWNSHIPS OF BRIGHTON, GREEN OAK AND HAMBURG):) | $31.35 | $22.90 | $54.25 | |
| PLUMBER: EXCLUDING HVAC PIPE INSTALLATION Residential PLUM0370-005 (LAPEER COUNTY) | $26.46 | $20.60 | $47.06 | |
| PLUMBER/PIPEFITTER Heavy PLUM0370-006 | $39.81 | $20.95 | $60.76 | |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE: PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE: ALL OTHER WORK Highway PLUM0190-003 | $24.19 | $12.28 | $36.47 | |
| PLUMBER/PIPEFITTER - GAS DISTRIBUTION PIPELINE: WELDING IN CONJUNCTION WITH GAS DISTRIBUTION PIPELINE WORK Highway PLUM0190-003 | $33.03 | $20.19 | $53.22 | |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION Heavy ENGI0325-019 (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | $39.95 | $25.25 | $65.20 | |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION Heavy ENGI0325-019 (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | $40.52 | $25.25 | $65.77 | |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION Heavy ENGI0325-019 (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | $41.25 | $25.25 | $66.50 | |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION Heavy ENGI0325-019 (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | $45.98 | $25.25 | $71.23 | |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 1- BACKHOE, CRANE, GRADER, MECHANIC, DOZER Highway ENGI0325-012 (D-6 EQUIVALENT OR LARGER), SIDE BOOM (D-4 EQUIVALENT OR LARGER), TRENCHER(EXCEPT SERVICE), ENDLOADER (2 YD. CAPACITY OR GREATER). SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING PRIVATE METER SETTINGS OF PRIVATE INDUSTRIAL, GOVERNMENTAL OR OTHER PREMISES, MORE COMMONLY REFERRED TO AS ""DISTRIBUTION WORK,"" STARTING FROM THE FIRST METERING STATION, CONNECTION, SIMILAR OR RELATED FACILITY, OF THE MAIN OR CROSS COUNTRY PIPELINE AND INCLUDING DUCT INSTALLATION | $39.78 | $25.25 | $65.03 | |
| POWER EQUIPMENT OPERATORS - GAS DISTRIBUTION AND DUCT INSTALLATION WORK: GROUP 2- DOZER Highway ENGI0325-012 (LESS THAN D-6 EQUIVALENT), ENDLOADER (UNDER 2 YD. CAPACITY), SIDE BOOM (UNDER D-4 CAPACITY), BACKFILLER, PUMPS (1 OR 2 OF 6-INCH DISCHARGE OR GREATER), BOOM TRUCK (WITH POWERED BOOM), TRACTOR (WHEEL TYPE OTHER THAN BACKHOE OR FRONT ENDLOADER). TAMPER (SELF-PROPELLED), BOOM TRUCK (WITH NON-POWERED BOOM), CONCRETE SAW (20 HP OR LARGER), PUMPS (2 TO 4 UNDER 6-INCH DISCHARGE), COMPRESSOR (2 OR MORE OR WHEN ONE IS USED CONTINUOUSLY INTO THE SECOND DAY) AND TRENCHER(SERVICE). OILER, HYDRAULIC PIPE PUSHING MACHINE, GREASE PERSON AND HYDROSTATIC TESTING OPERATOR. SCOPE OF WORK: THE CONSTRUCTION, INSTALLATION, TREATING AND RECONDITIONING OF PIPELINES TRANSPORTING GAS VAPORS WITHIN CITIES, TOWNS, SUBDIVISIONS, SUBURBAN AREAS, OR WITHIN PRIVATE PROPERTY BOUNDARIES, UP TO AND INCLUDING PRIVATE METER SETTINGS OF PRIVATE INDUSTRIAL, GOVERNMENTAL OR OTHER PREMISES, MORE COMMONLY REFERRED TO AS ""DISTRIBUTION WORK,"" STARTING FROM THE FIRST METERING STATION, CONNECTION, SIMILAR OR RELATED FACILITY, OF THE MAIN OR CROSS COUNTRY PIPELINE AND INCLUDING DUCT INSTALLATION | $36.05 | $25.25 | $61.30 | |
| POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 220' OR LONGER Building SHEE0007-007 (AREA 2: LEVEL D WHEN CAPPING LANDFILL) | $42.74 | $21.53 | $64.27 | |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 1- PAVER OPERATOR Highway ENGI0324-006 (5 BAGS OR MORE); SLIP FORM PAVER; ASPHALT PAVER (SELF-PROPELLED); SHOVEL (EXCVAVATOR) INSTALLING UTILITIES OVER 20 FEET IN DEPTH | $46.21 | $25.25 | $71.46 | |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 2- ASPHALT PLANT OPERATOR; CRANE OPERATOR Highway ENGI0324-006 (DOES NOT INCLUDE WORK ON BRIDGE CONSTRUCTION PROJECTS WHEN THE CRANE OPERATOR IS ERECTING STRUCTURAL COMPONENTS); DRAGLINE OPERATOR; SHOVEL (EXCAVATOR) OPERATOR; LOCOMOTIVE OPERATOR; ELEVATING GRADER OPERATOR; PILE DRIVING OPERATOR; ROLLER OPERATOR (ASPHALT); BLADE GRADER OPERATOR; TRNECHING MACHINE OPERATOR (LADDER OR WHEEL TYPE); AUTO-GRADER; SELF-PROPELLED OR TRACTOR-DRAWN SCRAPER; CONVEYOR LOADER OPERATOR (EUCLID TYPE); BULLDOZER; HOISTING ENGINEER; TRACTOR OPERATOR; FINISHING MACHINE OPERATOR (ASPHALT); MECHANIC; PUMP OPERATOR (6-IN. DISCHARGE OR OVER, GAS, DIESEL POWERED OR GENERATOR OF 300 AMP. OR LARGER); SHOULDERING OR GRAVEL DISTRIBUTING MACHINE OPERATOR (SELF-PROPELLED); BACKHOE (WITH OVER 3/8 YD. BUCKET); SIDE BOOM TRACTOR (TYPE D-4 OR EQUIVALENT OR LARGER); TUBE FINISHER (SLIP FORM PAVING); GRADALL (AND SIMILAR TYPE MACHINE); ASPHALT PLANNER (SELF-PROPELLED); BATCH PLANT (CONCRETE-CENTRAL MIX); SLURRY MACHINE (ASPHALT); CONCRETE PUMP (3 IN.C AND OVER); ROTO-MILL; SWINGING BOOM TRUCK (OVER 12 TON CAPACITY); HYDRO DEMOLISHER (WATER BLASTER); FARM-TYPE TRACTOR WITH ATTACHED PAN; VACUUM TRUCK OPERATOR; BATCH PLANT (CONCRETE DRY BATCH); CONCRETE SAW OPERATOR (40 H.P. OR OVER); TRACTOR OPERATOR (FARM TYPE); FINISHING MACHINE OPERATOR (CONCRETE); GRADER OPEARTOR (SELF-PROPELLED FINE GRADE OR FORM (CONCRETE)); TRACTOR OPERATOR (FARM TYPE WITH ATTACHMENT); WAGON DRILL OPERATOR; BOOM OR WINCH HOIST TRUCK OPERATOR. | $45.06 | $25.25 | $70.31 | |
| POWER EQUIPMENT OPERATORS:, AIRPORT, BRIDGE & HIGHWAY CONSTRUCTION: GROUP 4- BOILER FIRE TENDER; CONCRETE BREAKER; OILER; FIRE TENDER; TRENCHER Highway ENGI0324-006 (SERVICE); FLEXPLANE OPERATOR; CLEFTPLANE OPERATOR; ROLLER OPERATOR (OTHER THAN ASPHALT); CURING EQUIPMENT OPERATOR (SELF-PROPELLED); POWER BIN OPERATOR; PLANT DRIER OPERATOR (ASPHALT); VIBRATORY COMPCTION EQUIPMENT OPEARTOR (6 FT. WIDE OR OVER); GUARD POST DRIVER OPERATOR (POWER DRIVEN); ALL MULCHING EQUIPMENT; STUMP REMOVER; CONCRETE PUM (UNDER 3-IN.); MESH INSTALLER (SELF-PROPELLED); END DUMP; SKID STEER. | $37.77 | $25.25 | $63.02 | |
| ROOFER Building ROOF0149-005 | $30.38 | $19.97 | $50.35 | |
| ROOFER (LAPEER COUNTY) Residential ROOF0149-022 | $30.38 | $19.87 | $50.25 | |
| ROOFER (LIVINGSTON COUNTY) Residential ROOF0070-009 | $42.67 | $21.62 | $64.29 | |
| ROOFER (MACOMB & WAYNE COUNTIES) Residential ROOF0149-023 | $42.68 | $28.75 | $71.43 | |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (LAPEER COUNTY) Residential SHEE0007-016 | $24.88 | $8.76 | $33.64 | |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (LIVINGSTON COUNTY) Residential SHEE0007-026 | $32.00 | $10.73 | $42.73 | |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION (MACOMB & WAYNE COUNTIES) Residential SHEE0080-006 | $28.67 | $9.50 | $38.17 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Residential SUMI2010-026 | $22.32 | $4.51 | $26.83 | |
| SPRINKLER FITTER (FIRE SPRINKLERS) Building SFMI0669-001 | $41.34 | $27.39 | $68.73 | |
| TILE SETTER (LAPEER & LIVINGSTON COUNTIES) Residential BRMI0009-007 | $26.93 | $18.69 | $45.62 | |
| TILE SETTER (MACOMB & WAYNE COUNTIES) Residential BRMI0001-003 | $40.53 | $23.62 | $64.15 | |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS Highway TEAM0007-004 (AREA 2: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, WASHTENAW, AND WAYNE COUNTIES) FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.65 | $0.75 | $34.40 | |
| TRUCK DRIVER EUCLIDS, DOUBLE BOTTOMS AND LOWBOYS Highway TEAM0007-004 (AREA 1: REMAINING COUNTIES) FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.55 | $0.75 | $34.30 | |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS Highway TEAM0007-004 (AREA 2: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, WASHTENAW, AND WAYNE COUNTIES) FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.50 | $0.75 | $34.25 | |
| TRUCK DRIVER TRUCKS UNDER 8 CU. YDS Highway TEAM0007-004 (AREA 1: REMAINING COUNTIES) FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.40 | $0.75 | $34.15 | |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER Highway TEAM0007-004 (AREA 2: GENESEE, LIVINGSTON, MACOMB, MONROE, OAKLAND, WASHTENAW, AND WAYNE COUNTIES). FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.50 | $0.75 | $34.25 | |
| TRUCK DRIVER TRUCKS, 8 CU. YDS. AND OVER Highway TEAM0007-004 (AREA 1: REMAINING COUNTIES) FOOTNOTE: +A +B TO FRINGE BENEFITS. A. $470.70 PER WEEK B. $68.70 DAILY | $33.40 | $0.75 | $34.15 | |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1- TRUCK DRIVER ON ALL TRUCKS Highway TEAM0247-010 (EXCEPT DUMP TRUCKS OF 8 CUBIC YARDS CAPACITY OR OVER, POLE TRAILERS, SEMIS, LOW BOYS, EUCLID, DOUBLE BOTTOM AND FUEL TRUCKS). SCOPE OF WORK: EXCAATION, SITE PREPARATION, LAND BALANCING, GRADING, SEWERS, UTILITIES AND IMPROVEMENTS; ALSO INCLUDING BUT NOT LIMITED TO TUNNELS, UNDERGROUND PIPING, RETENTION, OXIDATION, FLOCCULATION FACILITIES, CONDUITS, GENERAL EXCAVATION AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. UNDERGROUND CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, TANKSGIVING DAY, AND CHRISTMAS DAY. (AREA 2 GENESEE, MACOMB, MONROE, OAKLAND, ST. CLAIR, WASHTENAW, AND WAYNE COUNTIES) | $24.12 | $19.04 | $43.16 | |
| TRUCK DRIVER, UNDERGROUND CONSTRUCTION: GROUP 1- TRUCK DRIVER ON ALL TRUCKS Highway TEAM0247-010 (EXCEPT DUMP TRUCKS OF 8 CUBIC YARDS CAPACITY OR OVER, POLE TRAILERS, SEMIS, LOW BOYS, EUCLID, DOUBLE BOTTOM AND FUEL TRUCKS). SCOPE OF WORK: EXCAATION, SITE PREPARATION, LAND BALANCING, GRADING, SEWERS, UTILITIES AND IMPROVEMENTS; ALSO INCLUDING BUT NOT LIMITED TO TUNNELS, UNDERGROUND PIPING, RETENTION, OXIDATION, FLOCCULATION FACILITIES, CONDUITS, GENERAL EXCAVATION AND STEEL SHEETING FOR UNDERGROUND CONSTRUCTION. UNDERGROUND CONSTRUCTION WORK SHALL NOT INCLUDE ANY STRUCTURAL MODIFICATIONS, ALTERATIONS, ADDITIONS AND REPAIRS TO BUILDINGS OR HIGHWAY WORK, INCLUDING ROADS, STREETS, BRIDGE CONSTRUCTION AND PARKING LOTS OR STEEL ERECTION. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, TANKSGIVING DAY, AND CHRISTMAS DAY. (AREA 1: LAPEER AND SHIAWASSEE COUNTIES) | $23.82 | $19.04 | $42.86 | |
| TRUCK DRIVER: DUMP TRUCK Residential SUMI2010-026 | $17.00 | $5.71 | $22.71 | |
| TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY Heavy TEAM0007-008 | $33.30 | $0.75 | $34.05 | |
| TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER Heavy TEAM0007-008 | $33.40 | $0.75 | $34.15 | |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK DAILY Heavy TEAM0007-008 | $33.55 | $0.75 | $34.30 | |
| TRUCK DRIVER: OFF THE ROAD TRUCK Heavy SUMI2010-061 | $20.82 | $3.69 | $24.51 | |
| TRUCK DRIVER: PICKUP Residential TEAM0247-005 (MACOMB & WAYNE COUNTIES) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $438.45 PER WEEK, PLUS $64.50 PER DAY | $31.03 | $0.70 | $31.73 | |
| TRUCK DRIVER: TRACTOR HAUL TRUCK Building SUMI2011-014 | $13.57 | $1.18 | $14.75 |
No trade rates match your search and filter selection.
Highway
Applies to
Alcona, Alger, Allegan, Alpena, Antrim, Arenac, Baraga, Barry, Bay, Benzie +73 more
Residential
Applies to
Lapeer, Livingston, Macomb, Wayne
Heavy
Building